Vantage: BER21

Latest Podcast Dahmestraße 1
Operational
Fully operational facility
Operated by:

Vantage: BER21

Short Code: BER21
Year Built: 2022
Floors: 2
Lot Size: 12 acres

Sites on this Campus:

░░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░░ Request Dataset MW
Operational Power

Located only 20 kilometers from BER1 campus and 10 kilometers from the Brandenburg International Airport, the campus is situated on 12 acres (five hectares) and features two data centers. Each two-story facility offers 16MW of critical IT load with 300W/SF (3.2kW/M²) average density and 130,000 square feet (12,000 square meters) of space.

Vantage’s BER2 campus provides N+1 redundancy across all systems. An on-campus substation and state-of-the-art electrical equipment are the foundation of maximum efficiency and reliability, ensuring customer uptime and reliability thanks to the support from our world-class in-house operations team.

  • N+1 substation at 45MW on campus
  • Power provided by the E.DIS, the region’s leading energy provider
  • Multiple, diverse power feeds supporting the campus
  • 400V electrical configuration
  • All systems 100% concurrently maintainable

Map and Nearby Locations

Dahmestraße 1
Vantage Data Centers Sites
Nearby Facilities

Vantage: BER21 Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Vantage: BER21

Distance Site About
0.05 miles Vantage: BER22
Located only 20 kilometers from BER1 campus and 10 kilometers from the Brandenburg International Airport, the campus is situated on 12 acres (five hectares) and features two data centers.
0.84 miles Station GammaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
1.56 miles Yondr Berlin
12.26 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
12.36 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
12.37 miles Vantage: BER13
This facility is part of Vantage's Berlin 1 campus in Germany.
12.40 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
12.41 miles Vantage: BER12
Vantage has opened a second data center on its 25-acre Berlin I campus. The two-story facility spans across 130,000 sq ft (12,000 sqm) of space.
12.44 miles Vantage Berlin BER11
Berlin I data center campus, located in Brandenburg Park, sits on 25 acres (10 hectares) off Bundesstrasse 101.
12.54 miles Vantage: BER14
This facility is part of Vantage's Berlin 1 campus in Germany.
13.04 miles Hyperscale Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.39 miles I/P/B Kitzingstraße
14.39 miles Level3 Berlin Kitzingstraße
14.43 miles NorthC: Berlin 2
NorthC Berlin 2 is a strategically positioned data center that serves as a vital connectivity hub in the German capital.
14.69 miles NTT: Berlin 2B
Berlin 2B is the eastern of the two first-phase NTT buildings at the Marienpark campus in Mariendorf, a three-storey data center completed in 2022 alongside Berlin 2A.
14.71 miles NTT: Berlin 2A
Berlin 2A is the western of the two first-phase NTT buildings at the Marienpark campus in Mariendorf, a three-storey data center completed in 2022 alongside Berlin 2B.
14.75 miles NTT: Berlin 2C
Berlin 2C is one of two planned buildings on the vacant northern half of NTT's Berlin 2 campus in Marienpark, Mariendorf.
14.80 miles NTT: Berlin 2D
Berlin 2D is one of two planned buildings on the vacant northern half of NTT's Berlin 2 campus in Marienpark, Mariendorf.
14.86 miles Virtus: Berlin 4
This data center is a part of Virtus' Marienpark Campus in Berlin, Germany.
14.87 miles Virtus: Berlin 3
This data center is a part of Virtus' Marienpark Campus in Berlin, Germany.
14.89 miles Virtus: Berlin 2
This data center is a part of Virtus' Marienpark Campus in Berlin, Germany.
14.90 miles VIRTUS: Berlin 1
The new data center, named Virtus Berlin 1, will be located in Marienpark Berlin in the south of the city and is scheduled to become operational in 2026.
15.08 miles SDC: Berlin 01
SDC Capital Partners is planning to build a data center on a 23 acre site in Trebbin, Germany.
15.58 miles Vodafone D2 Berlin
16.38 miles Speedbone Berlin
16.38 miles euNetworks Berlin
17.37 miles Penta Infra: BER01
17.37 miles Penta Infra: BER02
Penta Infra's second data center building is located in Florastraße area of Berlin, Germany.
18.58 miles ITENOS Berlin
18.58 miles I/P/B Lützowstraße
18.61 miles maincubes: BER01
18.64 miles Bluestar Data Centre
Dutch realtor Van Caem and developer Prea Group have unveiled plans for a massive data center campus in Berlin's Lichtenberg district.
18.98 miles nLighten: Berlin
19.08 miles Edged Energy: Berlin
Edged Energy plans to build a data center in Berlin, Germany.
19.08 miles NorthC: Berlin
In Berlin, NorthC is developing a new facility through a redevelopment project, with an expected opening in 2026.
19.51 miles Data Castle: Berlin 1
Data Castle, a joint venture between US-based Angelo Gordon and Munich's DCD Data Center Developers GmbH, has acquired a new data center project in Berlin Spandau.

Operating Company

Operated by:

Vantage is a wholesale datacenter provider operating in the Silicon Valley and Quincy, Washington markets.

Vantage was acquired by Digital Bridge Holdings LLC from Silver Lake Partners in January 2017.

0
Facilities
0
Markets

News See all

Read Vantage Secures 1GW Of Heron Solid-State Transformers For AI Campuses
[Vantage](https://baxtel.com/data-centers/vantage-data-centers) has reserved more than 1GW of manufacturing capacity for Heron Link, the solid-state transformer made by Heron Power Electronics, to ...

Vantage Secures 1GW Of Heron Solid-State Transformers For AI Campuses

October 22, 2026 Vantage Data Centers

Vantage has reserved more than 1GW of manufacturing capacity for Heron Link, the solid-state transformer made by Heron Power Electronics, to deploy across its hyperscale data center campuses. The agreement, announced Oct. 21, delivers medium-voltage grid power straight to 800 volts DC, cutting...

Read more
Read Vantage Data Centers Raises $2B For North American Development Portfolio
Vantage Data Centers has secured $2 billion in financing to support early-stage development across its North American portfolio. The five-year revolving credit facility initially covers three devel...

Vantage Data Centers Raises $2B For North American Development Portfolio

September 15, 2026 Vantage Data Centers

Vantage Data Centers has secured $2 billion in financing to support early-stage development across its North American portfolio. The five-year revolving credit facility initially covers three development assets, with more eligible to be added. Vantage said the funding will accelerate project...

Read more
Read We Energies Begins Three Renewable Projects to Help Power Vantage Data Center
Wisconsin utility We Energies has begun construction on three renewable energy and battery storage projects, with about half of their combined capacity earmarked for a major AI data center campus i...

We Energies Begins Three Renewable Projects to Help Power Vantage Data Center

August 08, 2026 Vantage Data Centers

Wisconsin utility We Energies has begun construction on three renewable energy and battery storage projects, with about half of their combined capacity earmarked for a major AI data center campus in Port Washington. The projects include a 150MW solar farm with 50MWh of battery storage, a 110MW...

Read more
Read Virtus Starts on 204MW Data Center Campus Near Berlin
Virtus Starts on 204MW Data Center Campus Near Berlin

Virtus Starts on 204MW Data Center Campus Near Berlin

April 15, 2026 Berlin

European data center operator Virtus has begun construction of a 204MW facility outside Berlin, Germany. Located around 12km (7.4 miles) west of the capital in the municipality of Wustermark, the company plans to invest a total of €3 billion ($3.5 billion) in the project.“This ambitious...

Read more
Read Vantage and Altarea Plan 400MW Data Center Development in Bordeaux, France
Vantage and Altarea Plan 400MW Data Center Development in Bordeaux, France

Vantage and Altarea Plan 400MW Data Center Development in Bordeaux, France

February 25, 2026 Vantage Data Centers

The campus, to be built on land owned by Altarea, is expected to rank among the largest data center developments in France, according to the companies. Altarea has already secured a 400MW grid connection for the site. However, the exact location and construction timeline have not been disclosed....

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?