Vantage: KIX12

Latest Podcast 6-chōme-16 Saitoasagi Ibaraki
Under Construction
New facility under construction
Operated by:

Vantage: KIX12

Short Code: Building 2
Year Planned: 2027
Floors: 4

This facility will be part of Vantage's Osaka (KIX1) Campus in Osaka, Japan.

Map and Nearby Locations

6-chōme-16 Saitoasagi Ibaraki
Vantage Data Centers Sites
Nearby Facilities

Vantage: KIX12 Power Growth Over Time

Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Vantage: KIX12

Distance Site About
0.04 miles Vantage Osaka (KIX1)
Located in Ibaraki, the Osaka campus comprises 485,000 square feet (45,000 square meters) and features two four-story, state-of-the-art facilities built to withstand even the worst earthquakes.
0.66 miles MC Digital Osaka Connected Campus (KIX)
1.07 miles MC Digital Osaka 1 (KIX10)
1.13 miles MC Digital Osaka 2 (KIX11)
1.36 miles MC Digital Osaka 4 (KIX13)
1.48 miles Equinix: OS2x
1.58 miles NTT: Nishiai
NTT acquired eight acres in Osaka Nishiai to develop two data centers, with the first facility expected to open in fiscal year 2027.
2.00 miles CapitalLand: Osaka 01
The new facility will include more than nine data halls along with dedicated office and working spaces to support operations.
2.64 miles NTT Osaka 7
3.78 miles Colt: Minoh, Osaka
ESR Group and Colt Data Centre Services (Colt DCS) have formed a joint venture to develop the initial phase of a hyperscale data center in Minoh City, Osaka, Japan.
3.78 miles Colt: Minoh 2
This facility is part of Colt's Minoh Campus in Osaka, Japan.
3.78 miles ESR Group: Minoh, Osaka
ESR Group and Colt Data Centre Services (Colt DCS) have formed a joint venture to develop the initial phase of a hyperscale data center in Minoh City, Osaka, Japan.
3.83 miles IIF Osaka Toyonaka
The IIF Osaka Toyonaka Data Center facility, constructed in September 1991, stands on a 4,769.70-square-meter plot of land. The building features a total floor area of 20,027.14 square meters.
6.23 miles IDC Frontier: Osaka Suita
9.60 miles Optage: Umeda North
This state-of-the-art data center began operations in 2012. The facility encompasses 11,534 square meters of gross floor area, with 4,000 square meters dedicated to colocation space containing 1,300 racks.
9.60 miles Telehouse: Osaka Umeda
KDDI Telehouse operates a colocation data center in Umeda, Osaka.
9.85 miles MC Digital Osaka 3 (KIX12)
10.38 miles AirTrunk: Osaka OSK1
Located in West Osaka, the development consists of a 16,500sqm facility dedicated to high-scale cloud requirements.
10.63 miles Optage: Sonezaki
Named 'Optage Sonezaki Data Center,' the 14-story carrier-neutral facility will offer 24,100 square feet (2,250 square meters) of space and incorporate seismic isolation design for earthquake protection.
10.75 miles EdgeConneX: Osaka Yawata
EdgeConneX expands in Japan, securing a long-term land lease for its second data center site in Greater Osaka/Yawata.
10.78 miles EdgeConneX: Yawata 3
This facility is part of EdgeConneX Yawata Campus in Osaka.
10.78 miles EdgeConneX: Yawata 2
This facility is part of EdgeConneX Yawata Campus in Osaka.
10.97 miles Digital Edge: Osaka OSA1
11.00 miles Equinix Osaka OS3
11.00 miles Telehouse: Osaka 2
Built as the major Telehouse Data Center for the west of Japan, The Osaka 2 Data Center facility began service on 21st August, 2015.
11.05 miles NTT OS2 (Telepark Dojima Building 2)
11.06 miles NTT: Osaka North 1(OSK12)
NTT Global Data Centers has officially broken ground on its Osaka North 1 (OSK12) data center in Ibaraki City, marking a significant expansion into one of Japan’s fastest-growing digital hubs.
11.08 miles Equinix: OS5x
11.08 miles Equinix: OS4x
Equinix's fourth data center in Osaka, Japan, is connected to the adjacent OS2x in Minoh City, Osaka Prefecture. The facility has 4,925 square meters (53,025 square feet) of data center space.
11.09 miles NTT Data Osaka Dojima (Building #4)
11.14 miles NTT OS3 (Telepark Dojima Building 3)
11.42 miles Goldman Sachs: Higashiosaka
Goldman Sachs acquired land to build a data centre in Daito, Higashiosaka.
11.79 miles AirTrunk: Osaka OSK2
AirTrunk’s newly announced OSK2 project is a massive hyperscale development located in East Osaka, designed specifically to meet the surging demand for cloud and artificial intelligence (AI) infrastructure in the Kansai region.
11.79 miles AirTrunk: OSK2 Expansion
11.79 miles Empyrion: Osaka JP2
11.98 miles NTT Osaka 5
12.37 miles Telehouse: Osaka Shinsaibashi
KDDI Telehouse operates a colocation data center in Shinsaibashi, Japan.
12.37 miles Optage: Shinsaibashi
The Shinsaibashi Data Center in central Osaka was launched in 2008. OPTAGE will establish a new connectivity area “Shinsaibashi POP (Point Of Presence)” within the existing Shinsaibashi Data Center in Osaka City By 2025.
12.37 miles Campus OneInterested in this information?Contact us
12.38 miles Optage: Shinmachi
12.38 miles INAP Osaka
12.40 miles Equinix Osaka OS1
Opened in 2013, the first phase, with room for 320 cabinets is a US$12m investment. Once fully opened the site will carry 800 cabinets.
12.45 miles NTT Osaka OS4
12.62 miles ADA: Osaka East 1
GLP's data center subsidiary, Ada Infrastructure, plans to build a four-story data center in East Osaka, Japan. The site will feature an N+1 UPS distributed redundant and N+1 closed loop air-cooled chiller plant.
12.96 miles Mapletree: Osaka
The multi-story facility is built on a 4,200 sqm site and offers 13,330 sqm of total space, including 12,720 sqm of lettable area. The property comes with a 70-year land lease that began October 1, 2020.
13.90 miles EdgeConneX: Kyotanabe 2
This facility is part of EdgeConneX Kyotanabe campus in Osaka.
14.00 miles EdgeConneX: Osaka Kyotanabe
EdgeConneX has broken ground on a 200MW AI-ready data center campus in Kyotanabe, Greater Osaka, Japan, spanning approximately 130,000 sqm (1.4 million sq ft). Construction began in March 2026, with the first 28MW phase expected online by early 2028, followed by phased expansion to full capacity.
14.89 miles STACK Osaka KIX01
Located in Osaka’s eastern suburb of Keihanna, this data center campus will comprise three buildings with robust access to power and network to ensure strong reliability.
14.90 miles ESR Group: Keihanna OS4
ESR Group and STACK Infrastructure, major players in APAC's New Economy real estate and global digital infrastructure, are jointly building a new data center campus in Keihanna, Japan (Kansai region).
14.93 miles STACK: KIX01C
This facility is a part of Stack's KIX01 Campus in Osaka, Japan.
14.94 miles STACK: KIX01B
This facility is a part of Stack's KIX01 Campus in Osaka, Japan.
15.07 miles Colt Osaka Keihanna
15.30 miles NTT Keihanna OSK11
15.93 miles SC Zeus: Osaka 2
This facility is part of SC Zeus' Project Zeus OSA1 campus in Osaka.
15.95 miles SC Zeus: Osaka Campus
SC Zeus, a leader in sustainable data center solutions, is developing Project ZEUS OSA 1 in Osaka, a campus that will comprise two buildings.
15.99 miles ESR Group: Cosmosquare OS1
The newly completed data center is the first hyperscale facility within ESR's Cosmosquare campus. At full build-out, the US$2 billion campus will comprise three buildings.
16.00 miles Kagoya: Keihanna Lab A
The data center's first three-story Building A was built in 2006, with a four-story Building B added in 2014. Currently, the two are connected by a walkway, providing server space for up to 650+ racks.
16.00 miles CloudHQ: Cosmosquare KIX1
Strategically positioned in Nanko Kita, Osaka City, CloudHQ's Cosmosquare is a future-proof, three-phase hyperscale data center campus (KIX1, KIX2, KIX3).
16.00 miles Kagoya: Keihanna Lab B
The facility Lab B is a four-story building located on Kagoya's Keihanna Campus in Kyoto, Japan. It covers an area of 3275.29 square meters (including corridors) and has a capacity of 400 racks.
16.01 miles ESR Group: OS2
This facility is part of ESR Group's Cosmosquare campus in Osaka.
16.01 miles CloudHQ: KIX2
This facility is part of CloudHQ's Cosmosquare campus in Osaka.
16.03 miles ESR Group: OS3
This facility is part of ESR Group's Cosmosquare campus in Osaka.
16.05 miles CloudHQ: KIX3
This facility is part of CloudHQ's Cosmosquare campus in Osaka.
18.06 miles Digital Edge: Osaka OSA2
The facility was acquired in 2021 as part of Digital Edge's US$230 million (JPY26 billion) purchase of five data center assets from Itochu Techno-Solutions (CTC).
18.10 miles Carrier-Neutral Data CenterInterested in this information?Contact us
18.58 miles Softbank: Sakai, Osaka
The planned facility will have a total floor area of 750,000 square meters, utilizing about 60% of the Sharp Sakai Plant's total land area of approximately 440,000 square meters.
18.70 miles KDDI: Sakai, Osaka
KDDI has launched an AI data center at the former Sharp Sakai factory site in Osaka Prefecture.

Vantage: KIX12 Data Center Photos See all

Operating Company

Operated by:

Vantage is a wholesale datacenter provider operating in the Silicon Valley and Quincy, Washington markets.

Vantage was acquired by Digital Bridge Holdings LLC from Silver Lake Partners in January 2017.

176
Facilities
36
Markets

News See all

Read Vantage and Altarea Plan 400MW Data Center Development in Bordeaux, France
Vantage and Altarea Plan 400MW Data Center Development in Bordeaux, France

Vantage and Altarea Plan 400MW Data Center Development in Bordeaux, France

February 25, 2026 Vantage Data Centers

The campus, to be built on land owned by Altarea, is expected to rank among the largest data center developments in France, according to the companies. Altarea has already secured a 400MW grid connection for the site. However, the exact location and construction timeline have not been disclosed....

Read more
Read Vantage Refused Approval For Data Center Project Outside Frankfurt.
Vantage Refused Approval For Data Center Project Outside Frankfurt.

Vantage Refused Approval For Data Center Project Outside Frankfurt.

February 08, 2026 Vantage Data Centers

US data center firm Vantage has been denied the chance to develop a new campus outside Frankfurt, Germany. The Groß-Gerau city council this month voted against entering into contract negotiations with the company Vantage Data Centers regarding the establishment of a data center.SPD parliamentary...

Read more
Read Vantage Taps Liberty Energy to Deliver up to 1GW of Onsite Power
Vantage Taps Liberty Energy to Deliver up to 1GW of Onsite Power

Vantage Taps Liberty Energy to Deliver up to 1GW of Onsite Power

January 05, 2026 Vantage Data Centers

US data center developer Vantage Data Centers has signed a strategic partnership with US natural gas and oil services company Liberty Energy to deliver utility-scale power solutions for its North American data center portfolio. Under the terms of the agreement, Liberty Power Innovations (LPI), a...

Read more
Read Vantage Launches Final Building at Cyberjaya Data Center Campus
Vantage Launches Final Building at Cyberjaya Data Center Campus

Vantage Launches Final Building at Cyberjaya Data Center Campus

December 01, 2025 Vantage Data Centers

Vantage Data Centers this week announced that its fourth facility (KUL14) on the company’s first Cyberjaya campus in Malaysia is now operational. The 16MW data center is fully leased to a single unnamed customer.“We are thrilled to welcome our customer to KUL14 and support their expanding...

Read more
Read Vantage Finalizes $1.6bn Investment into APAC Platform
Vantage Finalizes $1.6bn Investment into APAC Platform

Vantage Finalizes $1.6bn Investment into APAC Platform

November 22, 2025 Vantage Data Centers

Vantage Data Centers has finalized a $1.6bn investment into its APAC platform using to acquire Yondr’s JHB1 campus in the southern peninsular Malaysian state of Johor. The facility sits on a 73-acre land parcel, and Vantage intends to expand the data center to deliver more than 300MW of capacity...