Vantage: Zurich II

Latest Podcast Spinnerei Lettenstrasse 2a
Operational
Fully operational facility
Operated by:

Vantage: Zurich II

Short Code: ZRH2
Year Built: 2024
Utility Provider: EKZ
Floors: 2
Lot Size: 3 acres
░░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░░ Request Dataset MW
Operational Power

Vantage's second data center in Switzerland is located north of Zurich's city center in Glattfelden. Set on 3 acres, the two-story facility offers a total of 226,000 square feet (21,000 sq m) of space. The company reportedly invested more than CHF 370 million ($405 million) in the project.

Vantage installed air-source (ASHP) and water-source (WSHP) heat pumps within ZRH2 that will convert waste heat for use in administrative spaces. ZRH2 will also provide waste heat to a nearby hotel and seminar center. The site will leverage rainwater infiltration and a green roof to minimize environmental impacts. It will feature a unique wood-finished facade.

ZRH2 Features


  • Multiple, diverse power feeds supporting the data center
  • 400V electrical configuration
  • N+1 redundancy across all systems
  • Major fiber-based service providers operating within a few miles of the data center
  • Two Meet-Me-Rooms (MMRs) allowing for diverse paths and multiple connectivity options
  • Two points-of-entry (POEs) ensuring maximum path diversity for inbound carriers
  • Diverse fiber pathways into the data center (minimum two paths per carrier)

Map and Nearby Locations

Spinnerei Lettenstrasse 2a
Vantage Data Centers Sites
Nearby Facilities

Vantage: Zurich II Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Vantage: Zurich II

Distance Site About
3.62 miles STACK ZUR01
6.04 miles Green Datacenter: Dielsdorf Bldg O
Data Center 3 (Building O) of Green's Campus ZRH2 in Dielsdorf, under construction north of Data Center 2, with 5,800 m² of planned white space and waste heat recovery for the Dielsdorf heating network.
6.09 miles Green Datacenter: Dielsdorf Bldg N
Data Center 2 (Building N) of Green's Campus ZRH2 in Dielsdorf: a four-storey data center with 5,800 m² of white space, built by Implenia beside Data Center 1, with waste heat recovery for the Dielsdorf heating network.
6.13 miles Green Datacenter: Dielsdorf Bldg M
Data Center 1 (Building M) of Green's Campus ZRH2 in Dielsdorf: a four-storey data center with 5,600 m² of white space, ambient-air free cooling, rooftop solar and waste heat fed to Energie 360°'s Dielsdorf heating network.
6.57 miles STACK: ZUR03
STACK Infrastructure plans to build another data center in Zurich.
8.67 miles NTT Zurich 1
The site was opened in June 2011, is located in Rümlang near Zurich.
9.85 miles STACK: ZUR02 Beringen
STACK Infrastructure topped out its ZUR02 facility in Beringen, Schaffhausen, in 2025. The facility was previously known as Safe Host SH5 Beringen before the company was acquired by STACK in May 2022.
9.99 miles Digital Realty: ZUR3
10.02 miles Digital Realty: ZUR2
10.07 miles Digital Realty: ZUR1
10.07 miles Green Datacenter Glattbrugg
10.08 miles Digital Realty: ZUR4
Digital Realty plans to expand its campus near the Swiss capital with a fourth building.
11.32 miles Equinix Zurich ZH5
11.60 miles Green Datacenter Zurich City (Schlieren)
12.11 miles AtlasEdge: Zurich
12.22 miles Swisscom Zürich
12.36 miles NorthC: Winterthur (Zurich)
12.65 miles Equinix Zurich ZH2 ZH4
12.65 miles nLighten: Zurich
12.66 miles Equinix Zürich ZH1
13.58 miles South TowerInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.85 miles Vantage: ZRH13
ZRH13 is the third planned data center on Vantage's Zurich I campus in Winterthur.
13.91 miles Vantage: ZRH12
ZRH12 is the second data center on Vantage's Zurich I campus in Winterthur.
13.93 miles Vantage: ZRH11
ZRH11 is the first data center on Vantage's Zurich I campus in Winterthur.
14.05 miles Greenfield: Zurich
UK infrastructure developer Greenfield plans a data center in Zurich, Switzerland.
15.14 miles Green Datacenter: Zurich West 4
Green's fourth Lupfig data center: a 30 m building with 5,526 m² of data center space and about 2,000 m² of offices, free cooling, rooftop solar, and waste heat fed to IBB's Naturenergie Eigenamt heating network.
15.15 miles Green Datacenter: Zurich West 1
Trakt A of Green's original Lupfig building: 3,300 m² of white space on three floors, including a 1,100 m² hall on ABB 380 V DC power distribution, once billed as the world's most powerful DC-powered data center.
15.18 miles Green Datacenter: Lupfig ZRH1 Expansion
Future data center phases on Green's Lupfig campus beyond Zurich West 4. Green's 2021 plans showed three further buildings at the site, one of which became Zurich West 4.
15.18 miles Green Datacenter: Zurich West 2
Trakt B of Green's original Lupfig building, attached to Zurich West 1: 3,548 m² of white space in 8,330 m² gross floor area, with ammonia free-cooling chillers and an ABB hybrid power supply.
15.21 miles Green Datacenter: Zurich West 3
Switzerland's first high-density colocation building: a six-storey, CHF 70 million data center on Green's Lupfig campus with 3,600 m² of white space for up to 25 kW per rack.
16.09 miles Vantage: Zurich ZRH3
Vantage plans to build its ZRH3 campus in Zurich on approximately 13 acres of land. The campus may include one or two buildings.

Operating Company

Operated by:

Vantage is a wholesale datacenter provider operating in the Silicon Valley and Quincy, Washington markets.

Vantage was acquired by Digital Bridge Holdings LLC from Silver Lake Partners in January 2017.

0
Facilities
0
Markets

News See all

Read O-Green Replaces Vantage In 570MW Zaragoza Data Center Campus Plan
O-Green, an investment fund linked to the Sultanate of Oman, will finance a 570MW data center campus at San Mateo de Gállego in Zaragoza. The project replaces a [Vantage Data Centers](https://baxte...

O-Green Replaces Vantage In 570MW Zaragoza Data Center Campus Plan

October 23, 2026 Aragon

O-Green, an investment fund linked to the Sultanate of Oman, will finance a 570MW data center campus at San Mateo de Gállego in Zaragoza. The project replaces a Vantage Data Centers campus announced for the same area in September 2025. elEconomista reports the total investment reaches €7.446...

Read more
Read Vantage Secures 1GW Of Heron Solid-State Transformers For AI Campuses
[Vantage](https://baxtel.com/data-centers/vantage-data-centers) has reserved more than 1GW of manufacturing capacity for Heron Link, the solid-state transformer made by Heron Power Electronics, to ...

Vantage Secures 1GW Of Heron Solid-State Transformers For AI Campuses

October 22, 2026 Vantage Data Centers

Vantage has reserved more than 1GW of manufacturing capacity for Heron Link, the solid-state transformer made by Heron Power Electronics, to deploy across its hyperscale data center campuses. The agreement, announced Oct. 21, delivers medium-voltage grid power straight to 800 volts DC, cutting...

Read more
Read Vantage Data Centers Raises $2B For North American Development Portfolio
Vantage Data Centers has secured $2 billion in financing to support early-stage development across its North American portfolio. The five-year revolving credit facility initially covers three devel...

Vantage Data Centers Raises $2B For North American Development Portfolio

September 15, 2026 Vantage Data Centers

Vantage Data Centers has secured $2 billion in financing to support early-stage development across its North American portfolio. The five-year revolving credit facility initially covers three development assets, with more eligible to be added. Vantage said the funding will accelerate project...

Read more
Read We Energies Begins Three Renewable Projects to Help Power Vantage Data Center
Wisconsin utility We Energies has begun construction on three renewable energy and battery storage projects, with about half of their combined capacity earmarked for a major AI data center campus i...

We Energies Begins Three Renewable Projects to Help Power Vantage Data Center

August 08, 2026 Vantage Data Centers

Wisconsin utility We Energies has begun construction on three renewable energy and battery storage projects, with about half of their combined capacity earmarked for a major AI data center campus in Port Washington. The projects include a 150MW solar farm with 50MWh of battery storage, a 110MW...

Read more
Read Vantage and Altarea Plan 400MW Data Center Development in Bordeaux, France
Vantage and Altarea Plan 400MW Data Center Development in Bordeaux, France

Vantage and Altarea Plan 400MW Data Center Development in Bordeaux, France

February 25, 2026 Vantage Data Centers

The campus, to be built on land owned by Altarea, is expected to rank among the largest data center developments in France, according to the companies. Altarea has already secured a 400MW grid connection for the site. However, the exact location and construction timeline have not been disclosed....

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?