Vantage Data Centers

Vantage Data Centers develops, owns and operates large data center campuses for hyperscalers, cloud providers and large enterprises across North America, EMEA and Asia Pacific. DigitalBridge and its investors have owned the company since 2017, and it is based in Denver, Colorado. Its EMEA business runs campuses in markets including Berlin, Frankfurt, Johannesburg, Milan, Warsaw, Zurich and Wales.

Vantage Data Centers History:

  • In January 2017, Digital Bridge Holdings acquired Vantage from Silver Lake Partners.
  • Founded in 2010 in Santa Clara, California.

Vantage Data Centers Data Center Map

Vantage Data Centers Power Growth Over Time

+192% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Vantage Data Centers Locations

Vantage: MXP21

Milan

Located in Castelletto, about 15 kilometers from the city center, the MXP2 campus will span 10,000 square meters (108,000 square feet) and feature two three-story buildings.

View Data Center

Vantage: QC61

Montreal

QC61 is Vantage's Montreal III (QC6) campus at 205 boulevard Brunswick in Pointe-Claire, a single-storey data centre with two data modules on 8 acres. Hypertec first announced the site as YUL02 in 2019, and Vantage built it from January 2022. The first phase came online in December 2022 and the final phase in December 2025.

View Data Center

Vantage: QC41

Montreal

QC41 is one of three data centre buildings on Vantage's Montreal II (QC4) campus at 2800 route Transcanadienne in Pointe-Claire, near Montréal-Trudeau airport. Hypertec built it as part of its YUL01 campus, and Vantage acquired Hypertec's hyperscale data centre business in November 2020. The 10-acre campus totals about 320,000 gross sq ft.

View Data Center

Vantage: QC22

Quebec City

QC22 is the second data centre building on Vantage's Quebec City (QC2) campus at 2675 boulevard du Parc-Technologique. The building was completed in 2019, the year Vantage took over 4Degrés Colocation. It sits beside QC21, the campus's original building.

View Data Center

Vantage: AZ11

Phoenix

In January 2019 Vantage announced it acquired 50 acres outside Phoenix in Goodyear, Arizona, to build a mega-scale data center campus. Construction began in early 2019, with the first phase coming online in 2022.

View Data Center

Vantage: Frontier 1

Abilene

Vantage Data Centers is making its largest investment ever, with plans to spend over $25 billion to build a massive data center campus called "Frontier" in Shackelford County, Texas.

View Data Center

Carrier-Neutral Data CenterInterested in this information?Contact us

Tokyo

Vantage plans another data center on 2.8 acres of land in Tokyo, Japan.

View Data Center

Vantage: QC21

Quebec City

QC21 is the original building on Vantage's Quebec City (QC2) campus at 2675 boulevard du Parc-Technologique. 4Degrés Colocation built it in 2014, Vidéotron bought 4Degrés in 2015, and Vantage acquired the business in January 2019. The four-building campus will total about 925,000 sq ft at completion.

View Data Center

Carrier-Neutral Data CenterInterested in this information?Contact us

Aragon

A building in Carrier-Neutral OperatorInterested in this information?Contact us' former planned campus at Villanueva de Gállego, north of Zaragoza. The promoters moved to a new site in San Mateo de Gállego in 2026.

View Data Center

Carrier-Neutral Data CenterInterested in this information?Contact us

Milan

Vantage plans to build MXP3 data center campus on 30 acres of land in Milan.

View Data Center

Carrier-Neutral Data CenterInterested in this information?Contact us

Aragon

A building in Carrier-Neutral OperatorInterested in this information?Contact us' former planned campus at Villanueva de Gállego, north of Zaragoza. The promoters moved to a new site in San Mateo de Gállego in 2026.

View Data Center

Carrier-Neutral Data CenterInterested in this information?Contact us

Aragon

A building in Carrier-Neutral OperatorInterested in this information?Contact us' former planned campus at Villanueva de Gállego, north of Zaragoza. The promoters moved to a new site in San Mateo de Gállego in 2026.

View Data Center

Carrier-Neutral Data CenterInterested in this information?Contact us

Aragon

A building in Carrier-Neutral OperatorInterested in this information?Contact us' former planned campus at Villanueva de Gállego, north of Zaragoza. The promoters moved to a new site in San Mateo de Gállego in 2026.

View Data Center

Vantage: CO21

Denver

CO21 is the first of two planned two-story buildings in Vantage's Trident Data Center at Windler site plan, on a 108-acre lot at 23001 East 48th Avenue in Aurora, Colorado.

View Data Center

Vantage: TX12

San Antonio

Vantage Data Centers is developing the TX12 facility, a two-story, 432,800 sq ft (40,208 sqm) data center in San Antonio, Texas. The $276.8 million project is scheduled for completion in August 2027.

View Data Center

Vantage: MXP11

Milan

Once fully developed, the MXP1 campus will offer 517,000 square foot (48,000 square meters) of data center space with 300W/SF (3.2kW/M²) average density.

View Data Center

Carrier-Neutral Data CenterInterested in this information?Contact us

Milan

MXP4 is a planned Carrier-Neutral OperatorInterested in this information?Contact us campus in Tavazzano con Villavesco, in the province of Lodi south-east of Milan.

View Data Center

Vantage: Bordeaux

Bordeaux

Vantage Data Centers and Altarea are planning a major AI and cloud data center campus near Bordeaux, France. The project will be developed on Altarea-owned land and marks Vantage’s first entry into the French market.

View Data Center

Vantage: Osaka KIX11

Osaka

Located in Ibaraki, the Osaka campus comprises 485,000 square feet (45,000 square meters) and features two four-story, state-of-the-art facilities built to withstand even the worst earthquakes.

View Data Center

Vantage: QC23

Quebec City

QC23 is the third building on Vantage's Quebec City (QC2) campus, at 725 rue Jean-Luc-Giroux. Vantage built it in phases from 2022 and finished it in 2025. La Caisse helped finance its later phases in 2024.

View Data Center

Vantage: QC24

Quebec City

QC24 is the fourth data centre building on Vantage's Quebec City (QC2) campus, at 725 rue Jean-Luc-Giroux. Vantage announced the CA$500 million building in February 2025. It is due to come online in early 2027.

View Data Center

Carrier-Neutral Data CenterInterested in this information?Contact us

Warsaw

WAW13 is the third planned data center on Vantage's Warsaw campus in the Bielany district.

View Data Center

Vantage Montreal

Montreal

Vantage Montreal I is a three-storey data centre on a 5-acre campus at 2900 avenue Marie-Curie in Saint-Laurent. Vidéotron opened it in September 2016 as 4Degrés Montréal, and Vantage bought it in January 2019 and added a new wing. It offers 60,000 sq ft of data centre space and holds Uptime Institute Tier III certification.

View Data Center

Vantage: QC43

Montreal

QC43 is the third and newest data centre building on Vantage's Montreal II (QC4) campus in Pointe-Claire. Vantage built the 94,000 sq ft building as part of a CA$900 million Canadian expansion announced in March 2022. It came online at the end of 2022.

View Data Center

Vantage: QC42

Montreal

QC42 is a data centre building on Vantage's Montreal II (QC4) campus at 2800 route Transcanadienne in Pointe-Claire. Hypertec built it as YUL01B. Vantage acquired it with Hypertec's hyperscale business in November 2020.

View Data Center

Vantage: Zurich II

Zurich

Vantage's second data center in Switzerland is located north of Zurich's city center in Glattfelden. Set on 1 acre, the two-story facility offers a total of 226,000 square feet (21,000 sq m) of space.

View Data Center

Carrier-Neutral Data CenterInterested in this information?Contact us

Montreal

Hypertec is developing a new campus at 7000 rue Saint-Patrick in Montreal's LaSalle borough, on former city land. In September 2025, Hypertec, Mila and 5C announced a CA$250 million Sovereign AI Research Hub at Hypertec's LaSalle campus. The hub will provide secure GPU compute for AI research.

View Data Center

Carrier-Neutral Data CenterInterested in this information?Contact us

Frankfurt

Vantage FRA41 is a data center Vantage proposes on the former toom DIY store site on Anton-Flettner-Straße in Raunheim.

View Data Center

Vantage: Baie-d'Urfé

Montreal

Vantage planned a CA$400 million data centre campus in two adjoining buildings at 21500 route Transcanadienne and 21525 avenue Clark-Graham in Baie-D'Urfé, in Montreal's West Island. Vantage bought the buildings in 2021. It cancelled the project for lack of power and sold both buildings in 2023.

View Data Center

Carrier-Neutral Data CenterInterested in this information?Contact us

Montreal

Vantage holds about 1 million sq ft (23 acres) of land on rue Marie-Victorin in Saint-Bruno-de-Montarville, on Montreal's South Shore, for a planned CA$1.2 billion campus of four two-storey data centres. Vantage bought the land in February 2019, but Quebec refused the project's power request in October 2023. Vantage still owns the site, and the town council backed the project again in December 2025.

View Data Center

Vantage: GA21

Atlanta

Vantage Data Centers is building a data center campus outside Atlanta, Georgia. The project, known as Westlake, will comprise 754,220 square feet (70,070 sq m) on undeveloped land west of Plummer Road.

View Data Center

Vantage: CA11

San Francisco Bay Area

CA11 (formerly V1) is the largest of six data centers on Vantage's Santa Clara I (CA1) campus at 2820 Northwestern Parkway. The 216,000 sq ft building houses the campus interconnection suite, now Digital Realty SJC34 (ex-Telx).

View Data Center

Vantage: BER21

Berlin

Located only 20 kilometers from BER1 campus and 10 kilometers from the Brandenburg International Airport, the campus is situated on 12 acres (five hectares) and features two data centers.

View Data Center

Vantage Cardiff CWL1

Wales

CWL11 is the original building on Vantage's Newport campus, the former LG Semicon plant at Imperial Park. Next Generation Data opened it in 2010, and Vantage bought NGD in 2020.

View Data Center

Vantage: BER22

Berlin

Located only 20 kilometers from BER1 campus and 10 kilometers from the Brandenburg International Airport, the campus is situated on 12 acres (five hectares) and features two data centers.

View Data Center

Carrier-Neutral Data CenterInterested in this information?Contact us

Frankfurt

Vantage FRA62 is a planned two-building data center campus on the Im Schleid site north of the L3008 in Bad Vilbel.

View Data Center

Carrier-Neutral Data CenterInterested in this information?Contact us

Aragon

A building in Carrier-Neutral OperatorInterested in this information?Contact us' former planned campus at Villanueva de Gállego, north of Zaragoza. The promoters moved to a new site in San Mateo de Gállego in 2026.

View Data Center

Vantage Data Centers Data Center Photos See all

Rendering of the Planned Vantage Campus in Goodyear, AZ
Source: Vantage Data Centers
Photo taken in September 2018
First Ashburn Facility Under Construction
Source: Vantage Data Centers

Photo taken in September 2018

Attendees play shuffleboard during the grand opening party for the V6 building on the Vantage Santa Clara Campus
Playing Shuffleboard in the Data Center
Source: Vantage

Attendees play shuffleboard during the grand opening party for the V6 building on the Vantage Santa Clara Campus

NGD Facility
Source: Baxtel
Rendering of Vantage's Berlin campus due to be complete in 2021
Source: Baxtel
Rendering of the first building on the Zurich campus in Winterthur
Source: Baxtel
Rendering of the new Vantage facility in Warsaw scheduled to be completed in 2021
Source: Baxtel
Rendering of Vantage's first building on the Milan campus which will be delivered in 2021
Source: Baxtel
Outside of Vantage's VA12 Facility
Source: Baxtel
Planned 5 Building Campus
Source: Vantage
Rendering
Source: Baxtel
Vantage's 1st building in Johannesburg under construction in 2021
Source: Baxtel
CJ1 data centre
Source: Baxtel
Vantage's 1st Frankfurt facility is next to Maincubes
Source: Baxtel
Drone view
Source: Baxtel
Front of Cardiff facility
Source: Baxtel
Rendering on Vantage's expansion in Cardiff
Source: Baxtel
AZ11 is the first 16-megawatt phase of a 64-MW building scheduled to open next year, with AZ12 and AZ13 being constructed to the north and west
AZ11, a two-story 144,046-sf data center with four data modules
Source: Baxtel

AZ11 is the first 16-megawatt phase of a 64-MW building scheduled to open next year, with AZ12 and AZ13 being constructed to the north and west

Province Group Powhatan Data center plan
Source: Province Group
Powhatan Data Center 1 conceptual plan
Source: Province Group
Vantage Berlin 1 Campus
Source: Baxtel
Rendering of Vantage Data Centers DUB1 Campus
Source: Vantage Data Centers
Vantage WAW11 Data Center in Warsaw
Source: Vantage Data Centers
Rendering of Vantage's Warsaw Data Center Campus at full buildout
Source: Vantage Data Centers
Vantage Santa Clara CA2 Data Center in Silicon Valley
Source: Vantage Data Centers
Vantage Montreal QC1 Data Center
Source: vanta
Vantage acquired Hypertec Saint-Laurent YUL01 data center
Source: Vantage Data Centers
Vantage Quebec City data center campus
Source: Vantage Data Centers
Rendering of Vantage's Johannesbug I Campus
Source: Vantage Data Centers
Proposed Site for Vantage's Stacks Road Project
Source: Google Maps
Site Plan of Vantage VA3 Campus in Ashburn
Source: Vantage Data Centers
Conceptual Plan for Vantage's Pittsboro Data Center in Indiana
Source: Pittsboro Town Government
Site plan for Vantage's Bridgend campus in Wales
Source: Vantage Data Centers
Vantage Plans Data Center Campus near Millersport, Ohio
Source: Google Maps
Yondr's Johor Data Center in Malaysia
Source: Yondr
Sitemap for Vantage's CWL21 data center in Wales
Source: Vantage Data Centers
Rendering of Vantage's CWL2 data center
Source: Vantage Data Centers
Rendering of Vantage's MXP2 campus in Milan, Italy
Source: Vantage Data Centers

Related News See all

Read Vantage Drops 500MW Trident Data Center After Aurora Moratorium
Vantage Data Centers has dropped its Trident data center in Aurora, Colorado, after the city council approved a moratorium on new data center applications. Council members voted unanimously on Nov....

Vantage Drops 500MW Trident Data Center After Aurora Moratorium

November 25, 2026 Vantage Data Centers

Vantage Data Centers has dropped its Trident data center in Aurora, Colorado, after the city council approved a moratorium on new data center applications. Council members voted unanimously on Nov. 23 for Resolution R2026-146, which pauses new data center applications west and south of Interstate...

Read more
Read Blue Owl Digital Infrastructure Trust Buys 54MW Gainesville Data Center
Blue Owl Digital Infrastructure Trust closed the purchase of a 54MW data center in Gainesville, Virginia, for $779.5 million, [an SEC filing](https://www.sec.gov/Archives/edgar/data/2069692/0002069...

Blue Owl Digital Infrastructure Trust Buys 54MW Gainesville Data Center

November 23, 2026 Northern Virginia

Blue Owl Digital Infrastructure Trust closed the purchase of a 54MW data center in Gainesville, Virginia, for $779.5 million, an SEC filing shows. The trust's subsidiary NVA11C LLC bought the membership interests in GCDC Purchaser Phase 3 LLC, which holds title to the building, from US GCDC...

Read more
Read Lambda Deploys Nvidia Photonics Switches Across 10,000 GPUs At QScale Campus
Lambda has deployed Nvidia Photonics co-packaged optics (CPO) switches at a QScale data center in Lévis, Quebec, connecting more than 10,000 Nvidia Blackwell Ultra GPUs. [Lambda announced](https://...

Lambda Deploys Nvidia Photonics Switches Across 10,000 GPUs At QScale Campus

November 23, 2026 Quebec City

Lambda has deployed Nvidia Photonics co-packaged optics (CPO) switches at a QScale data center in Lévis, Quebec, connecting more than 10,000 Nvidia Blackwell Ultra GPUs. Lambda announced the work on Nov. 16 and calls it the world's first large-scale deployment of CPO networking in production....

Read more
Read Green Starts Heating Dielsdorf Homes With Data Center Waste Heat
Green Datacenter AG now sends waste heat from its Dielsdorf data centers into a district heating network that will eventually serve up to 11,500 households. The Swiss operator and utility Energie 3...

Green Starts Heating Dielsdorf Homes With Data Center Waste Heat

November 23, 2026 Zurich

Green Datacenter AG now sends waste heat from its Dielsdorf data centers into a district heating network that will eventually serve up to 11,500 households. The Swiss operator and utility Energie 360° commissioned the network's energy center on Nov. 19, and the first apartment buildings in...

Read more
Read CyrusOne and KEP Top Out 48MW OSK1 Data Center in Japan
CyrusOne and Kansai Electric Power Company have [topped out OSK1](https://www.facebook.com/CyrusOne/posts/cyrusone-keps-first-data-center-in-japan-designed-to-deliver-48-mw-of-it-capacit/1631891085...

CyrusOne and KEP Top Out 48MW OSK1 Data Center in Japan

November 20, 2026 Osaka

CyrusOne and Kansai Electric Power Company have topped out OSK1, the first data center under their Japanese joint venture, at a planned 48MW of IT capacity. CyrusOne and KEP marked the structural completion this week with a traditional Jōtōshiki ceremony. CyrusOne KEP, the 50:50 joint venture the...

Read more
Read DC BLOX Files For Third Atlanta West Building, 80MW Due In 2029
DC BLOX filed a development of regional impact notice for a third building at its Atlanta West campus in Georgia, [Data Center Dynamics reported](https://www.datacenterdynamics.com/en/news/dc-blox-...

DC BLOX Files For Third Atlanta West Building, 80MW Due In 2029

November 19, 2026 Atlanta

DC BLOX filed a development of regional impact notice for a third building at its Atlanta West campus in Georgia, Data Center Dynamics reported. The filing with the Georgia Department of Community Affairs covers ATL1-C, a 500,000-square-foot data center at 1800 North River Road in Douglasville....

Read more

Company Hierarchy (3)

Documents See all

Get Quotes
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.