Stack: MIL11

Land Bank
Land secured for future development
Operated by:

Stack: MIL11

Short Code: MIL11

MIL11 is a STACK data center campus planned south of Milan, in the Lacchiarella area, with two buildings on 33 acres. STACK has not disclosed the exact site.

Map and Nearby Locations

STACK INFRASTRUCTURE Sites
Nearby Facilities

Sites within 15 miles of Stack: MIL11

Distance Site About
0.04 miles Apto: Lacchiarella
Apto, a European firm, plans a massive €3 billion ($3.4bn) data center campus in Lacchiarella, near Milan, Italy.
1.14 miles Compass Milan
2.30 miles Equinix Milan ML3
Telecity opened this data center in Basiglio, its second in Milan, in 2009. Equinix acquired Telecity in January 2016.
3.15 miles Stack: MIL04B
MIL04B is the second of four buildings on STACK's MIL04 campus at Giovenzano, Vellezzo Bellini, south of Milan.
3.17 miles Rai Way: Milan
Rai Way's Siziano Campus is located in Milan, Italy.
3.21 miles Stack: MIL04A
MIL04A is the first of four buildings on STACK's MIL04 campus at Giovenzano, Vellezzo Bellini, south of Milan.
3.22 miles STACK: MIL02A
Stack Infrastructure's MIL02A data center sits adjacent to the MIL01 campus and is served by 100% renewable power. This is Stack's third data center in Siziano.
3.23 miles Stack: MIL04C
MIL04C is the third of four buildings on STACK's MIL04 campus at Giovenzano, Vellezzo Bellini, south of Milan.
3.29 miles Stack: MIL04D
MIL04D is the planned fourth building on STACK's MIL04 campus at Giovenzano, Vellezzo Bellini, south of Milan.
3.30 miles Stack: MIL01B
STACK's MIL01B is the second building on the MIL01 campus in Siziano, south of Milan, with two independent data halls. SUPERNAP Italia completed it in 2021 and it became STACK in 2022.
3.41 miles Stack: MIL01A
STACK's MIL01A is the first building on the MIL01 campus in Siziano, south of Milan. SUPERNAP Italia opened it in 2016 and it became STACK in 2022. Vaultica also sells colocation on the campus.
3.42 miles Vaultica: Siziano MIL01
Vaultica sells carrier-neutral enterprise colocation on STACK's MIL01 campus in Siziano, south of Milan. The business was part of STACK until Apollo-managed funds bought it in 2025.
3.51 miles Stack: MIL01C
STACK's MIL01C is the smallest of three buildings on the MIL01 campus in Siziano, south of Milan, with solar panels on its roof. STACK built it from 2023.
3.69 miles Stack: MIL07
MIL07 is a planned STACK data center in Siziano, south of Milan, near STACK's MIL01 campus.
3.71 miles Stack: MIL08A
MIL08A is the larger of two buildings on STACK's MIL08 campus in Siziano, south of Milan.
3.72 miles Stack: MIL08B
STACK's MIL08B is the smaller of two buildings on its MIL08 campus in Siziano, south of Milan, near the MIL01 campus.
3.82 miles Stack: MIL03A
STACK's MIL03A is a single-building data center in Siziano, south of Milan, between its MIL01 and MIL08 campuses.
4.32 miles Noovie: Rozzano DC4
4.47 miles EdgeConneX: Milan 01
This facility is part of the EdgeConneX Campus Italia program, a €3 billion digital infrastructure initiative fast-tracked by the Italian government as a project of national strategic interest.
4.77 miles GSM: Certosa di Pavia
Spearheaded by real estate developer GSM, the proposed 646,000 sq ft complex would consist of three buildings situated near the town’s historic 14th-century monastery.
5.69 miles ValleyInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
5.77 miles EastInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
8.20 miles Retelit: Corsico DC1
A high-density data center facility in Milan Corsico built on a repurposed industrial site to support artificial intelligence workloads and regional heat recycling.
8.23 miles Retelit: Corsico DC2
A high-density data center facility in Milan Corsico built on a repurposed industrial site to support artificial intelligence workloads and regional heat recycling.
8.57 miles Vantage: MXP14
MXP14 is one of four data centers on Vantage's MXP1 campus in Melegnano, south-east of Milan, in the campus's second building.
8.59 miles Vantage: MXP12
MXP12 is one of four data centers on Vantage's MXP1 campus in Melegnano, south-east of Milan, in the campus's second building.
8.59 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
8.65 miles Vantage: MXP13
MXP13 is one of four data centers on Vantage's MXP1 campus in Melegnano, south-east of Milan, in the campus's first building.
8.66 miles Vantage: MXP11
Once fully developed, the MXP1 campus will offer 517,000 square foot (48,000 square meters) of data center space with 300W/SF (3.2kW/M²) average density.
8.78 miles Retelit: Avalon 3
A carrier-neutral, Tier IV-designed colocation data center within Retelit's virtualized Milan campus.
8.80 miles Equinix Milan ML2
The site was a Telecity managed datacenter before Equinix acquired Telecity in January 2016.
9.02 miles Level3 Milan (Via Tortona)
9.14 miles Keppel Milan
9.34 miles NTT: Milan
NTT Data has acquired 53 acres of land to develop a data center near Milan, Italy.
9.39 miles Equinix: Cusago ML13
ML13 is one of two data centers Equinix plans in Cusago, south-west of Milan.
9.46 miles Equinix: Cusago ML12
ML12 is one of two data centers Equinix plans in Cusago, south-west of Milan.
10.15 miles K2: Milan Campus
Malaysian conglomerate Kuok Group, through its digital infrastructure arm K2 Strategic, is planning a massive €5.3 billion ($6 billion) investment to develop and manage a hyperscale data center campus on the southern outskirts of Milan.
10.15 miles EdgeConneX: Milan 02
This facility is part of the EdgeConneX Campus Italia program, a €3 billion digital infrastructure initiative fast-tracked by the Italian government as a project of national strategic interest.
10.18 miles Poste Italiane: Lombardy
Italian state-controlled operator Poste Italiane is developing a large-scale AI data center in Lombardy for model training and inference, having already secured both the land and power supplier.
10.18 miles Magnora: Milan 2
Magnora secured industrial-zoned land near Milan for a new data center development, with grid studies underway and a potential sale milestone in 2027.
10.37 miles Real Estate Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
10.44 miles Level3 Milan (Via S Giusto)
10.70 miles BT Italia: Milan BF1
BT Italia has been operating its own data centers since 2001.
10.76 miles Retelit: Avalon 1 Milan
A carrier-neutral network hub and colocation facility located within the Caldera Business Park in Milan, serving as the core connectivity point for the virtualized Avalon Campus.
10.82 miles GTT Milan
10.95 miles CDLAN C21 Milan
10.98 miles MOMIT Milan
11.31 miles Greenfield: Milan
UK infrastructure developer Greenfield has partnered with Irish specialist investor Finsbury Infrastructure to construct a €360 million ($418 million) data center east of Milan, Italy.
11.40 miles Data4: Milan 1 DC6
DC6 is the sixth data center on Data4's Milan 1 campus in Cornaredo and Settimo Milanese, a Design Y' building with about 2,000 m² of IT space.
11.40 miles Data4: Milan 1 DC5
DC5 is the fifth data center on Data4's Milan 1 campus in Cornaredo and Settimo Milanese, a Design Y' building with about 2,000 m² of IT space.
11.40 miles Data4: Milan 1 DC4
DC4 is the fourth data center on Data4's Milan 1 campus in Cornaredo and Settimo Milanese, a Design Y building of about 5,000 m² with 2,000 m² of IT space.
11.40 miles Data4: Milan 1 DC3
DC3 is the third data center on Data4's Milan 1 campus in Cornaredo, a two-storey Design X building that shares DC1's layout.
11.41 miles Data4: Milan 1 DC7
DC7 is the seventh data center on Data4's Milan 1 campus in Cornaredo and Settimo Milanese, a two-storey Design L' building with about 4,000 m² of IT space.
11.41 miles Data4: Milan 1 DC8.2
DC8.2 is one of two mirrored two-storey data centers on the Verdi-Tower lot of Data4's Milan 1 campus in Settimo Milanese.
11.45 miles Data4: Milan 1 DC8.1
DC8.1 is one of two mirrored two-storey data centers on the Verdi-Tower lot of Data4's Milan 1 campus in Settimo Milanese, under construction since 2024.
11.45 miles Prime PlazaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
11.45 miles Data4: Milan 1 DC10
DC10 is a Design Y' data center on Data4's Milan 1 campus in Cornaredo and Settimo Milanese, with about 2,000 m² of IT space.
11.45 miles Data4: Milan 1 DC2
DC2 is the second data center on Data4's Milan 1 campus in Cornaredo and Settimo Milanese, a two-storey Design X building that shares DC1's layout.
11.45 miles Data4: Milan 1 DC1
DC1 is the first data center on Data4's Milan 1 campus in Cornaredo, a two-storey Design X building with eight data halls.
11.46 miles Data4: Milan 1 DC9
DC9 is a two-storey data center on Data4's Milan 1 campus in Cornaredo and Settimo Milanese, built to DC7's footprint with about 4,000 m² of IT space.
11.49 miles Retelit: Avalon 2
A carrier-neutral colocation facility located in Settimo Milanese that serves as the first physical expansion of Retelit's virtualized Avalon Campus network hub.
11.51 miles Data4: Milan 1 DC11
DC11 is a four-storey data center under construction on the canteen lot of Data4's Milan 1 campus in Settimo Milanese.
11.51 miles Data4: Milan 1 DC12
DC12 is a planned four-level data center on the Cornaredo side of the canteen lot at Data4's Milan 1 campus.
11.56 miles Data4: Milan 1 DC15
DC15 is a four-storey data center under construction on the canteen lot of Data4's Milan 1 campus in Settimo Milanese.
11.56 miles Data4: Milan 1 DC14
DC14 is a planned four-level data center on the Cornaredo side of the canteen lot at Data4's Milan 1 campus.
11.66 miles Equinix Milan ML5
Equinix ML5 is a three-floor IBX in Settimo Milanese, west of Milan, and the first building on Equinix's campus on the former Italtel site.
11.67 miles Equinix: ML6
ML6 is a planned Equinix data center on its Settimo Milanese campus, west of Milan, beside ML5.
11.69 miles Vantage: MXP22
MXP22 is the second of two data centers on Vantage's MXP2 campus in Settimo Milanese, west of Milan.
11.70 miles Vantage: MXP21
Located in Castelletto, about 15 kilometers from the city center, the MXP2 campus will span 10,000 square meters (108,000 square feet) and feature two three-story buildings.
11.72 miles Vaultica: MIL03
Vaultica's MIL03 is a new colocation data center on Via Marisa Bellisario in Settimo Milanese, west of Milan. It is built for enterprise, cloud and AI workloads, with modular data halls and a dedicated office building.
11.76 miles Equinix: ML11x
ML11x is a planned Equinix xScale data center on the former Italtel site in Settimo Milanese, west of Milan.
11.77 miles Equinix: ML7x
Equinix ML7x is the second IBX on Equinix's Settimo Milanese campus, at Via Marisa Bellisario 7 west of Milan, opened in 2024.
11.78 miles Equinix: ML8
ML8 is an Equinix xScale data center on its Settimo Milanese campus, west of Milan, on the same lot as ML7x.
11.82 miles Equinix: ML10x
ML10x is a planned Equinix xScale data center on the former Italtel site in Settimo Milanese, west of Milan.
11.82 miles Equinix: ML9x
ML9x is an Equinix xScale data center under construction on the former Italtel site in Settimo Milanese, west of Milan.
11.93 miles Carrier-Neutral Data CenterInterested in this information?Contact us
11.93 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
11.93 miles Digital Realty: Milan
Digital Realty plans to develop a new data center campus in Abbiategrasso, southwest of Milan, Italy, following the acquisition of two land parcels approximately 1 km apart. The project will begin with an 8MW facility targeted for 2028, with long-term expansion capacity of up to 84MW, forming part of the company’s broader Mediterranean growth strategy.
12.17 miles AtlasEdge Milan
12.29 miles Unidata: Milan
This facility became part of Unidata's infrastructure portfolio following its 100% acquisition of the TWT Group, which was agreed upon in November 2022 and finalized in February 2023.
12.55 miles CyrusOne: MIL2
CyrusOne is expanding its presence in Milan, Italy, with a second data center.
12.83 miles Valley MaxInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
12.96 miles CyrusOne: Milan MIL1
CyrusOne has broken ground on its MIL1 data center at Via Reggio Emilia, 39, Segrate (Milan), Italy, a 27MW, three-storey facility delivering approximately 7,000 sqm (75,345 sq ft) of technical space. Construction began in March 2026, with the first 9MW phase expected online by Q3 2027, followed by phased expansion to full capacity.
13.27 miles Verizon: Milan Sterling
13.62 miles Virtus: Milan 1
STT GDC's Virtus Data Centres is developing its first data center in Italy.
13.96 miles Data4: Vittuone Campus
Data4's planned MIL02 campus in Vittuone, west of Milan, on the former Ceramiche Bardelli site; Italy's environment ministry rejected its environmental assessment in October 2026.
14.09 miles Equinix Milan ML4
Former Telecity data center in Milan's Cascia area that Equinix acquired in January 2016. Equinix closed ML4 in the fourth quarter of 2022.
14.18 miles CoreInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.23 miles North ParkInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.57 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.82 miles AiOnX: Pregnana Innovation Campus
Pregnana Innovation Campus is a planned hyperscale data center development by London-headquartered AiOnX (backed by SWI Group) spanning a 220,000-square-meter industrial parcel in Pregnana Milanese, Italy.
14.89 miles hscale: Milan MXP1
Hscale is planning to build its MXP1 data center in a strategic location in West Milan.
15.29 miles DAMAC: Milan MIL01
DAMAC Digital MIL01 is a planned, purpose-built data center facility developed by UAE-based DAMAC Digital (EDGNEX) on the former 55,000sqm Gefco-Citroën industrial site at Viale dell'Industria in Pregnana Milanese, Italy.
15.44 miles OVH: Milan
European cloud and colocation provider OVHcloud has announced the opening of a new data center in the Milan region of Italy. This new facility is believed to be a former DXC Technology data center.
15.91 miles hscale: MXP2 Bldg3
This facility is part of hscale's MXP2 Campus in Milan.
15.99 miles hscale: MXP2 Bldg2
This facility is part of hscale's MXP2 Campus in Milan.
16.06 miles hscale: MXP2 Bldg1
hscale is planning to build its MXP2 data center campus in a strategic location in North Milan.
16.18 miles Noovle: Santo Stefano Ticino
This facility is operated by Noovle S.p.A., the TIM Group’s cloud and data-center company.
16.26 miles CloudHQ: MXP5
MXP5 is building 5 of five on CloudHQ's planned MXP campus on the former Novaceta industrial site in Magenta, west of Milan.
16.31 miles CloudHQ: MXP4
MXP4 is building 4 of five on CloudHQ's planned MXP campus on the former Novaceta industrial site in Magenta, west of Milan.
16.35 miles CloudHQ: MXP3
MXP3 is building 3 of five on CloudHQ's planned MXP campus on the former Novaceta industrial site in Magenta, west of Milan.
16.40 miles CloudHQ: MXP2
MXP2 is building 2 of five on CloudHQ's planned MXP campus on the former Novaceta industrial site in Magenta, west of Milan.
16.46 miles CloudHQ: MXP1
MXP1 is building 1 of five on CloudHQ's planned MXP campus on the former Novaceta industrial site in Magenta, west of Milan.
16.62 miles Stack: MIL05B
MIL05B is the smaller of two buildings on STACK's MIL05 campus in Vignate, east of Milan.
16.80 miles Stack: MIL05A
MIL05A is the larger of two buildings on STACK's MIL05 campus in Vignate, east of Milan.
17.28 miles Stack: MIL10
MIL10 is a STACK data center campus planned in Liscate, east of Milan.
17.43 miles Stack: MIL06B
MIL06B is the smaller of two buildings on STACK's MIL06 campus in Liscate, east of Milan.
17.49 miles Stack: MIL06A
MIL06A is the larger of two buildings on STACK's MIL06 campus in Liscate, east of Milan.
17.79 miles EdgeConneX: Lodi Campus
This facility is part of the EdgeConneX Campus Italia program, a €3 billion digital infrastructure initiative fast-tracked by the Italian government as a project of national strategic interest.
17.91 miles Stack: MIL09A
MIL09 is STACK's planned single-building data center campus in Melzo, east of Milan, on a former printing plant site.
19.53 miles Khazna: Ferrera Erbognone, Lombardy
Italian energy company Eni is teaming up with Khazna Data Centers, a Middle Eastern firm, to build a new AI data center campus in Ferrera Erbognone, Lombardy, just outside Milan.

Operating Company

Operated by:

STACK Infrastructure is a privately held platform sponsored by IPI Partners that focuses on large scale wholesale capacity and campus development for hyperscale and enterprise customers.

The company was launched in 2019 when IPI combined the remaining Infomart Data Centers assets with selected T5 Data Centers facilities, and industry coverage at launch cited eight data centers across six U.S. markets totaling about 100 MW. In March 2022, IPI unified DigiPlex in the Nordics and SUPERNAP Italia in Milan under the STACK brand to form STACK EMEA, expanding the platform across Europe. STACK has since added international sites, including the first phase of a 56 MW campus in Toronto and its first Australian data center in Melbourne. Core services referenced by the company and trade press include wholesale colocation, build to suit, and powered shell solutions.

STACK Infrastructure History:

  • 2025: Sold its European enterprise colocation business (seven data centers in Stockholm, Oslo, Copenhagen, Milan and Geneva) to Apollo-managed funds; it now operates as Vaultica. STACK EMEA kept its hyperscale campuses.
  • 2023: Opened the first Australian data center in Melbourne on a multi-building campus.
  • 2023: Delivered the first 8 MW phase of a planned 56 MW campus in Toronto.
  • 2022: Rebranded DigiPlex (Nordics) and SUPERNAP Italia (Milan) as STACK EMEA.
  • 2019: IPI Partners launched STACK Infrastructure by combining the three Infomart Data Centers sites with selected T5 Data Centers assets. The company was rebranded as STACK INFRASTRUCTURE
  • 2018: ASB Real Estate Investments sold the three remaining Infomart Data Centers facilities in San Jose, Hillsboro, and Ashburn to IPI Partners; the Dallas Infomart carrier hotel was sold separately to Equinix earlier that year.
  • 2014: Acquired a facility in Ashburn that had been owned by AOL.
  • 2014: ASB Real Estate Fund, a subsidiary of DCI Technology Holdings, merged Infomart with Fortune Data Centers. The combined company was renamed to Infomart Data Centers.
  • 2012: Expanded to Oregon with a building in Hillsboro
  • 2007: John Sheputis purchased first Fortune Data Center in San Jose, CA, backed by ASB Real Estate
  • 2006: ASB Real Estate purchased Infomart Dallas building
  • 2006: Fortune Founded as Fortune Data Centers
0
Facilities
0
Markets

News See all

Read Milan Data Center Protest Draws Over 1,000 As Lombardy Plans Stricter Law
More than 1,000 people gathered in Piazza della Scala in Milan on Oct. 10 to oppose new data center construction in Lombardy, [Il Giorno](https://www.ilgiorno.it/milano/cronaca/data-center-protesta...

Milan Data Center Protest Draws Over 1,000 As Lombardy Plans Stricter Law

November 10, 2026 Milan

More than 1,000 people gathered in Piazza della Scala in Milan on Oct. 10 to oppose new data center construction in Lombardy, Il Giorno reported. The rally was the first national demonstration called by the National Network of Stop Data Center Committees. Organizers want the national government...

Read more
Read Clayco and Kiewit Top Out First Building at Project Jupiter in New Mexico
Clayco and Kiewit New Mexico Co. topped out the 855,000-square-foot first building at Project Jupiter, a data center campus in Doña Ana County, [New Mexico](https://baxtel.com/regions/new-mexico). ...

Clayco and Kiewit Top Out First Building at Project Jupiter in New Mexico

October 27, 2026 STACK INFRASTRUCTURE

Clayco and Kiewit New Mexico Co. topped out the 855,000-square-foot first building at Project Jupiter, a data center campus in Doña Ana County, New Mexico. The contractors placed the final structural beam atop the building, completing its primary structural framework, Clayco announced on October...

Read more
Read Greenfield And Finsbury Infrastructure To Invest €360M In Milan Data Center
UK infrastructure developer Greenfield and Finsbury Infrastructure plan to invest up to €360 million ($418m) to develop a 36MW data center east of Milan, Italy. Greenfield has already secured 80MW ...

Greenfield And Finsbury Infrastructure To Invest €360M In Milan Data Center

September 08, 2026 Milan

UK infrastructure developer Greenfield and Finsbury Infrastructure plan to invest up to €360 million ($418m) to develop a 36MW data center east of Milan, Italy. Greenfield has already secured 80MW of power capacity for the site, which will support AI, cloud, and enterprise workloads while...

Read more
Read Magnora Secures Milan-Area Land for 30 MW Data Center, Its Second Italy Project
Magnora Secures Milan-Area Land for 30 MW Data Center, Its Second Italy Project

Magnora Secures Milan-Area Land for 30 MW Data Center, Its Second Italy Project

May 18, 2026 Magnora

Norwegian renewables and data center developer Magnora ASA has secured land for a new 30 MW data center project in the Milan area, the company announced on Monday. The wholly owned project is Magnora's second in Italy and brings its data center development portfolio to 585 MW gross and 460 MW...

Read more
Read Stack Infrastructure breaks ground on 60MW data center expansion in California
 Stack Infrastructure breaks ground on 60MW data center expansion in California

Stack Infrastructure breaks ground on 60MW data center expansion in California

March 29, 2024 STACK INFRASTRUCTURE

IPI-owned company Stack Infrastructure announced this week that it has broken ground on a 60MW data center expansion in Silicon Valley, California. The company plans to build two data centers to add 60MW of capacity, an advanced manufacturing facility, and a parking structure, spanning 19 acres....

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.