|
0.10 miles
|
Echelon: LIN10 Bldg-1
|
LIN10 Bldg-1 is the first building on Echelon's LIN10 campus, a converted former printing plant at Via della Costa 2, Treviglio, near Milan.
|
|
4.74 miles
|
Vitali: Arcene Innovation Hub
|
The Innovation Hub is a planned 181,000-square-meter data center campus developed by the Vitali Group on the former Tre Cantoni quarry site in Arcene, Northern Italy.
|
|
10.30 miles
|
Plaza AlphaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
10.35 miles
|
Park BetaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
12.76 miles
|
North ValleyInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
12.83 miles
|
QTS: Vimercate, Milan
|
QTS Data Center Holdings is eyeing a massive three-building campus in Vimercate, located just 25 kilometers north of Milan.
|
|
13.32 miles
|
Aruba: IT3 DC-B
|
|
|
13.34 miles
|
Aruba: IT3 DC-D
|
DC-D is the fourth building on Aruba's IT3 campus in Ponte San Pietro, under construction in the last unconverted Legler mill shed (about 15,000 m²) at the south-west of the site.
|
|
13.49 miles
|
Aruba: IT3 DC-C
|
|
|
13.55 miles
|
Aruba: IT3 DC-A
|
First data center on Aruba's IT3 campus in Ponte San Pietro: a converted Legler mill shed at the north end of the site with 10 data rooms, groundwater cooling and rooftop solar.
|
|
13.68 miles
|
Aruba: IT3 DC-E
|
DC-E was a fifth data center building that Aruba planned for its IT3 campus in Ponte San Pietro. Aruba dropped it, and the campus's approved final layout has four data center buildings.
|
|
14.01 miles
|
EdgeConneX: Lodi Campus
|
This facility is part of the EdgeConneX Campus Italia program, a €3 billion digital infrastructure initiative fast-tracked by the Italian government as a project of national strategic interest.
|
|
14.50 miles
|
CyrusOne: Milan MIL1
|
CyrusOne has broken ground on its MIL1 data center at Via Reggio Emilia, 39, Segrate (Milan), Italy, a 27MW, three-storey facility delivering approximately 7,000 sqm (75,345 sq ft) of technical space. Construction began in March 2026, with the first 9MW phase expected online by Q3 2027, followed by phased expansion to full capacity.
|
|
14.74 miles
|
CyrusOne: MIL2
|
CyrusOne is expanding its presence in Milan, Italy, with a second data center.
|
|
15.51 miles
|
Equinix Milan ML4
|
The site was a Telecity managed datacenter before Equinix acquired Telecity in July 2016.
|
|
15.85 miles
|
NTT: Milan
|
NTT Data has acquired 53 acres of land to develop a data center near Milan, Italy.
|
|
15.98 miles
|
MOMIT Milan
|
|
|
16.46 miles
|
Vantage: MXP12
|
This facility is part of Vantage's MXP1 campus in Milan, Italy.
|
|
16.47 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
16.47 miles
|
Vantage: MXP11
|
Once fully developed, the MXP1 campus will offer 517,000 square foot (48,000 square meters) of data center space with 300W/SF (3.2kW/M²) average density.
|
|
16.55 miles
|
Vantage: MXP14
|
This facility is part of Vantage's MXP1 campus in Milan, Italy.
|
|
16.55 miles
|
Vantage: MXP13
|
This facility is part of Vantage's MXP1 campus in Milan, Italy.
|
|
18.45 miles
|
Poste Italiane: Lombardy
|
Italian state-controlled operator Poste Italiane is developing a large-scale AI data center in Lombardy for model training and inference, having already secured both the land and power supplier.
|
|
18.45 miles
|
Magnora: Milan 2
|
Magnora secured industrial-zoned land near Milan for a new data center development, with grid studies underway and a potential sale milestone in 2027.
|
|
18.50 miles
|
EdgeConneX: Milan 02
|
This facility is part of the EdgeConneX Campus Italia program, a €3 billion digital infrastructure initiative fast-tracked by the Italian government as a project of national strategic interest.
|
|
18.50 miles
|
K2: Milan Campus
|
Malaysian conglomerate Kuok Group, through its digital infrastructure arm K2 Strategic, is planning a massive €5.3 billion ($6 billion) investment to develop and manage a hyperscale data center campus on the southern outskirts of Milan.
|
|
18.64 miles
|
Unidata: Milan
|
This facility became part of Unidata's infrastructure portfolio following its 100% acquisition of the TWT Group, which was agreed upon in November 2022 and finalized in February 2023.
|
|
18.72 miles
|
AtlasEdge Milan
|
|