Vantage: Zurich ZRH3

Latest Podcast Industriegebiet Zimikon
Planned
Future facility in planning stage
Operated by:

Vantage: Zurich ZRH3

Year Planned: 2029
Lot Size: 13 acres

Vantage plans to build its ZRH3 campus in Zurich on approximately 13 acres of land. The campus may include one or two buildings.

Map and Nearby Locations

Industriegebiet Zimikon ( Industriestrasse, 8604, Volketswil )
Vantage Data Centers Sites
Nearby Facilities

Vantage: Zurich ZRH3 Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Vantage: Zurich ZRH3

Distance Site About
6.25 miles Edge PlazaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
6.30 miles Greenfield: Zurich
UK infrastructure developer Greenfield plans a data center in Zurich, Switzerland.
6.68 miles Green Datacenter Glattbrugg
6.73 miles Digital Realty: ZUR4
Digital Realty plans to expand its campus near the Swiss capital with a fourth building.
6.73 miles Digital Realty: ZUR1
6.76 miles Digital Realty: ZUR3
6.78 miles Digital Realty: ZUR2
7.29 miles Equinix Zurich ZH2 ZH4
7.29 miles nLighten: Zurich
7.35 miles Equinix Zürich ZH1
8.10 miles NTT Zurich 1
The site was opened in June 2011, is located in Rümlang near Zurich.
8.25 miles Swisscom Zürich
9.06 miles NorthC: Winterthur (Zurich)
9.37 miles Vantage: ZRH13
ZRH13 is the third planned data center on Vantage's Zurich I campus in Winterthur.
9.41 miles Vantage: ZRH12
ZRH12 is the second data center on Vantage's Zurich I campus in Winterthur.
9.45 miles Vantage: ZRH11
ZRH11 is the first data center on Vantage's Zurich I campus in Winterthur.
9.54 miles AtlasEdge: Zurich
10.18 miles Equinix Zurich ZH5
11.26 miles Green Datacenter Zurich City (Schlieren)
12.28 miles Green Datacenter: Dielsdorf Bldg M
Data Center 1 (Building M) of Green's Campus ZRH2 in Dielsdorf: a four-storey data center with 5,600 m² of white space, ambient-air free cooling, rooftop solar and waste heat fed to Energie 360°'s Dielsdorf heating network.
12.31 miles Green Datacenter: Dielsdorf Bldg N
Data Center 2 (Building N) of Green's Campus ZRH2 in Dielsdorf: a four-storey data center with 5,800 m² of white space, built by Implenia beside Data Center 1, with waste heat recovery for the Dielsdorf heating network.
12.35 miles Green Datacenter: Dielsdorf Bldg O
Data Center 3 (Building O) of Green's Campus ZRH2 in Dielsdorf, under construction north of Data Center 2, with 5,800 m² of planned white space and waste heat recovery for the Dielsdorf heating network.
16.09 miles Vantage: Zurich II
Vantage's second data center in Switzerland is located north of Zurich's city center in Glattfelden. Set on 1 acre, the two-story facility offers a total of 226,000 square feet (21,000 sq m) of space.
16.68 miles STACK ZUR01
17.01 miles STACK: ZUR03
STACK Infrastructure plans to build another data center in Zurich.

Operating Company

Operated by:

Vantage is a wholesale datacenter provider operating in the Silicon Valley and Quincy, Washington markets.

Vantage was acquired by Digital Bridge Holdings LLC from Silver Lake Partners in January 2017.

0
Facilities
0
Markets

News See all

Read O-Green Replaces Vantage In 570MW Zaragoza Data Center Campus Plan
O-Green, an investment fund linked to the Sultanate of Oman, will finance a 570MW data center campus at San Mateo de Gállego in Zaragoza. The project replaces a [Vantage Data Centers](https://baxte...

O-Green Replaces Vantage In 570MW Zaragoza Data Center Campus Plan

October 23, 2026 Aragon

O-Green, an investment fund linked to the Sultanate of Oman, will finance a 570MW data center campus at San Mateo de Gállego in Zaragoza. The project replaces a Vantage Data Centers campus announced for the same area in September 2025. elEconomista reports the total investment reaches €7.446...

Read more
Read Vantage Secures 1GW Of Heron Solid-State Transformers For AI Campuses
[Vantage](https://baxtel.com/data-centers/vantage-data-centers) has reserved more than 1GW of manufacturing capacity for Heron Link, the solid-state transformer made by Heron Power Electronics, to ...

Vantage Secures 1GW Of Heron Solid-State Transformers For AI Campuses

October 22, 2026 Vantage Data Centers

Vantage has reserved more than 1GW of manufacturing capacity for Heron Link, the solid-state transformer made by Heron Power Electronics, to deploy across its hyperscale data center campuses. The agreement, announced Oct. 21, delivers medium-voltage grid power straight to 800 volts DC, cutting...

Read more
Read Vantage Data Centers Raises $2B For North American Development Portfolio
Vantage Data Centers has secured $2 billion in financing to support early-stage development across its North American portfolio. The five-year revolving credit facility initially covers three devel...

Vantage Data Centers Raises $2B For North American Development Portfolio

September 15, 2026 Vantage Data Centers

Vantage Data Centers has secured $2 billion in financing to support early-stage development across its North American portfolio. The five-year revolving credit facility initially covers three development assets, with more eligible to be added. Vantage said the funding will accelerate project...

Read more
Read We Energies Begins Three Renewable Projects to Help Power Vantage Data Center
Wisconsin utility We Energies has begun construction on three renewable energy and battery storage projects, with about half of their combined capacity earmarked for a major AI data center campus i...

We Energies Begins Three Renewable Projects to Help Power Vantage Data Center

August 08, 2026 Vantage Data Centers

Wisconsin utility We Energies has begun construction on three renewable energy and battery storage projects, with about half of their combined capacity earmarked for a major AI data center campus in Port Washington. The projects include a 150MW solar farm with 50MWh of battery storage, a 110MW...

Read more
Read Vantage and Altarea Plan 400MW Data Center Development in Bordeaux, France
Vantage and Altarea Plan 400MW Data Center Development in Bordeaux, France

Vantage and Altarea Plan 400MW Data Center Development in Bordeaux, France

February 25, 2026 Vantage Data Centers

The campus, to be built on land owned by Altarea, is expected to rank among the largest data center developments in France, according to the companies. Altarea has already secured a 400MW grid connection for the site. However, the exact location and construction timeline have not been disclosed....

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?