Vantage: Taipei TPE11

Operational
Fully operational facility
Operated by:

Vantage: Taipei TPE11

Short Code: TPE11
Year Built: 2024
Lot Size: 2 acres

Sites on this Campus:

Sites leasing space from Vantage Data Centers:

  • Hyperscale Data CenterInterested in this information?Contact us
░░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░░ Request Dataset MW
Operational Power

A 35-minute drive from the Taiwan Taoyuan International Airport, the TPE11 data center is located in the industrial hub of Taiwan. The carrier-neutral five-story facility includes 215,000 square feet of space (20,000 square meters).

Map and Nearby Locations

333 ( Taoyuan City, 寶石街109號 )
Vantage Data Centers Sites
Nearby Facilities

Vantage: Taipei TPE11 Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Vantage: Taipei TPE11

Distance Site About
0.02 miles Hyperscale Data CenterInterested in this information?Contact us
0.05 miles Hyperscale Data CenterInterested in this information?Contact us
0.05 miles Vantage: TPE12
2.77 miles Ridge TwoInterested in this information?Contact us
4.05 miles CHT: New Taipei Xinzhuang IDC
4.95 miles CHT: Taoyuan Fuguo IDC
4.97 miles Lunping Internet Data Center
The data center, situated in Taoyuan City, spans one basement level and five above-ground floors. Its total floor area is approximately 20,750 square meters (223,355 square feet).
5.87 miles CHT: Taipei IDC
6.15 miles Taiwan Stock Exchange Data Center
This data center, built in partnership with Chunghwa Telecom, spans 28,647 sq m.
6.91 miles BetaInterested in this information?Contact us
8.14 miles CHT: Zhongli Renmei IDC
9.23 miles CHT: New Taipei Sanchong IDC
10.29 miles CHT: Taipei Xinyi IDC
10.30 miles CHT: Taipei Aiguo IDC
13.18 miles CHT: New Taipei Tamsui IDC
13.32 miles CHT: Taipei East 7 IDC
14.06 miles Chief LY2
LY2 is Chief Telecom's AI-focused colocation facility in Neihu District, Taipei, spanning seven above-ground floors and two basement levels. Operational since 2024, the seismically isolated facility supports both air and liquid cooling, including a 2025 retrofit for high-density liquid-cooled GPU racks.
14.30 miles Chief Telecom HD Building
14.30 miles Chief Telecom LY Building
14.33 miles Chief Telecom TF Building
14.98 miles Empyrion: Taipei
APAC data center firm Empyrion Digital plans to develop a colocation facility in Neihu, Taipei.
15.45 miles Epoch Digital: Taipei
The10-storey state-of-the-art facility is expected to be ready for Service in Q2 2026.

Operating Company

Operated by:

Vantage is a wholesale datacenter provider operating in the Silicon Valley and Quincy, Washington markets.

Vantage was acquired by Digital Bridge Holdings LLC from Silver Lake Partners in January 2017.

0
Facilities
0
Markets

News See all

Read O-Green Replaces Vantage In 570MW Zaragoza Data Center Campus Plan
O-Green, an investment fund linked to the Sultanate of Oman, will finance a 570MW data center campus at San Mateo de Gállego in Zaragoza. The project replaces a [Vantage Data Centers](https://baxte...

O-Green Replaces Vantage In 570MW Zaragoza Data Center Campus Plan

October 23, 2026 Aragon

O-Green, an investment fund linked to the Sultanate of Oman, will finance a 570MW data center campus at San Mateo de Gállego in Zaragoza. The project replaces a Vantage Data Centers campus announced for the same area in September 2025. elEconomista reports the total investment reaches €7.446...

Read more
Read Vantage Secures 1GW Of Heron Solid-State Transformers For AI Campuses
[Vantage](https://baxtel.com/data-centers/vantage-data-centers) has reserved more than 1GW of manufacturing capacity for Heron Link, the solid-state transformer made by Heron Power Electronics, to ...

Vantage Secures 1GW Of Heron Solid-State Transformers For AI Campuses

October 22, 2026 Vantage Data Centers

Vantage has reserved more than 1GW of manufacturing capacity for Heron Link, the solid-state transformer made by Heron Power Electronics, to deploy across its hyperscale data center campuses. The agreement, announced Oct. 21, delivers medium-voltage grid power straight to 800 volts DC, cutting...

Read more
Read Vantage Data Centers Raises $2B For North American Development Portfolio
Vantage Data Centers has secured $2 billion in financing to support early-stage development across its North American portfolio. The five-year revolving credit facility initially covers three devel...

Vantage Data Centers Raises $2B For North American Development Portfolio

September 15, 2026 Vantage Data Centers

Vantage Data Centers has secured $2 billion in financing to support early-stage development across its North American portfolio. The five-year revolving credit facility initially covers three development assets, with more eligible to be added. Vantage said the funding will accelerate project...

Read more
Read We Energies Begins Three Renewable Projects to Help Power Vantage Data Center
Wisconsin utility We Energies has begun construction on three renewable energy and battery storage projects, with about half of their combined capacity earmarked for a major AI data center campus i...

We Energies Begins Three Renewable Projects to Help Power Vantage Data Center

August 08, 2026 Vantage Data Centers

Wisconsin utility We Energies has begun construction on three renewable energy and battery storage projects, with about half of their combined capacity earmarked for a major AI data center campus in Port Washington. The projects include a 150MW solar farm with 50MWh of battery storage, a 110MW...

Read more
Read Vantage and Altarea Plan 400MW Data Center Development in Bordeaux, France
Vantage and Altarea Plan 400MW Data Center Development in Bordeaux, France

Vantage and Altarea Plan 400MW Data Center Development in Bordeaux, France

February 25, 2026 Vantage Data Centers

The campus, to be built on land owned by Altarea, is expected to rank among the largest data center developments in France, according to the companies. Altarea has already secured a 400MW grid connection for the site. However, the exact location and construction timeline have not been disclosed....

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.