Edgnex: Izmir
Designed to Tier III standards, the carrier-neutral facility will initially provide 13,500 square meters (145,310 square feet) of space.
Edgnex Data Centers by DAMAC Nutshell:
Edgnex Data Centers by DAMAC is a Dubai headquartered data center developer and operator with projects announced or underway in Saudi Arabia, Thailand, Indonesia, Spain, Greece, and the Nordics.
Overview:
Edgnex Data Centers by DAMAC is a privately held digital infrastructure platform owned by DAMAC Group that develops and operates data centers across the Middle East, Southeast Asia, and Europe. The company was established in 2021 and has announced expansions including a 20 MW campus in Bangkok, a 40 MW site in Madrid, and a joint venture in Greece with a 12.5 MW first phase at Spata. In 2025 it disclosed a $2.3 billion, 144 MW AI focused project in Jakarta and plans to enter the United States market with a large scale build program. In April 2025 it acquired Finland founded developer Hyperco to support growth in the Nordics.
Designed to Tier III standards, the carrier-neutral facility will initially provide 13,500 square meters (145,310 square feet) of space.
Dubai-based DAMAC Digital is making a landmark entry into the Philippine tech landscape with plans to establish the country's largest data center in Laguna.
Located in the Greenland International Industrial Center (GIIC) in Bekasi, the DAMAC Digital Cikarang AI Data Center represents a landmark $2.3 billion investment in Indonesia’s digital future.
UAE data center firm Edgnex is building a data center in Jakarta, Indonesia. The facility is to be located along MT Haryono.
The facility, located in the Attica region, is part of a joint venture named Data In Scale (DIS), formed between Edgnex’s parent company, DAMAC, and the PPC Group, an electricity utility.
The land was acquired by DAMAC Digital Solution Ohio in December 2025, and DAMAC is now the expected developer moving the project forward.
Originally developed and marketed by Active Infrastructure in partnership with commercial real estate firm JLL, the Midwest Digital Gateway is a two-campus hyperscale development in Canton, Ohio.
This facility will be a part of Edgnex Riyadh data center campus in Saudi Arabia.
DAMAC Digital MIL01 is a planned, purpose-built data center facility developed by UAE-based DAMAC Digital (EDGNEX) on the former 55,000sqm Gefco-Citroën industrial site at Viale dell'Industria in Pregnana Milanese, Italy.
The first phase of the 19,000 sqm (204,515 sq ft), multi-story, Tier III-quality campus is scheduled to be operational by 2026.
DAMAC Digital plans to convert an existing Logistics Park Kansas City warehouse in Edgerton into its Project Heartland data center.
This planned facility is a part of Edgnex's Bangkok campus in Thailand.
Edgnex, a UAE-based data center company, is building a new facility in Spain. The site, located in the Vicalvaro region, was purchased from ActivumSG, a European real estate private equity manager.
EDGNEX, the digital infrastructure arm of DAMAC Group, operates a data center campus in Riyadh, Saudi Arabia. The first building on this campus spans 17,720 sqm.
The Dammam facility spans 12,320 square meters over three floors and has earned Uptime Tier III design certification.
The company will invest RM250 million ($52.4 million) to develop the facility on a 1.21-hectare plot of land.
Crescendo Corporation, a Malaysian property developer, has sold 74,360 sqm (800,400 sq ft) of land in the Nusa Cemerlang Industrial Park to Data Cloud Innovation Sdn Bhd for RM120 million ($27.1m).
Hyperco has acquired a 130-hectare plot in Pyhäjoki’s Keskikylä area for the development of a large-scale data center.
Hyperco is building a data center campus at the eastern E18 interchange (Itäinen liittymä) in Loviisa, on a city plot of about 25 hectares plus land leased from Metsähallitus. Hyperco is part of DAMAC's data center business.
Hyperco Oy plans to build a data center complex on a 22.3-hectare site in Kittfall, Virkkala, Lohja, situated about 9 kilometers southwest of Lohja's city center.
Hyperco, a Nordic data center firm, is eyeing a significant expansion with plans to construct a new campus in Espoo, Finland, a municipality adjacent to Helsinki.
Hyperco owns the data center building at Myllynkivenkuja 4 in Vantaa, which houses Equinix HE4 and Thales. Hyperco has been part of DAMAC's data center business since 2025.
Finnish data center development and operation specialist Hyperco Oy is currently building a major data center in Koria, Kouvola, in partnership with the main contractor YIT.
Hyperco plans to build a second data center beside its existing Koria development in Kouvola. The two-story facility received a building permit in June 2026 and will include supporting substations, water storage, backup generation, and service buildings.
October 29, 2026 Johor
Malaysia's government has approved a requirement for data centers to source at least 30 percent of their power from renewable energy. Deputy Prime Minister Datuk Seri Fadillah Yusof told the Dewan Rakyat on October 27 that the rule applies to a data center's total capacity or its energy...
Read more
October 21, 2026 Ohio
Cleveland City Council voted on the night of Oct. 19 to extend the city's moratorium on new data centers through Jan. 29, 2027, or until council enacts permanent rules. The extension keeps zoning permits and occupancy certificates frozen for new standalone data centers and also covers expansions...
Read more
October 14, 2026 Johor
A seven-bank consortium has added RM15 billion, about US$3.67 billion, to DayOne's Johor data center financing, lifting the Singapore-headquartered operator's debt platform in Malaysia's southern state to RM30 billion, or roughly US$7.3 billion. The lenders set out the upsizing in a joint...
Read more
September 09, 2026 DAMAC Digital
Damac Digital and Vodafone Türkiye have begun construction of their planned data center in Izmir, western Turkey. The project was first announced in 2024 with a $100 million investment, but Damac Digital has now increased the budget to $300 million. The facility will be Vodafone’s second data...
Read more
September 08, 2026 Milan
UK infrastructure developer Greenfield and Finsbury Infrastructure plan to invest up to €360 million ($418m) to develop a 36MW data center east of Milan, Italy. Greenfield has already secured 80MW of power capacity for the site, which will support AI, cloud, and enterprise workloads while...
Read more
July 31, 2026 Ohio
French energy and water utility Veolia has been selected to operate and maintain a 350MW microgrid powering an undisclosed AI data center campus in Ohio. The behind-the-meter energy system is designed to supply 100% of the facility’s power needs, combining gas engines, linear generators, and a...
Read more