Vantage: JHB13

Latest Podcast Sedenak Tech Park, Plot 32
Planned
Future facility in planning stage
Operated by:

Vantage: JHB13

Short Code: JHB13

JHB13 is the third planned data center on Vantage's JHB1 campus in Sedenak Tech Park, Johor.

Map and Nearby Locations

Sedenak Tech Park, Plot 32
Vantage Data Centers Sites
Nearby Facilities

Sites within 15 miles of Vantage: JHB13

Distance Site About
0.10 miles Vantage: JHB12
JHB12 is the second planned data center on Vantage's JHB1 campus in Sedenak Tech Park, Johor.
0.20 miles Princeton PDG: JH1 Bldg-1
Occupying 128,000 m² of land, JH1 is a carrier-neutral site featuring a design PUE of ≤1.4. The campus will consist of four buildings, the first of which successfully came online in July 2024. https://princetondg.com/malaysia/jh1/
0.21 miles Bridge DC: MY06-4
A smaller expansion project on Bridge Data Centres' Sedenak MY06 campus, built for anchor tenant ByteDance.
0.23 miles Princeton PDG: JH1 Bldg-2
This facility is part of Princeton PDG's JH1 Campus in Johor.
0.25 miles Vantage: JHB11
JHB11 is the first data center on Vantage's JHB1 campus in Sedenak Tech Park, Johor.
0.26 miles Bridge DC: MY06-1
The first building on Bridge Data Centres' Sedenak MY06 campus, assembled from close to 400 prefabricated modules made in China and leased to anchor tenant ByteDance.
0.33 miles Princeton PDG: JH1 Bldg-3
PDG successfully topped out the third building of its JH1 campus in late 2025.
0.33 miles Bridge DC: MY06-2
The second building on Bridge Data Centres' Sedenak MY06 campus and its first phase to use immersion cooling, serving anchor tenant ByteDance.
0.35 miles Princeton PDG: JH1 Bldg-4
PDG has started construction of the third building of its JH1 campus.
0.37 miles Bridge DC: MY06 Expansion
Further buildings that Bridge Data Centres markets for its Sedenak MY06 campus, which Bridge describes as a 15-building campus.
0.43 miles Bridge DC: MY06-3
The third building on Bridge Data Centres' Sedenak MY06 campus, enlarged during construction for anchor tenant ByteDance.
0.49 miles BrightRay: MY-03
This facility will be part of BrightRay's Sedenak Tech Park Campus in Johor.
0.54 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
0.55 miles BrightRay: Johor MY-01
In 2025, Malaysian pre-fab data center specialist BrightRay officially opened its first facility in Johor.
0.56 miles BrightRay: MY-02
This facility will be part of BrightRay's Sedenak Tech Park Campus in Johor.
0.56 miles K2: Kulai Expansion
0.62 miles Keppel DC: Johor Sedenak 1
0.63 miles K2: Kulai JHR04
0.74 miles K2: Kulai JHR01-03
K2 Data Centres ("K2") is building a hyperscale data center campus at Sedenak Tech Park in Johor.
1.02 miles GDC SDN: Johor SDK1
Global Data Centre Sdn. Bhd. (GDC) has officially broken ground on GDC-SDK1, a high density AI data center located in Johor’s Sedenak Tech Park.
8.68 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.27 miles YTL: JDC3
This facility is a part of YTL's Johor campus in Malaysia.
9.30 miles YTL: JDC6
This facility is a part of YTL's Johor campus in Malaysia.
9.31 miles YTL: JDC1
YTL Green Data Center Park, the region's first solar-powered data center park spanning 275 acres, is located in Johor, Malaysia.
9.33 miles YTL: JDC2
This facility is a part of YTL's Johor campus in Malaysia.
10.58 miles Cloud ParkInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
10.76 miles Princeton PDG: JH2
PDG's JH2 data center is strategically positioned in Johor's Eco Business Park at Mukim Senai, just 30 km from the company's existing JH1 campus in Sedenak Tech Park.
13.24 miles Plaza AlphaInterested in this information?Contact us
16.04 miles Center OneInterested in this information?Contact us
16.95 miles Global Switch: Johor
Global Switch plans to build a data center campus in Johor, Malaysia.
16.95 miles CURRENC: Johor
Fintech holding company CURRENC Group is venturing into data center development with a new facility in Johor, Malaysia.
16.95 miles EdgeConneX: Johor
EdgeConneX is building a huge data center campus in Johor, Malaysia.
19.03 miles ZData: Johor
Tropicana Corporation Berhad's subsidiary, Tropicana Firstwide Sdn Bhd, has entered into a land sale agreement with ZData's Malaysian unit, Computility Technology (Malaysia) Sdn Bhd.
19.62 miles NTT: Gelang Patah
NTT Data aims to develop a six buildings campus on a 68.5-acre parcel of land in Gelang Patah, Johor Bahru.
19.73 miles Stack: JHB01A
JHB01A is the first of two buildings on STACK's JHB01 campus in Iskandar Puteri, Johor: a two-storey data center with a multi-level external electrical yard, beside the campus's on-site TNB 275 kV substation. Construction began in 2025.
19.78 miles Stack: JHB01B
JHB01B is the second building planned on STACK's JHB01 campus in Iskandar Puteri, Johor, on the east side of the lot beside JHB01A and served by the campus's on-site TNB 275 kV substation.

Operating Company

Operated by:

Vantage is a wholesale datacenter provider operating in the Silicon Valley and Quincy, Washington markets.

Vantage was acquired by Digital Bridge Holdings LLC from Silver Lake Partners in January 2017.

0
Facilities
0
Markets

News See all

Read Malaysia Requires Data Centers To Source 30% Renewable Energy
Malaysia's government has approved a requirement for data centers to source at least 30 percent of their power from renewable energy. Deputy Prime Minister Datuk Seri Fadillah Yusof told the Dewan ...

Malaysia Requires Data Centers To Source 30% Renewable Energy

October 29, 2026 Malaysia

Malaysia's government has approved a requirement for data centers to source at least 30 percent of their power from renewable energy. Deputy Prime Minister Datuk Seri Fadillah Yusof told the Dewan Rakyat on October 27 that the rule applies to a data center's total capacity or its energy...

Read more
Read O-Green Replaces Vantage In 570MW Zaragoza Data Center Campus Plan
O-Green, an investment fund linked to the Sultanate of Oman, will finance a 570MW data center campus at San Mateo de Gállego in Zaragoza. The project replaces a [Vantage Data Centers](https://baxte...

O-Green Replaces Vantage In 570MW Zaragoza Data Center Campus Plan

October 23, 2026 Aragon

O-Green, an investment fund linked to the Sultanate of Oman, will finance a 570MW data center campus at San Mateo de Gállego in Zaragoza. The project replaces a Vantage Data Centers campus announced for the same area in September 2025. elEconomista reports the total investment reaches €7.446...

Read more
Read Vantage Secures 1GW Of Heron Solid-State Transformers For AI Campuses
[Vantage](https://baxtel.com/data-centers/vantage-data-centers) has reserved more than 1GW of manufacturing capacity for Heron Link, the solid-state transformer made by Heron Power Electronics, to ...

Vantage Secures 1GW Of Heron Solid-State Transformers For AI Campuses

October 22, 2026 Vantage Data Centers

Vantage has reserved more than 1GW of manufacturing capacity for Heron Link, the solid-state transformer made by Heron Power Electronics, to deploy across its hyperscale data center campuses. The agreement, announced Oct. 21, delivers medium-voltage grid power straight to 800 volts DC, cutting...

Read more
Read DayOne Adds $3.67 Billion Johor Financing, Bank Platform Hits $7.3 Billion
A seven-bank consortium has added RM15 billion, about US$3.67 billion, to [DayOne](https://baxtel.com/data-centers/dayone)'s Johor data center financing, lifting the Singapore-headquartered operato...

DayOne Adds $3.67 Billion Johor Financing, Bank Platform Hits $7.3 Billion

October 14, 2026 DayOne

A seven-bank consortium has added RM15 billion, about US$3.67 billion, to DayOne's Johor data center financing, lifting the Singapore-headquartered operator's debt platform in Malaysia's southern state to RM30 billion, or roughly US$7.3 billion. The lenders set out the upsizing in a joint...

Read more
Read Vantage Data Centers Raises $2B For North American Development Portfolio
Vantage Data Centers has secured $2 billion in financing to support early-stage development across its North American portfolio. The five-year revolving credit facility initially covers three devel...

Vantage Data Centers Raises $2B For North American Development Portfolio

September 15, 2026 Vantage Data Centers

Vantage Data Centers has secured $2 billion in financing to support early-stage development across its North American portfolio. The five-year revolving credit facility initially covers three development assets, with more eligible to be added. Vantage said the funding will accelerate project...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?