Milan Data Center Market

Latest Podcast
Milan is Italy's largest data centre market, with most of the national capacity and cloud regions from AWS, Google and Microsoft. Its business base, the MIX exchange and a high-voltage grid draw hyperscale and AI campuses to a ring of towns around the city. Grid queues, power prices and local opposition limit growth. Read More

Market Facts

Milan Data Center Map

Milan Power Growth Over Time

+73% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Data Centers in Milan

Name Company Size Status Type
CyrusOne: Milan MIL1 CyrusOne Medium Construction, Planned Carrier-Neutral
CyrusOne: MIL2 CyrusOne Large Planned Carrier-Neutral
Digital Realty: Milan Digital Realty Trust Large Planned Carrier-Neutral
EdgeConneX: Lodi Campus EdgeConneX Extra Large Construction, Planned Carrier-Neutral
EdgeConneX: Milan 01 EdgeConneX Large Planned Carrier-Neutral
EdgeConneX: Milan 02 EdgeConneX Land Bank Carrier-Neutral
Equinix Milan ML2 Equinix Small Operational Carrier-Neutral
Equinix Milan ML3 Equinix Small Operational Carrier-Neutral
Equinix Milan ML4 Equinix Decommissioned Carrier-Neutral
Equinix Milan ML5 Equinix Small Operational, Planned Carrier-Neutral
Equinix: ML7x Equinix Medium Operational Carrier-Neutral
Equinix: ML6 Equinix Medium Planned Carrier-Neutral
Equinix: ML8 Equinix Small Construction Carrier-Neutral
Equinix: ML9x Equinix Medium Construction Carrier-Neutral
Equinix: ML10x Equinix Medium Planned Carrier-Neutral
Equinix: ML11x Equinix Medium Planned Carrier-Neutral
Equinix: Cusago ML12 Equinix Medium Planned Carrier-Neutral
Equinix: Cusago ML13 Equinix Medium Planned Carrier-Neutral
Stack: MIL01A STACK INFRASTRUCTURE Small Operational HPC
STACK: MIL02A STACK INFRASTRUCTURE Small Operational HPC
Stack: MIL01B STACK INFRASTRUCTURE Small Operational HPC
Stack: MIL03A STACK INFRASTRUCTURE Small Operational HPC
Stack: MIL08B STACK INFRASTRUCTURE Small Construction HPC
Stack: MIL01C STACK INFRASTRUCTURE Small Operational HPC
Stack: MIL04A STACK INFRASTRUCTURE Small Operational HPC
Stack: MIL04B STACK INFRASTRUCTURE Medium Construction HPC
Stack: MIL04C STACK INFRASTRUCTURE Small Operational HPC
Stack: MIL04D STACK INFRASTRUCTURE Medium Planned HPC
Stack: MIL05A STACK INFRASTRUCTURE Large Construction HPC
Stack: MIL05B STACK INFRASTRUCTURE Small Planned HPC
Stack: MIL06A STACK INFRASTRUCTURE Medium Construction HPC
Stack: MIL06B STACK INFRASTRUCTURE Small Construction HPC
Stack: MIL07 STACK INFRASTRUCTURE Small Planned HPC
Stack: MIL08A STACK INFRASTRUCTURE Medium Planned HPC
Stack: MIL09A STACK INFRASTRUCTURE Large Planned HPC
Stack: MIL10 STACK INFRASTRUCTURE Land Bank HPC
Stack: MIL11 STACK INFRASTRUCTURE Land Bank HPC
Level3 Milan (Via Tortona) Lumen Technologies Decommissioned Carrier
Carrier Data CenterInterested in this information?Contact us Lumen Technologies Extra Small Operational Carrier
NTT: Milan NTT Land Bank Carrier-Neutral (Telco-Owned)
QTS: Vimercate, Milan QTS Data Centers Extra Large Planned Carrier-Neutral
Vantage: MXP11 Vantage Data Centers Medium Operational Carrier-Neutral
Vantage: MXP21 Vantage Data Centers Medium Operational Carrier-Neutral
Carrier-Neutral Data CenterInterested in this information?Contact us Vantage Data Centers Medium Planned Carrier-Neutral
Vantage: MXP12 Vantage Data Centers Medium Planned Carrier-Neutral
Vantage: MXP13 Vantage Data Centers Medium Construction Carrier-Neutral
Vantage: MXP14 Vantage Data Centers Medium Planned Carrier-Neutral
Vantage: MXP22 Vantage Data Centers Medium Construction Carrier-Neutral
Carrier-Neutral Data CenterInterested in this information?Contact us Vantage Data Centers Medium Planned Carrier-Neutral
Carrier-Neutral Data CenterInterested in this information?Contact us Vantage Data Centers Extra Large Planned Carrier-Neutral
Carrier-Neutral Data CenterInterested in this information?Contact us Vantage Data Centers Land Bank Carrier-Neutral
Carrier Data CenterInterested in this information?Contact us Verizon Enterprise Small Operational Carrier
Virtus: Milan 1 VIRTUS Data Centres Ltd Large Planned Carrier-Neutral
EXA: Edge DC Milan EXA Infrastructure Extra Small Operational Carrier
Data4: Milan 1 DC1 DATA4 Group Small Operational Carrier-Neutral
Data4: Vittuone Campus DATA4 Group In Doubt Carrier-Neutral
Data4: Milan 1 DC2 DATA4 Group Small Operational Carrier-Neutral
Data4: Milan 1 DC3 DATA4 Group Small Operational Carrier-Neutral
Data4: Milan 1 DC4 DATA4 Group Small Operational Carrier-Neutral
Data4: Milan 1 DC5 DATA4 Group Small Operational Carrier-Neutral
Data4: Milan 1 DC6 DATA4 Group Small Operational Carrier-Neutral
Data4: Milan 1 DC7 DATA4 Group Small Operational Carrier-Neutral
Data4: Milan 1 DC10 DATA4 Group Small Operational Carrier-Neutral
Data4: Milan 1 DC9 DATA4 Group Small Operational Carrier-Neutral
Data4: Milan 1 DC8.2 DATA4 Group Small Operational Carrier-Neutral
Data4: Milan 1 DC11 DATA4 Group Small Construction Carrier-Neutral
Data4: Milan 1 DC12 DATA4 Group Small Planned Carrier-Neutral
Data4: Milan 1 DC15 DATA4 Group Small Construction Carrier-Neutral
Data4: Milan 1 DC14 DATA4 Group Small Planned Carrier-Neutral
Data4: Milan 1 DC8.1 DATA4 Group Small Construction Carrier-Neutral
Aruba: IT3 DC-A Aruba S.p.A. Small Operational Carrier-Neutral
Aruba: IT3 DC-B Aruba S.p.A. Small Operational Carrier-Neutral
Aruba: IT3 DC-C Aruba S.p.A. Small Operational Carrier-Neutral
Aruba: IT3 DC-D Aruba S.p.A. Small Construction Carrier-Neutral
Aruba: IT3 DC-E Aruba S.p.A. Withdrawn Carrier-Neutral
CDLAN C21 Milan CDLAN Small Operational Carrier-Neutral
Khazna: Ferrera Erbognone, Lombardy Khazna Large Planned Carrier-Neutral
Khazna: Ferrera Erbognone Expansion Khazna Land Bank Carrier-Neutral
Keppel Milan Keppel Data Center REIT Small Operational Carrier-Neutral
CloudHQ: MXP1 CloudHQ Large Planned Carrier-Neutral
CloudHQ: MXP2 CloudHQ Large Planned Carrier-Neutral
CloudHQ: MXP3 CloudHQ Large Planned Carrier-Neutral
CloudHQ: MXP4 CloudHQ Large Planned Carrier-Neutral
CloudHQ: MXP5 CloudHQ Large Planned Carrier-Neutral
CenterInterested in this information?Contact us Microsoft Azure Small Operational Hyperscale
NorthInterested in this information?Contact us Microsoft Azure Large Construction Hyperscale
West ParkInterested in this information?Contact us Microsoft Azure Small Operational Hyperscale
Park BetaInterested in this information?Contact us Microsoft Azure Medium Construction Hyperscale
Plaza PrimeInterested in this information?Contact us Microsoft Azure Medium Planned Hyperscale
HubInterested in this information?Contact us Microsoft Azure Medium Planned Hyperscale
Core PlazaInterested in this information?Contact us Google Small Operational Hyperscale
Prime PointInterested in this information?Contact us Google Small Operational Hyperscale
OVH: Milan OVH Group Small Operational Content
Compass Milan Compass Datacenters Medium Operational Carrier-Neutral
Compass Milan MXP-II Compass Datacenters Medium Planned Carrier-Neutral
Campus UltraInterested in this information?Contact us Amazon AWS Large Construction Hyperscale
Cloud CenterInterested in this information?Contact us Amazon AWS Medium Planned Hyperscale
GammaInterested in this information?Contact us Amazon AWS Medium Planned Hyperscale
Hyperscale Data CenterInterested in this information?Contact us Amazon AWS Small Planned Hyperscale
TI Sparkle: Milan Cassina de' Pecchi Telecom Italia Sparkle S.p.A. Extra Small Operational Carrier
Echelon: LIN10 Bldg-1 Echelon Data Centres Large Planned Carrier-Neutral
Echelon: LIN10 Bldg-2 Echelon Data Centres Land Bank Carrier-Neutral
K2: Milan Campus K2 Data Centres Land Bank Carrier-Neutral
Real Estate Data CenterInterested in this information?Contact us Goodman Group Large Planned Real Estate
Noovle: Rozzano DC4 Noovle S.p.A Small Operational Content
Noovle: Santo Stefano Ticino Noovle S.p.A Small Construction, Operational, Prospective Expansion Content
Noovle: Cassina de' Pecchi Noovle S.p.A Small Operational Content
Noovle: Cesano Maderno Noovle S.p.A Small Operational Content
Noovle: Rozzano Campus Noovle S.p.A Small Operational, Planned Content
Content Data CenterInterested in this information?Contact us Noovle S.p.A Small Planned Content
DAMAC: Milan MIL01 DAMAC Digital Extra Large Planned, Prospective Expansion Carrier-Neutral
Apto: Lacchiarella Apto Extra Large Planned Carrier-Neutral
Private Equity Data CenterInterested in this information?Contact us Stoneshield Capital Large Planned Private Equity
Templus: Milan MIL01 Templus Small Operational Carrier-Neutral
Rai Way: Milan Rai Way Extra Small Operational Carrier
hscale: Milan MXP1 hscale Large Planned Carrier-Neutral
hscale: MXP2 Bldg1 hscale Large Planned Carrier-Neutral
hscale: MXP2 Bldg2 hscale Large Planned Carrier-Neutral
hscale: MXP2 Bldg3 hscale Large Planned, Prospective Expansion Carrier-Neutral
Seeweb: Milan Caldera Seeweb Srl Extra Small Operational MSP
Eni Green Data Center Eni SpA Medium Operational Carrier-Neutral
Carrier-Neutral Data CenterInterested in this information?Contact us Magnora Land Bank Carrier-Neutral
GSM: Certosa di Pavia G.S.M. S.r.l. Medium Planned Real Estate
Retelit: Avalon 1 Milan Retelit S.p.A. Small Operational Carrier-Neutral
Retelit: Avalon 5 Retelit S.p.A. Small Operational Carrier-Neutral
Retelit: Avalon 3 Retelit S.p.A. Small Operational, Planned Carrier-Neutral
Retelit: Corsico DC2 Retelit S.p.A. Small Planned Carrier-Neutral
Retelit: Corsico DC1 Retelit S.p.A. Small Planned Carrier-Neutral
Retelit: Avalon 2 Retelit S.p.A. Extra Small Operational Carrier-Neutral
Retelit: Bergamo Retelit S.p.A. Extra Small Operational Carrier-Neutral
Retelit: Brescia Retelit S.p.A. Extra Small Operational Carrier-Neutral
Unidata: Milan Unidata Extra Small Operational Mobile
Poste Italiane: Lombardy Poste Italiane Land Bank Government
Vitali: Arcene Innovation Hub Vitali S.p.A Large Planned, Prospective Expansion Real Estate
Vaultica: MIL03 Vaultica Small Construction Carrier-Neutral
Vaultica: Siziano MIL01 Vaultica Small Operational Carrier-Neutral
Greenfield: Milan Greenfield Large Planned Real Estate
Real Estate Data CenterInterested in this information?Contact us Greenfield Land Bank Real Estate
Real Estate Data CenterInterested in this information?Contact us Greenfield Land Bank Real Estate
MIX: Milan Caldera MIX Extra Small Operational Carrier-Neutral
Elmec: Brunello BR4 Elmec Informatica Small Operational MSP
Fastweb: Milan Caracciolo Fastweb Extra Small Operational Carrier
Fastweb: Milan Lorenteggio Fastweb Small Operational Carrier
Scaleway: Brescia Scaleway Extra Small Operational, Planned Neocloud
A2A: Brescia Lamarmora A2A Land Bank Energy
A2A: Cassano d'Adda A2A Land Bank Energy
Green 1: Pozzaglio ed Uniti Green 1 (Italy) Land Bank Real Estate
Travagliato Data Center East Gate Withdrawn Real Estate
AiOnX: Pregnana Innovation Campus AiOnX Land Bank Real Estate

Largest Providers in Milan

STACK INFRASTRUCTURE
Site
Power
Operational
7
50.6
Construction
5
Planned
5
Prospective Expansion
0
Land Bank
2
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
12
View Provider
DATA4 Group
Site
Power
Operational
10
55.4
Construction
3
Planned
2
Prospective Expansion
0
Land Bank
0
In Doubt
1
Withdrawn
0
Decommissioned
0
Totals
13
View Provider
EdgeConneX
Site
Power
Operational
0
0.0
Construction
1
Planned
2
Prospective Expansion
0
Land Bank
1
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
1
View Provider
Microsoft Azure
Site
Power
Operational
2
16.14
Construction
2
Planned
2
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
4
View Provider

Largest Data Centers in Milan

Location About Total SqFt Power (MW)
Eni Green Data Center
Eni's Green Data Center at Ferrera Erbognone, south-west of Milan, hosts the energy group's IT an...
NN Request Dataset
Compass Milan
Compass Milan MXP-I is a single-storey data center built by Compass Datacenters and Hines at Sant...
NN Request Dataset NN Request Dataset
Equinix: ML7x
Equinix ML7x is the second IBX on Equinix's Settimo Milanese campus, at Via Marisa Bellisario 7 w...
NN Request Dataset
Vantage: MXP11
Once fully developed, the MXP1 campus will offer 517,000 square foot (48,000 square meters) of da...
NN Request Dataset
Vantage: MXP21
Located in Castelletto, about 15 kilometers from the city center, the MXP2 campus will span 10,00...
NN Request Dataset NN Request Dataset

Sites Under Construction in Milan

Location Building SqFt Power (MW) Estimated Launch
Data4: Milan 1 DC11 117,670 SqFt 15 Megawatts
Data4: Milan 1 DC8.1 111,410 SqFt 10 Megawatts
Stack: MIL06B 61,892 SqFt 10 Megawatts
Retelit: Corsico DC2 96,875 SqFt 0 Megawatts
Data4: Milan 1 DC15 117,670 SqFt 15 Megawatts
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030

Data Center Events in Milan See all

1 events
Event Starts in Details
180 days
View DCN Milan 2027
Organized by:
Data Center Nation
Type:
Data Center
Description:

DCN Milan 2027 is an annual digital infrastructure summit organized by Data Center Nation, taking place on May 27, 2027 at Allianz MiCo in Milan, Italy. Entering its sixth edition, the full-day gathering connects hyperscalers, colocation operators, enterprise buyers, engineering consultants, utilities, and infrastructure technology suppliers. The summit expects more than 3,400 data center decis...

About Milan

Milan Data Centre Market Overview

Milan, the capital of Lombardy, is the largest data centre market in Italy. Colocation first grew inside the city, around the MIX internet exchange and the carriers. Since AWS opened its Milan cloud region in 2020, hyperscale and wholesale campuses have spread to a ring of towns west, south and east of the city. Lombardy's grid requests now dwarf what Terna can connect. Local opposition has grown alongside them.

History

Milan's market grew out of its internet exchanges. CILEA opened a neutral exchange point in the city in April 1995. In January 2000, 28 operators founded MIX to run a dedicated exchange, which now sits at Via Caldera 21 in western Milan. Colt opened its Milan internet centre that June. TelecityGroup ran a facility on Via Savona and opened a second at Basiglio in 2009.

Global operators bought in from 2016. Equinix entered Milan that January when it closed its purchase of TelecityGroup. Keppel DC REIT bought a Milan data centre the same year. SUPERNAP Italia opened the first building of its Siziano campus, south of the city, in 2016. The campus later passed to STACK, which opened its third building there in 2022. Data4 completed its first building at Cornaredo, to the west, in 2016. Aruba opened its Global Cloud Data Center at Ponte San Pietro, near Bergamo, in October 2017.

The cloud providers followed. AWS opened its Milan region in April 2020 with three Availability Zones. Google opened its Milan region with TIM in June 2022. Microsoft launched Italy North in June 2023. Ownership then turned over. AtlasEdge bought Colt's Milan centre in 2021 and sold it to Templus in 2026. Apollo funds bought STACK's European colocation business in 2025, and it now runs as Vaultica.

Data Centres in Milan Today

Equinix, Data4, STACK and Vantage lead the colocation and wholesale market. Equinix's flagship campus sits in Settimo Milanese, west of the city. It plans seven more data centres there and in Cusago. Data4's Milan 1 campus spans Cornaredo and Settimo Milanese. STACK and Vaultica share the Siziano campus to the south. STACK lists eleven Milan campuses, reaching east to Vignate and Melzo. Vantage runs a campus at Melegnano and is building another at Settimo Milanese. Aruba's campus at Ponte San Pietro covers about 200,000 m² and hosts Fastweb's NeXXt AI factory.

The MIX data centre at Via Caldera 21 anchors interconnection in western Milan. The same business park houses Retelit's Avalon campus, CDLAN, Seeweb and EXA. MIX connects 471 networks. Its access points also reach Equinix, Data4, Vaultica and Aruba sites.

AWS, Google and Microsoft all run cloud regions in the metro. The government declared AWS's expansion at Rho, Pero and Zibido San Giacomo of strategic national interest. Microsoft runs data centres at Settala and is building at San Bovio, in Peschiera Borromeo. Compass opened its first building at Noviglio in September 2026. EdgeConneX, K2, hscale, CyrusOne and Digital Realty all have campuses in planning or construction. Eni plans an AI campus with Khazna beside its own supercomputing centre at Ferrera Erbognone.

Why Build Data Centres in Milan?

  • Demand. Milan holds most of Italy's operating capacity.
  • Interconnection. MIX peaks at 3.89 Tbps, almost three times the peak at Rome's Namex.
  • High-voltage grid. About three-quarters of Milan's capacity connects at high voltage, through Terna substations such as Rho, Ospiate, Baggio and Lacchiarella.
  • Clear regional rules. Lombardy passed Italy's first regional data-centre law in June 2026. It set up a single regional window and cuts building levies by 10% to 30% on brownfield sites.

What Limits Data Centre Growth in Milan?

  • Grid queue. In November 2026 Terna reported 316 data-centre applications in Lombardy, totalling 48.6 GW. Only 1.6 GW, from 12 projects, had reached the final connection phase. The region's 14 large operating data centres have about 800 MW connected.
  • Local opposition. Dozens of Lombard committees formed the Stop Data Center network in July 2026. Over 1,000 people marched in central Milan that October. The network then asked the government for a moratorium. A project at Travagliato, near Brescia, was withdrawn after protests. Rho raised its development charges for data centres.
  • Environmental review. In October 2026 the environment ministry issued a negative environmental assessment for Data4's planned Vittuone campus.
  • Farmland levies. Lombardy's law doubles building levies on farmland and triples them in parks.
  • Power prices. Italian wholesale electricity averaged €116 per MWh in 2025, against an EU average of €85.

Milan Data Centre Trends

  • International entrants lead the build. Most companies with announced Italian projects are new to the market, and they account for most planned investment.
  • The state fast-tracks the largest programmes. Five of Italy's seven programmes of strategic national interest sit in Lombardy, from AWS, Equinix, Vantage, EdgeConneX and K2.
  • Ownership keeps changing. Vaultica and Templus took over established Milan sites in 2025 and 2026. Retelit is exploring a sale of its data centres.
  • Cooling rules are tightening. The regional law encourages heat recovery and low-water cooling. Proposed regional amendments make closed-loop cooling mandatory.
  • The pipeline far exceeds demand. Lombard grid requests total 48.6 GW, many times what the industry expects to need.

Power and Policy in Milan

Terna runs the high-voltage grid and the connection queue. Since January 2025 A2A's Duereti network has served the belt east, south and west of Milan, which e-distribuzione served before. A2A's Unareti distributes power in the cities of Milan and Brescia. Lombardy Regional Law 11 of 3 June 2026 sets siting rules and levies for data centres. Two regional resolutions of August 2026 assign authority by the thermal power of a site's backup generators. The Region decides projects from 50 to under 300 MWt, and the Ministry of the Environment and Energy Security (MASE) decides larger ones. Smaller projects need no single data-centre procedure. Nationally, Law 49/2026 sets a 10-month deadline for the single authorisation.

Get Quotes

Related News See all

Read Vantage Drops 500MW Trident Data Center After Aurora Moratorium
Vantage Data Centers has dropped its Trident data center in Aurora, Colorado, after the city council approved a moratorium on new data center applications. Council members voted unanimously on Nov....

Vantage Drops 500MW Trident Data Center After Aurora Moratorium

November 25, 2026 Vantage Data Centers

Vantage Data Centers has dropped its Trident data center in Aurora, Colorado, after the city council approved a moratorium on new data center applications. Council members voted unanimously on Nov. 23 for Resolution R2026-146, which pauses new data center applications west and south of Interstate...

Read more
Read Rolling Meadows Approves Digital Realty's 156MW Data Center Campus
Rolling Meadows backed a tax incentive on Nov. 24 for Digital Realty's 156MW data center, over objections from residents who packed the council chambers. Councilors voted 4-2 to support a Cook Coun...

Rolling Meadows Approves Digital Realty's 156MW Data Center Campus

November 25, 2026 Digital Realty Trust

Rolling Meadows backed a tax incentive on Nov. 24 for Digital Realty's 156MW data center, over objections from residents who packed the council chambers. Councilors voted 4-2 to support a Cook County Class 6b tax break for the project at 3800 Golf Road, CBS Chicago reported. The council also...

Read more
Read NTT Signs MoU With B.Grimm for 400MW Thailand Data Center Campus
NTT Global Data Centers and Amata B.Grimm Power signed a memorandum of understanding on Nov. 19 to study a 400MW campus in Chonburi, Thailand. B.Grimm Power put the investment at more than THB 113 ...

NTT Signs MoU With B.Grimm for 400MW Thailand Data Center Campus

November 24, 2026 NTT

NTT Global Data Centers and Amata B.Grimm Power signed a memorandum of understanding on Nov. 19 to study a 400MW campus in Chonburi, Thailand. B.Grimm Power put the investment at more than THB 113 billion, about $3.3 billion. The company said the project is expected to create more than 2,500...

Read more
Read Lea County Approves $130B Bond Deal For Google's Project Rancho
Lea County commissioners approved $130 billion in industrial revenue bonds for Project Rancho, a [Google](https://baxtel.com/data-centers/google) data center planned west of Hobbs, [New Mexico](htt...

Lea County Approves $130B Bond Deal For Google's Project Rancho

November 23, 2026 New Mexico

Lea County commissioners approved $130 billion in industrial revenue bonds for Project Rancho, a Google data center planned west of Hobbs, New Mexico. The 4-1 vote came at a Nov. 19 meeting in Lovington, where the board also rejected a proposed six-month moratorium on data center development, the...

Read more
Read Apollo, Ardian, Macquarie And Rai Way Bid For Retelit's Italian Data Centers
Apollo-backed Vaultica Data Centers and three other bidders have submitted offers for the data center business of Italian telecoms group Retelit. Ardian, Macquarie and Italian tower operator Rai Wa...

Apollo, Ardian, Macquarie And Rai Way Bid For Retelit's Italian Data Centers

November 20, 2026 Retelit S.p.A.

Apollo-backed Vaultica Data Centers and three other bidders have submitted offers for the data center business of Italian telecoms group Retelit. Ardian, Macquarie and Italian tower operator Rai Way filed non-binding bids and remain in the process, according to a Bloomberg report covered by Data...

Read more
Read CyrusOne and KEP Top Out 48MW OSK1 Data Center in Japan
CyrusOne and Kansai Electric Power Company have [topped out OSK1](https://www.facebook.com/CyrusOne/posts/cyrusone-keps-first-data-center-in-japan-designed-to-deliver-48-mw-of-it-capacit/1631891085...

CyrusOne and KEP Top Out 48MW OSK1 Data Center in Japan

November 20, 2026 CyrusOne

CyrusOne and Kansai Electric Power Company have topped out OSK1, the first data center under their Japanese joint venture, at a planned 48MW of IT capacity. CyrusOne and KEP marked the structural completion this week with a traditional Jōtōshiki ceremony. CyrusOne KEP, the 50:50 joint venture the...

Read more

Related Podcasts See all

E11: Building India’s Digital Backbone with Sharad Agarwal

Executive Summary In this episode recorded live at PTC 26, Eric Bell speaks with Sharad Agarwal, ...

E10 - AI Cooling And Data Centers With Cliff Federspiel

In this episode, we sit down with Cliff Federspiel, President and CTO of Vigilent, to explore how...

E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins

In this Baxtel Podcast episode, Eric Bell sits down with Wes Cummins, CEO of Applied Digital, to ...

E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load

In this episode, Eric Bell sits down with Russell Fletcher to unpack what it really means to oper...

E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse

Nick Kruse is a chemical engineer turned energy entrepreneur who sits at the nexus of power and c...

E5: Mark Jobson on Data Center Strategy, Marketing, and IPOs

In this episode of Baxtel’s Meet Me Room podcast, we sit down with global marketing executive Mar...
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.