Vantage: CA15

Latest Podcast 2880 Northwestern Parkway
Operational
Fully operational facility
Operated by:

Vantage: CA15

Short Code: CA15
Year Built: 2018
PUE: 1.2
Utility Provider: Silicon Valley Power
Floors: 4
░░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░░ Request Dataset MW
Operational Power

CA15 data center building is a part of Vantage's Santa Clara CA1 Campus in Silicon Valley.

Map and Nearby Locations

2880 Northwestern Parkway
Vantage Data Centers Sites
Nearby Facilities

Vantage: CA15 Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Vantage: CA15

Distance Site
0.05 miles Vantage: CA13
0.05 miles Digital Realty: SJC34
0.07 miles Vantage: CA11
0.07 miles Vantage: CA16
0.09 miles Vantage: CA12
0.10 miles Vantage: CA14
0.15 miles CoreSite SV3
0.17 miles CoreSite SV5
0.19 miles Vantage: Santa Clara CA3
0.21 miles CoreSite SV7
0.21 miles Csquare: SFO1-A
0.22 miles CoreSite SV9
0.23 miles Bowers Data Center
0.23 miles CoreSite SV6
0.23 miles Csquare: SFO1-B
0.24 miles CoreSite SV4
0.30 miles CoreSite SV8
0.66 miles Prime: 2225 Martin
0.69 miles Prime Santa Clara (Martin)
0.74 miles Csquare: Sunnyvale SFO3
0.79 miles Cologix Santa Clara
0.81 miles Digital Realty: SJC29
0.82 miles H5: Silicon Valley
0.84 miles EdgeCore: Silicon Valley SV01
0.85 miles Lumen Sunnyvale 1
0.87 miles EdgeCore: SV02
0.87 miles Digital Realty: SJC30
0.89 miles Equinix Santa Clara SV14
0.89 miles Equinix Santa Clara SV15
0.89 miles Digital Realty: SJC35
0.90 miles NTT Silicon Valley SV1
0.90 miles Equinix Santa Clara SV16
0.91 miles Equinix Santa Clara SV17
0.92 miles Digital Realty: SJC16
0.92 miles Evocative Santa Clara SJC14
0.92 miles Csquare: SFO4-B
0.96 miles Csquare: SFO4-A
0.97 miles Digital Realty: SJC14
0.97 miles EdgeConneX Santa Clara
0.98 miles Prime: 1231 Comstock
0.99 miles OpenColo
1.02 miles Plaza ProInterested in this information?Contact us
1.03 miles Digital Realty: SJC15
1.04 miles Equinix Santa Clara SV2
1.06 miles EdgeConneX: 1600 Memorex
1.07 miles Evocative: Santa Clara, SJC3
1.07 miles Astound: Santa Clara
1.08 miles Prime Santa Clara
1.08 miles Digital Realty: Silicon Valley SJC10
1.08 miles Tata San Francisco
1.10 miles Colovore: SJC01
1.11 miles Colovore: SJC02
1.11 miles Intel Santa Clara D2P3
1.17 miles Lumen Santa Clara
1.21 miles Point UltraInterested in this information?Contact us
1.24 miles Global PointInterested in this information?Contact us
1.27 miles Evocative Santa Clara SJC11
1.28 miles STACK SVY02A
1.29 miles Digital Realty: SJC31
1.33 miles Digital Realty: SJC11
1.33 miles StratCap: 3205 Bassett
1.40 miles China Telecom Santa Clara
1.41 miles Connect Data Centers: Santa Clara, CA
1.41 miles Digital Realty: SJC37
1.48 miles QTS Santa Clara
1.50 miles Vantage: CA21
1.54 miles Vantage: CA22
1.57 miles 2045 & 2055 Lafayette - Digital Realty
1.58 miles Vantage: CA23
1.62 miles ECL: CSC-1
1.68 miles Tishman Speyer: Santa Clara
1.76 miles Csquare: SFO2-B
1.76 miles Santa Clara (SC1) Digital Realty
1.82 miles Csquare: SFO2-A
1.91 miles CloudHQ: Santa Clara SJC1
2.13 miles Goodman Innovation Bldg1
2.21 miles TowerInterested in this information?Contact us
2.21 miles Goodman Innovation Bldg2
2.39 miles DataBank Santa Clara SFO1
2.86 miles NaviSite Santa Clara
2.87 miles 2950 Zanker
2.94 miles Equinix Sunnyvale SV6
3.44 miles Menlo: 300 Holger Way
3.53 miles 400 Holger Way, San Jose
3.57 miles Terra Ventures: San Jose, CA
3.67 miles Equinix Sunnyvale SV4
3.69 miles Vantage: Nortech Parkway
3.74 miles Prologis: San Jose 4
3.79 miles Prologis: San Jose 3
3.81 miles Menlo: MD-SV1 (Sunnyvale)
3.82 miles CoreSite Milpitas SV2
3.85 miles Prologis: San Jose 2
3.90 miles Prologis: San Jose 1
4.17 miles 365 San Jose
4.18 miles Evocative: SJC7
4.31 miles North RidgeInterested in this information?Contact us
4.37 miles ECL: MV1
4.48 miles Ridge PlusInterested in this information?Contact us
4.61 miles Cerulean San Jose
4.62 miles Fibernet San Jose
4.63 miles Equinix San Jose SV13
4.68 miles Stack: SVY01C
4.69 miles Arena Investors: Bassett AI R&D
4.72 miles Stack: SVY01D
4.73 miles Equinix San Jose SV3
4.80 miles Stack: SVY01A
4.84 miles Stack: SVY01B
5.05 miles Overton Moore Properties: 2334 Lundy Place
5.20 miles Hurricane San Jose
5.20 miles CoreSite SV1 55 S Market
5.20 miles HostPapa SJ1
5.35 miles 150 S 1st
5.42 miles Rackspace San Jose SJC2
6.70 miles Astound: Mountain View
7.40 miles Hurricane Electric Fremont 2
7.59 miles Verizon: Fremont
8.40 miles Hurricane Electric Fremont 1
9.59 miles ThreeInterested in this information?Contact us
9.60 miles T5@Silicon Valley Bldg 1
9.66 miles T5@Silicon Valley Bldg 2
11.43 miles AT&T Palo Alto
11.49 miles Equinix Palo Alto SV8
11.49 miles Menlo: Bryant Street Landlord
12.88 miles Prologis: Silver Creek Valley
13.72 miles Equinix SV11
13.76 miles Equinix SV10
13.78 miles Lightedge: San Jose, CA
13.81 miles Equinix: SV1
13.87 miles Equinix SV5
14.11 miles China Mobile San Jose
14.12 miles Prime: San Jose
14.12 miles Equinix: SV19
14.14 miles RICloud: 6580 Via del Oro
14.15 miles Equinix: SV18
14.26 miles Equinix: SV12x
14.36 miles Blackstart Digital: San Jose Almaden
14.75 miles Centersquare: Redwood City SFO9
18.55 miles Sierra Morena Tower
19.11 miles Prime Hayward

Operating Company

Operated by:

Vantage Data Centers develops, owns and operates large data center campuses for hyperscalers, cloud providers and large enterprises across North America, EMEA and Asia Pacific. DigitalBridge and its investors have owned the company since 2017, and it is based in Denver, Colorado. Its EMEA business runs campuses in markets including Berlin, Frankfurt, Johannesburg, Milan, Warsaw, Zurich and Wales.

Vantage Data Centers History:

  • In January 2017, Digital Bridge Holdings acquired Vantage from Silver Lake Partners.
  • Founded in 2010 in Santa Clara, California.
0
Facilities
0
Markets

News See all

Read Vantage Drops 500MW Trident Data Center After Aurora Moratorium
Vantage Data Centers has dropped its Trident data center in Aurora, Colorado, after the city council approved a moratorium on new data center applications. Council members voted unanimously on Nov....

Vantage Drops 500MW Trident Data Center After Aurora Moratorium

November 25, 2026 Vantage Data Centers

Vantage Data Centers has dropped its Trident data center in Aurora, Colorado, after the city council approved a moratorium on new data center applications. Council members voted unanimously on Nov. 23 for Resolution R2026-146, which pauses new data center applications west and south of Interstate...

Read more
Read ZutaCore Unveils Two-Phase Matrix Flow Boiling for AI Cold Plates
ZutaCore unveiled Two-Phase Matrix Flow Boiling, the cooling architecture inside its OmniTherm cold plate family, at OCP Global Summit 2026 on Oct. 13. The Foster City, California, company builds w...

ZutaCore Unveils Two-Phase Matrix Flow Boiling for AI Cold Plates

October 26, 2026 San Francisco Bay Area

ZutaCore unveiled Two-Phase Matrix Flow Boiling, the cooling architecture inside its OmniTherm cold plate family, at OCP Global Summit 2026 on Oct. 13. The Foster City, California, company builds waterless, direct-to-chip two-phase liquid cooling for AI and high-performance computing servers. The...

Read more
Read O-Green Replaces Vantage In 570MW Zaragoza Data Center Campus Plan
O-Green, an investment fund linked to the Sultanate of Oman, will finance a 570MW data center campus at San Mateo de Gállego in Zaragoza. The project replaces a [Vantage Data Centers](https://baxte...

O-Green Replaces Vantage In 570MW Zaragoza Data Center Campus Plan

October 23, 2026 Aragon

O-Green, an investment fund linked to the Sultanate of Oman, will finance a 570MW data center campus at San Mateo de Gállego in Zaragoza. The project replaces a Vantage Data Centers campus announced for the same area in September 2025. elEconomista reports the total investment reaches €7.446...

Read more
Read Vantage Secures 1GW Of Heron Solid-State Transformers For AI Campuses
[Vantage](https://baxtel.com/data-centers/vantage-data-centers) has reserved more than 1GW of manufacturing capacity for Heron Link, the solid-state transformer made by Heron Power Electronics, to ...

Vantage Secures 1GW Of Heron Solid-State Transformers For AI Campuses

October 22, 2026 Vantage Data Centers

Vantage has reserved more than 1GW of manufacturing capacity for Heron Link, the solid-state transformer made by Heron Power Electronics, to deploy across its hyperscale data center campuses. The agreement, announced Oct. 21, delivers medium-voltage grid power straight to 800 volts DC, cutting...

Read more
Read NetworkOcean Runs Solar-Powered GPU Data Center on San Francisco Bay
San Francisco startup NetworkOcean says it has become the first company to run customer AI workloads from a solar-powered floating data center. The company operated a single Nvidia H100 GPU powered...

NetworkOcean Runs Solar-Powered GPU Data Center on San Francisco Bay

October 03, 2026 San Francisco Bay Area

San Francisco startup NetworkOcean says it has become the first company to run customer AI workloads from a solar-powered floating data center. The company operated a single Nvidia H100 GPU powered by a 20kW solar array during a trial in San Francisco Bay. The customer was not disclosed....

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Quotes
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.