Vantage: GA11

Latest Podcast 4380 Stacks Rd
Planned
Future facility in planning stage
Operated by:

Vantage: GA11

Short Code: GA11
Year Planned: 2028
Utility Provider: Georgia Power
Lot Size: 24 acres

Vantage Data Centers is planning a data center campus outside Atlanta, Georgia. The project, known as Westlake, aims to build a 696,980 sq ft (64,750 sqm) data center on undeveloped land in the southwest quadrant of the intersection of Stacks Road and Mallory Road, just north of the CSX Railroad. The project is due for completion in Q2 2028.

Map and Nearby Locations

4380 Stacks Rd
Vantage Data Centers Sites
Nearby Facilities

Vantage: GA11 Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Vantage: GA11

Distance Site
0.06 miles Vantage: GA12
1.46 miles RSC: Stonewall Tell Data Center
2.09 miles EdgeConneX ATL12
2.10 miles Cloud CenterInterested in this information?Contact us
2.15 miles Core HubInterested in this information?Contact us
2.15 miles EdgeConneX ATL11
2.17 miles Prime CampusInterested in this information?Contact us
2.23 miles EdgeConneX ATL13
2.24 miles Park TwoInterested in this information?Contact us
2.35 miles Center MaxInterested in this information?Contact us
2.47 miles Point BetaInterested in this information?Contact us
3.06 miles TA Realty: Red Oak ATL03
3.66 miles Center GammaInterested in this information?Contact us
4.17 miles Point TwoInterested in this information?Contact us
4.68 miles Lumen College Park 1
5.97 miles American Tower: SW Atlanta
6.06 miles Fairburn Technology Center
6.35 miles Campus OneInterested in this information?Contact us
6.70 miles GlobalInterested in this information?Contact us
7.49 miles T5: ATL IV
7.51 miles Menlo Digital: Atlanta, GA
7.70 miles Vantage: GA22
7.79 miles Vantage: GA21
7.96 miles Cloud StationInterested in this information?Contact us
8.02 miles West ParkInterested in this information?Contact us
8.95 miles Vantage: Douglasville 1
8.97 miles Vantage: Douglasville 2
9.06 miles Vantage: Douglasville 3
9.52 miles DataBank: Lithia Springs ATL6
9.60 miles DataBank: Lithia Springs ATL5
9.79 miles Aligned: ATL-01
9.86 miles Crow Holdings: Fayetteville, GA
9.87 miles Flexential: Douglasville 2
9.87 miles Point OneInterested in this information?Contact us
10.02 miles Flexential: Douglasville 1
10.02 miles CoreWeave: Douglasville, GA
10.05 miles Centersquare: ATL1
10.05 miles DC BLOX: ATL1-C
10.06 miles Mapletree: 375 Riverside Parkway
10.10 miles DataBank: Atlanta ATL4
10.13 miles QTS: Fayetteville DC11
10.13 miles DC BLOX: ATL1-B
10.17 miles Central TowerInterested in this information?Contact us
10.18 miles Digital Realty: ATL11
10.21 miles CenterInterested in this information?Contact us
10.21 miles QTS: Fayetteville DC13
10.21 miles DC BLOX: ATL1-A
10.21 miles DataCanopy: Lithia Springs (Atlanta)
10.22 miles PwC Lithia Springs
10.24 miles TwoInterested in this information?Contact us
10.25 miles Valley PrimeInterested in this information?Contact us
10.27 miles QTS: Fayetteville DC12
10.29 miles SouthInterested in this information?Contact us
10.41 miles QTS: Fayetteville DC14
10.48 miles Valley OneInterested in this information?Contact us
10.54 miles Saragon: Atlanta (1190 Allene)
10.65 miles QTS: Fayetteville DC2
10.66 miles EdgeConneX ATL01
10.66 miles Lumen Atlanta 5
10.66 miles Verizon: Atlanta (999 Lee St SW)
10.67 miles West ParkInterested in this information?Contact us
10.68 miles Lambda: Atlanta (EdgeConneX ATL02)
10.68 miles EdgeConneX ATL02
10.68 miles StationInterested in this information?Contact us
10.69 miles Strategic Real: Palmetto 1
10.71 miles Strategic Real: Palmetto Expansion
10.73 miles DataBank Atlanta ATL2
10.73 miles DataBank Atlanta ATL3
10.84 miles QTS: Fayetteville DC1
10.84 miles T5: Project Pegasus (Coweta)
10.86 miles Switch: Atlanta 1
10.93 miles Rock House Road data center, Atlanta
11.06 miles Switch: Atlanta 2
11.17 miles Digital Realty: ATL 15
11.29 miles Switch: Atlanta 3
11.39 miles Digital Realty: West End (713 RDA Blvd)
11.47 miles Switch: Atlanta 4
11.50 miles GammaInterested in this information?Contact us
11.51 miles T5@Atlanta III Bldg 3
11.57 miles T5@Atlanta III Bldg 5
11.58 miles STACK: ATL02D
11.60 miles T5@Atlanta III Bldg 4
11.61 miles Global PointInterested in this information?Contact us
11.63 miles Valley PrimeInterested in this information?Contact us
11.63 miles Digital Realty: ATL16 (Fort Gillem)
11.64 miles STACK: ATL02B
11.64 miles T5@Atlanta III Bldg 2
11.65 miles CenterInterested in this information?Contact us
11.70 miles Ridge OneInterested in this information?Contact us
11.71 miles STACK: ATL02C
11.71 miles STACK: ATL02A
11.74 miles T5@Atlanta III Bldg 1
11.76 miles South CampusInterested in this information?Contact us
12.84 miles Shadowbox Studios: International Park (DeKalb)
13.05 miles Digital Realty: 10 Forsyth St NW
13.08 miles FOGO Atlanta
13.08 miles Equinix Atlanta AT2 AT3
13.08 miles 56 Marietta Carrier Hotel - Digital Realty
13.09 miles HostPapa GA1
13.12 miles RadiusDC: 55 Marietta
13.12 miles QuadraNet Atlanta
13.12 miles Coloblox: 55 Marietta
13.12 miles Cogent: Atlanta
13.12 miles CloudFirst: Atlanta (34 Peachtree)
13.12 miles CoreSite: AT1 Atlanta (55 Marietta)
13.13 miles ATLDC 55 Marietta
13.13 miles CloudFirst: Colo@55 (55 Marietta)
13.17 miles TA Realty: Ellenwood, ATL
13.31 miles AT&T Southern Bell Telephone Company Building
13.38 miles Lumen Atlanta 2
13.38 miles Internap Atlanta ACS003
13.39 miles Equinix Atlanta AT1
13.39 miles 180 Peachtree
13.43 miles Digital Realty: ATL14
13.44 miles Evocative ATL1
13.44 miles Hivelocity: ATL2 (250 Williams)
13.46 miles QTS: Atlanta-1 DC1
13.50 miles Southern Telecom Atlanta
13.50 miles SpaceX: Atlanta (QTS Atlanta-1)
13.51 miles QTS: Atlanta-1 DC2
13.74 miles QTS: Atlanta-1 DC4
13.77 miles QTS: Atlanta-1 DC3
13.87 miles PCC-DeKalb: Ellenwood, GA
13.89 miles Lumen Atlanta 1
13.89 miles H5 Atlanta
14.09 miles Carrier-Neutral Data CenterInterested in this information?Contact us
14.27 miles Lumen Atlanta 6
14.32 miles Aptum Atlanta
14.33 miles DataBank Atlanta ATL1
14.61 miles Real Estate Data CenterInterested in this information?Contact us
14.70 miles Edged Energy: ATL01-03
14.85 miles Edged Energy: ATL01-02
14.98 miles Edged Energy: ATL01-01
15.55 miles Verizon: 4000 Highland
15.60 miles Stillwater Technology Park Hampton
16.33 miles 365 Smyrna, GA
16.96 miles Point UltraInterested in this information?Contact us
18.31 miles Carrier-Neutral Data CenterInterested in this information?Contact us
18.34 miles Carrier-Neutral Data CenterInterested in this information?Contact us
18.51 miles Carrier-Neutral Data CenterInterested in this information?Contact us
18.54 miles Carrier-Neutral Data CenterInterested in this information?Contact us
18.60 miles Carrier-Neutral Data CenterInterested in this information?Contact us
18.65 miles Carrier-Neutral Data CenterInterested in this information?Contact us
18.65 miles Hampton Technology Park
18.72 miles Douglas Waldrop Bldg-1
18.76 miles Carrier-Neutral Data CenterInterested in this information?Contact us
18.83 miles Douglas Waldrop Bldg-2
19.83 miles Coloblox: ATL2

Vantage: GA11 Data Center Photos See all

Proposed Site for Vantage's Stacks Road Project
Source: Google Maps
Map produced by TAG, the Technology Association of Georgia.
Map of Georgia's Data Centers
Source: Baxtel

Map produced by TAG, the Technology Association of Georgia.

Operating Company

Operated by:

Vantage Data Centers develops, owns and operates large data center campuses for hyperscalers, cloud providers and large enterprises across North America, EMEA and Asia Pacific. DigitalBridge and its investors have owned the company since 2017, and it is based in Denver, Colorado. Its EMEA business runs campuses in markets including Berlin, Frankfurt, Johannesburg, Milan, Warsaw, Zurich and Wales.

Vantage Data Centers History:

  • In January 2017, Digital Bridge Holdings acquired Vantage from Silver Lake Partners.
  • Founded in 2010 in Santa Clara, California.
0
Facilities
0
Markets

News See all

Read Vantage Drops 500MW Trident Data Center After Aurora Moratorium
Vantage Data Centers has dropped its Trident data center in Aurora, Colorado, after the city council approved a moratorium on new data center applications. Council members voted unanimously on Nov....

Vantage Drops 500MW Trident Data Center After Aurora Moratorium

November 25, 2026 Vantage Data Centers

Vantage Data Centers has dropped its Trident data center in Aurora, Colorado, after the city council approved a moratorium on new data center applications. Council members voted unanimously on Nov. 23 for Resolution R2026-146, which pauses new data center applications west and south of Interstate...

Read more
Read DC BLOX Files For Third Atlanta West Building, 80MW Due In 2029
DC BLOX filed a development of regional impact notice for a third building at its Atlanta West campus in Georgia, [Data Center Dynamics reported](https://www.datacenterdynamics.com/en/news/dc-blox-...

DC BLOX Files For Third Atlanta West Building, 80MW Due In 2029

November 19, 2026 DC BLOX

DC BLOX filed a development of regional impact notice for a third building at its Atlanta West campus in Georgia, Data Center Dynamics reported. The filing with the Georgia Department of Community Affairs covers ATL1-C, a 500,000-square-foot data center at 1800 North River Road in Douglasville....

Read more
Read Microsoft Files for 422MW Three-Building Data Center Campus in Rome, Georgia
Microsoft filed for state review on October 20 of a three-building data center campus in Rome, Georgia, with 422MW of planned capacity. The [Development of Regional Impact application](https://dca....

Microsoft Files for 422MW Three-Building Data Center Campus in Rome, Georgia

November 18, 2026 Microsoft Azure

Microsoft filed for state review on October 20 of a three-building data center campus in Rome, Georgia, with 422MW of planned capacity. The Development of Regional Impact application covers 349 acres at 0 Huffaker Road and 1,659,000 square feet of floor space. Microsoft owns the land, bought in...

Read more
Read O-Green Replaces Vantage In 570MW Zaragoza Data Center Campus Plan
O-Green, an investment fund linked to the Sultanate of Oman, will finance a 570MW data center campus at San Mateo de Gállego in Zaragoza. The project replaces a [Vantage Data Centers](https://baxte...

O-Green Replaces Vantage In 570MW Zaragoza Data Center Campus Plan

October 23, 2026 Aragon

O-Green, an investment fund linked to the Sultanate of Oman, will finance a 570MW data center campus at San Mateo de Gállego in Zaragoza. The project replaces a Vantage Data Centers campus announced for the same area in September 2025. elEconomista reports the total investment reaches €7.446...

Read more
Read Vantage Secures 1GW Of Heron Solid-State Transformers For AI Campuses
[Vantage](https://baxtel.com/data-centers/vantage-data-centers) has reserved more than 1GW of manufacturing capacity for Heron Link, the solid-state transformer made by Heron Power Electronics, to ...

Vantage Secures 1GW Of Heron Solid-State Transformers For AI Campuses

October 22, 2026 Vantage Data Centers

Vantage has reserved more than 1GW of manufacturing capacity for Heron Link, the solid-state transformer made by Heron Power Electronics, to deploy across its hyperscale data center campuses. The agreement, announced Oct. 21, delivers medium-voltage grid power straight to 800 volts DC, cutting...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Quotes
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.