Quebec Province Data Centers & Colo

Login to Add Favorite Login to

The Quebec Province Data Center Map Has 28 Sites

Search Quebec Province's Data Centers


Quebec Province Data Center List

Cogenco Peer 1 Kirkland
17500 Trans Canada Hwy. S. Service Rd
Kirkland, QC, Canada, H9J2X8
Located in Montreal
  • 100,000 Gross SqFt
  • 16.5 Megawatts

Cogeco Peer 1 Montreal Data Center offers customers the combination of cloud, connectivity and colocation facilities with complementary managed services. Built to Tier 3 standards, the 100,000 square foot, secure facility is designed to Uptime Institute Standards and equipped with primary and secondary power redundancy.

Colo-D1
2525 Rue Canadien
Drummondville, QC J2C 7W2, Canada
Located in Montreal
  • 120,000 Gross SqFt
  • 20.0 Megawatts

Colo-D is powered from hydroelectricity power source

Colo-D2
530 Rue Bériault
Longueuil, QC J4G 1S8, Canada
Located in Montreal
  • 105,000 Gross SqFt
  • 35.0 Megawatts

COLO-D2, located in Longueuil, offers a floor space of more than 180,000 sqft with a capacity of over 35 megawatts. Located less than 10 km from downtown Montreal

Colo-D3
St-Bruno-de-Montarville
QC, Canada
Located in Montreal

Canadian colocation firm Colo-D plans to build a 150MW, 500,000 square foot (46,500 sq m) data center campus in Saint-Bruno-de-Montarville, 15km away from downtown Montreal.

Cologix MTL1
625 Rene-Levesque West
Montreal, QC H3B 1R2
Located in Montreal
  • 8,000 Gross SqFt
  • 1.0 Megawatts

The site was previously owned by Canix


Top Data Center Providers in Quebec Province

Sites Sites Gross SqFt Gross SqFt Power (MW) Power (MW)
Colo-D 3 225,000 55.00
ROOT Data Center 2 201,000 25.00
Aptum Technologies 1 100,000 16.50
Cologix 7 85,000 13.00
Vantage Data Centers 2 78,055 11.00
{{ provider.company_name }} {{ provider.sites_count_for_region }} {{ provider.sqft_for_region }} {{ provider.power_mw_for_region }}

Largest Data Centers in Quebec Province

Gross SqFt Gross SqFt Power (MW) Power (MW)
ROOT Montreal MTL-R2 175,000 20.00
Colo-D1 120,000 20.00
Colo-D2 105,000 35.00
Cogenco Peer 1 Kirkland 100,000 16.50
Vantage Montréal 43,055 3.00
{{ datacenter.site_name }} {{ datacenter.total_gross_sqft }} {{ datacenter.total_power_mw }}

Top Quebec Province Datacenter Markets by # of Sites

Loading...

Top Quebec Province Datacenter Markets by Power Capacity (MW)

Loading...

It's hard to get a good shot of the building with so many trees.
The Montreal Gazette's printing plant on St-Jacques St. when it was brand new in 2002. It was sold in 2017 to a data company.
Satellite View of Internap's Montreal Site
Posted in Internap Montreal
It's hard to get a good shot of the building with so many trees.
Site is Surrounded by Trees
Posted in Internap Montreal

It's hard to get a good shot of the building with so many trees.

Front Entrance to 19701
Posted in ROOT Montreal MTL-R2 Source: ROOT
The Gazette Printing Plant Before Acquisition
Posted in eStruxture Montréal MTL2
The Montreal Gazette's printing plant on St-Jacques St. when it was brand new in 2002. It was sold in 2017 to a data company.
Montreal Gazette Building
Posted in eStruxture Montréal MTL2

The Montreal Gazette's printing plant on St-Jacques St. when it was brand new in 2002. It was sold in 2017 to a data company.

Source: Phil Carpenter - Montreal Gazette
Entrance of MLT2
Posted in eStruxture Montréal MTL2 Source: eStruxture
Construction of the Ericson Facility Almost Complete in 2016
Posted in Ericson Vaudreuil
Satellite View
Posted in Ericson Vaudreuil Source: Google Maps