Vantage: WAW13

Latest Podcast Zgrupowania AK "Kampinos" 42D
Planned
Future facility in planning stage
Operated by:

Vantage: WAW13

Short Code: WAW13
Year Planned: 2029
PUE: 1.3
Utility Provider: E.ON Polska
Floors: 4

WAW13 is the third data center building planned for Vantage's WAW1 campus in Warsaw's Bielany district (Zgrupowania AK "Kampinos" 42D), alongside WAW11 (operational since 2022) and WAW12. Planned at ~16 MW of liquid-cooled capacity.

Map and Nearby Locations

Zgrupowania AK "Kampinos" 42D
Vantage Data Centers Sites
Nearby Facilities

Vantage: WAW13 Power Growth Over Time

Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Vantage: WAW13

Distance Site About
0.04 miles Vantage: WAW12
Vantage’s Warsaw campus in Poland sited on more than 12 acres (5 hectares) just a half hour drive from Warsaw-Chopin International Airport.
0.05 miles Vantage Warsaw WAW1
Vantage’s Warsaw campus in Poland sited on more than 12 acres (5 hectares) just a half hour drive from Warsaw-Chopin International Airport.
4.10 miles 3S Warszawa, Annopol
4.45 miles T-Mobile Warszawa-Szlachecka
In 2022, T-Mobile launched the Szlachecka data center in Warsaw, Poland.
5.60 miles EdgeConnex Warsaw
The site was acquired from Linxdatacenter in November 2018. The facility also offers connectivity to the neighboring LIM-Building ecosystem via a diverse fiber path.
5.68 miles Equinix Warsaw WA1
The site was a Telecity managed datacenter before Equinix acquired Telecity in July 2016.
5.68 miles LIM Warsaw
6.20 miles Hyperscale Data Center Request Dataset
6.32 miles Netia WARSC001
6.33 miles EdgeConneX: Warsaw 4
The data center operator EdgeConneX has reportedly secured a 15-year lease for the Digital Ursus site with Greykite European Real Estate Fund I, its affiliates, and White Star Real Estate.
6.34 miles Greykite: Warsaw
UK-based investment firm Greykite is transforming a former logistics site in Warsaw, Poland, into a data center.
6.36 miles EdgeConnex: Warsaw 3
The EdgeConneX WAW03 facility in Diamond Business Park launched in Warsaw, Poland, in 2022.
6.40 miles Data4: Warsaw 1 DC4
6.42 miles Data4: Warsaw 1 DC2
Data4’s second data center at its Jawczyce campus near Warsaw is a 10MW facility, expanding the multi-phase site toward a planned 60MW, four-building development on a 4-hectare campus.
6.43 miles Data4: Warsaw 1
In 2023, Data4 Group opened their first Polish data center in the campus located in Jawczyce, near Warsaw, on a 4 hectares site.
6.44 miles Data4: Warsaw 1 DC3
7.04 miles Switch Datacenters: Warsaw 1
7.08 miles Equinix WA3
The Warsaw WA3 data center is located in the Salomea District of Poland.
7.14 miles Equinix: WA4x
WA4x is Equinix's first xScale (Hyperscale) data center in Warsaw, powered by 100% renewable energy.
7.34 miles EdgeConnex: Warsaw 2
The EdgeConneX WAW02 facility, a hyperscale, carrier-neutral, Tier-3 designed data center offering N+1 configuration, launched in Warsaw, Poland, in 2022.
7.65 miles OVH Warsaw WAW1
7.71 miles Atman: WAW-3 Bldg3
Atman Data Center Warsaw-3 (WAW-3) Campus is located near Warsaw, the largest business hub of CEE. The campus will eventually consist of 3 buildings.
7.79 miles Atman: WAW-3 Bldg2
Atman Data Center Warsaw-3 (WAW-3) Campus is located near Warsaw, the largest business hub of CEE. The campus will eventually consist of 3 buildings.
7.88 miles Atman: Warsaw-3 Campus
Atman Data Center Warsaw-3 (WAW-3) Campus is located near Warsaw, the largest business hub of CEE. The campus will eventually consist of 3 buildings.
8.10 miles Atman: Warsaw-2
8.43 miles Hillwood: Reguły 4
This facility is part of Hillwood's Reguły Campus near Warsaw.
8.48 miles Hillwood: Reguły 2
This facility is part of Hillwood's Reguły Campus near Warsaw.
8.50 miles Hillwood: Reguły 3
This facility is part of Hillwood's Reguły Campus near Warsaw.
8.62 miles Hillwood: Reguły Campus
Property developer Hillwood is planning a data center campus on a 40-hectare site in Reguły, southwest of Warsaw. The project, which includes four planned buildings, has faced significant local pushback.
9.09 miles Aruba Poland PL1
9.10 miles Atman: Warsaw-1
10.22 miles Equinix Warsaw WA2
The site was a Telecity managed datacenter before Equinix acquired Telecity in July 2016.
10.36 miles Netia Warszawa WARSC006
11.08 miles VOLT: Warsaw 1
Volt is potentially leasing capacity from Switch's Warsaw 1 data center facility.
12.16 miles Hyperscale Data Center Request Dataset
12.19 miles Hyperscale Data Center Request Dataset
12.32 miles Hyperscale Data Center Request Dataset
Microsoft launched Polish Azure region in 2023.
15.23 miles Orange: Warsaw
In 2021, Orange opened a data center in Warsaw, Poland. The European telco's new Warsaw Data Hub facility contains four 400 sq m (4,305 sq ft) data halls that hosts both the telco's network infrastructure and hosting services for customers.
15.24 miles T-Mobile Warszawa-Piasecznie
15.42 miles FR Investment: Kajetany
Proposed by FR Investment Poland Sp. z o.o. (a subsidiary of the Futureal Group), the Kajetany data center is a planned facility located on a 2-hectare plot at Orlej street.

Vantage: WAW13 Data Center Photos See all

Operating Company

Operated by:

Vantage is a wholesale datacenter provider operating in the Silicon Valley and Quincy, Washington markets.

Vantage was acquired by Digital Bridge Holdings LLC from Silver Lake Partners in January 2017.

176
Facilities
36
Markets

News See all

Read Vantage and Altarea Plan 400MW Data Center Development in Bordeaux, France
Vantage and Altarea Plan 400MW Data Center Development in Bordeaux, France

Vantage and Altarea Plan 400MW Data Center Development in Bordeaux, France

February 25, 2026 Vantage Data Centers

The campus, to be built on land owned by Altarea, is expected to rank among the largest data center developments in France, according to the companies. Altarea has already secured a 400MW grid connection for the site. However, the exact location and construction timeline have not been disclosed....

Read more
Read Vantage Refused Approval For Data Center Project Outside Frankfurt.
Vantage Refused Approval For Data Center Project Outside Frankfurt.

Vantage Refused Approval For Data Center Project Outside Frankfurt.

February 08, 2026 Vantage Data Centers

US data center firm Vantage has been denied the chance to develop a new campus outside Frankfurt, Germany. The Groß-Gerau city council this month voted against entering into contract negotiations with the company Vantage Data Centers regarding the establishment of a data center.SPD parliamentary...

Read more
Read Vantage Taps Liberty Energy to Deliver up to 1GW of Onsite Power
Vantage Taps Liberty Energy to Deliver up to 1GW of Onsite Power

Vantage Taps Liberty Energy to Deliver up to 1GW of Onsite Power

January 05, 2026 Vantage Data Centers

US data center developer Vantage Data Centers has signed a strategic partnership with US natural gas and oil services company Liberty Energy to deliver utility-scale power solutions for its North American data center portfolio. Under the terms of the agreement, Liberty Power Innovations (LPI), a...

Read more
Read Vantage Launches Final Building at Cyberjaya Data Center Campus
Vantage Launches Final Building at Cyberjaya Data Center Campus

Vantage Launches Final Building at Cyberjaya Data Center Campus

December 01, 2025 Vantage Data Centers

Vantage Data Centers this week announced that its fourth facility (KUL14) on the company’s first Cyberjaya campus in Malaysia is now operational. The 16MW data center is fully leased to a single unnamed customer.“We are thrilled to welcome our customer to KUL14 and support their expanding...

Read more
Read Vantage Finalizes $1.6bn Investment into APAC Platform
Vantage Finalizes $1.6bn Investment into APAC Platform

Vantage Finalizes $1.6bn Investment into APAC Platform

November 22, 2025 Vantage Data Centers

Vantage Data Centers has finalized a $1.6bn investment into its APAC platform using to acquire Yondr’s JHB1 campus in the southern peninsular Malaysian state of Johor. The facility sits on a 73-acre land parcel, and Vantage intends to expand the data center to deliver more than 300MW of capacity...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?