Virtus: Milan 1

Under Construction
New facility under construction
Operated by:

Virtus: Milan 1

Year Planned: 2027
PUE: 1.3
Lot Size: 18 acres

STT GDC's Virtus Data Centres is developing its first data center in Italy. Located in Cornaredo, west of Milan, the facility will be developed on a 71,000 sqm (764,235 sq ft) brownfield site, which has zoning in place for a 44,000 sqm (473,610 sq ft) facility. The facility is expected to be ready for service in 2027.

› Eco-efficient, optimised design for fully flexible bespoke customer solutions
› Carrier neutral, with access to a wide choice of Tier I and Tier II carriers
› On-ramp access to all major public cloud platforms
› Over 44,00m2 of net technical space
› Design PUE of less than 1.3
› Built to Uptime Tier III standard
› Centralized N+N online UPS plant
› Variety of of power resilience options; N, N+1 and N+N
› N+1 LV DCC generators with 48h run time at full load
› Priority fuel contracts

Map and Nearby Locations

SP130
VIRTUS Data Centres Ltd Sites
Nearby Facilities

Virtus: Milan 1 Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Virtus: Milan 1

Distance Site About
1.20 miles AiOnX: Pregnana Innovation Campus
Pregnana Innovation Campus is a planned hyperscale data center development by London-headquartered AiOnX (backed by SWI Group) spanning a 220,000-square-meter industrial parcel in Pregnana Milanese, Italy.
1.67 miles DAMAC: Milan MIL01
DAMAC Digital MIL01 is a planned, purpose-built data center facility developed by UAE-based DAMAC Digital (EDGNEX) on the former 55,000sqm Gefco-Citroën industrial site at Viale dell'Industria in Pregnana Milanese, Italy.
1.69 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
1.70 miles Carrier-Neutral Data CenterInterested in this information?Contact us
1.85 miles Equinix: ML7x
Equinix ML7x is the second IBX on Equinix's Settimo Milanese campus, at Via Marisa Bellisario 7 west of Milan, opened in 2024.
1.91 miles Vaultica: MIL03
Vaultica's MIL03 is a new colocation data center on Via Marisa Bellisario in Settimo Milanese, west of Milan. It is built for enterprise, cloud and AI workloads, with modular data halls and a dedicated office building.
1.92 miles Vantage: MXP21
Located in Castelletto, about 15 kilometers from the city center, the MXP2 campus will span 10,000 square meters (108,000 square feet) and feature two three-story buildings.
1.93 miles Vantage: MXP22
This facility is part of Vantage's MXP2 campus in Milan.
1.96 miles Equinix Milan ML5
Equinix ML5 is a three-floor IBX at Via Reiss Romoli 40 in Settimo Milanese, the anchor building of Equinix's Settimo Milanese campus next to Via Caldera, Milan's most network-dense location.
2.06 miles Data4: Milan 1 DC14
DC14 is a planned four-level data center on the Cornaredo side of the canteen lot at Data4's Milan 1 campus.
2.06 miles Data4: Milan 1 DC15
DC15 is a four-storey data center under construction on the canteen lot of Data4's Milan 1 campus in Settimo Milanese.
2.11 miles Data4: Milan 1 DC11
DC11 is a four-storey data center under construction on the canteen lot of Data4's Milan 1 campus in Settimo Milanese.
2.11 miles Data4: Milan 1 DC12
DC12 is a planned four-level data center on the Cornaredo side of the canteen lot at Data4's Milan 1 campus.
2.16 miles Data4: Milan 1 DC9
DC9 is a two-storey data center on Data4's Milan 1 campus in Cornaredo and Settimo Milanese, built to DC7's footprint with about 4,000 m² of IT space.
2.17 miles Data4: Milan 1 DC2
DC2 is the second data center on Data4's Milan 1 campus in Cornaredo and Settimo Milanese, a two-storey Design X building that shares DC1's layout.
2.17 miles Data4: Milan 1 DC10
DC10 is a Design Y' data center on Data4's Milan 1 campus in Cornaredo and Settimo Milanese, with about 2,000 m² of IT space.
2.17 miles Data4: Milan 1 DC1
DC1 is the first data center on Data4's Milan 1 campus in Cornaredo, a two-storey Design X building with eight data halls.
2.18 miles Data4: Milan 1 DC8.1
DC8.1 is one of two mirrored two-storey data centers on the Verdi-Tower lot of Data4's Milan 1 campus in Settimo Milanese, under construction since 2024.
2.19 miles Central StationInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
2.21 miles Data4: Milan 1 DC7
DC7 is the seventh data center on Data4's Milan 1 campus in Cornaredo and Settimo Milanese, a two-storey Design L' building with about 4,000 m² of IT space.
2.21 miles Data4: Milan 1 DC8.2
DC8.2 is one of two mirrored two-storey data centers on the Verdi-Tower lot of Data4's Milan 1 campus in Settimo Milanese.
2.21 miles Data4: Milan 1 DC6
DC6 is the sixth data center on Data4's Milan 1 campus in Cornaredo and Settimo Milanese, a Design Y' building with about 2,000 m² of IT space.
2.22 miles Data4: Milan 1 DC5
DC5 is the fifth data center on Data4's Milan 1 campus in Cornaredo and Settimo Milanese, a Design Y' building with about 2,000 m² of IT space.
2.22 miles Data4: Milan 1 DC4
DC4 is the fourth data center on Data4's Milan 1 campus in Cornaredo and Settimo Milanese, a Design Y building of about 5,000 m² with 2,000 m² of IT space.
2.22 miles Data4: Milan 1 DC3
DC3 is the third data center on Data4's Milan 1 campus in Cornaredo, a two-storey Design X building that shares DC1's layout.
2.41 miles hscale: Milan MXP1
Hscale is planning to build its MXP1 data center in a strategic location in West Milan.
2.67 miles Retelit: Avalon 2
A carrier-neutral colocation facility located in Settimo Milanese that serves as the first physical expansion of Retelit's virtualized Avalon Campus network hub.
2.82 miles Verizon: Milan Sterling
2.94 miles BT Italia: Milan BF1
BT Italia has been operating its own data centers since 2001.
3.23 miles Data4: Vittuone Campus
French data center operator Data4 is reportedly spending €500 million ($535m) on a new data center campus in Milan.
4.26 miles CDLAN C21 Milan
4.38 miles GTT Milan
4.38 miles Infracom Milan
4.42 miles Retelit: Avalon 1
A carrier-neutral network hub and colocation facility located within the Caldera Business Park in Milan, serving as the core connectivity point for the virtualized Avalon Campus.
5.15 miles Level3 Milan (Via S Giusto)
5.48 miles Noovle: Santo Stefano Ticino
This facility is operated by Noovle S.p.A., the TIM Group’s cloud and data-center company.
5.61 miles Retelit: Corsico DC2
A high-density data center facility in Milan Corsico built on a repurposed industrial site to support artificial intelligence workloads and regional heat recycling.
5.62 miles Retelit: Corsico DC1
A high-density data center facility in Milan Corsico built on a repurposed industrial site to support artificial intelligence workloads and regional heat recycling.
5.72 miles Keppel Milan
6.08 miles Retelit: Avalon 3
A carrier-neutral, Tier IV-designed colocation data center within Retelit's virtualized Milan campus.
6.98 miles hscale: MXP2 Bldg3
This facility is part of hscale's MXP2 Campus in Milan.
7.00 miles hscale: MXP2 Bldg2
This facility is part of hscale's MXP2 Campus in Milan.
7.03 miles hscale: MXP2 Bldg1
hscale is planning to build its MXP2 data center campus in a strategic location in North Milan.
7.14 miles Equinix Milan ML2
The site was a Telecity managed datacenter before Equinix acquired Telecity in July 2016.
7.40 miles CloudHQ: MXP4
This facility will be part of CloudHQ's MXP Campus in Milan, Italy.
7.41 miles CloudHQ: MXP5
This facility will be part of CloudHQ's MXP Campus in Milan, Italy.
7.52 miles CloudHQ: MXP1
This facility is the first building on CloudHQ's MXP Campus in Milan, Italy.
7.53 miles CloudHQ: MXP2
This facility will be part of CloudHQ's MXP Campus in Milan, Italy.
7.56 miles CloudHQ: MXP3
This facility will be part of CloudHQ's MXP Campus in Milan, Italy.
7.63 miles Level3 Milan (Via Tortona)
7.69 miles AtlasEdge Milan
7.76 miles Unidata: Milan
This facility became part of Unidata's infrastructure portfolio following its 100% acquisition of the TWT Group, which was agreed upon in November 2022 and finalized in February 2023.
8.55 miles K2: Milan Campus
Malaysian conglomerate Kuok Group, through its digital infrastructure arm K2 Strategic, is planning a massive €5.3 billion ($6 billion) investment to develop and manage a hyperscale data center campus on the southern outskirts of Milan.
8.55 miles EdgeConneX: Milan 02
This facility is part of the EdgeConneX Campus Italia program, a €3 billion digital infrastructure initiative fast-tracked by the Italian government as a project of national strategic interest.
8.60 miles Poste Italiane: Lombardy
Italian state-controlled operator Poste Italiane is developing a large-scale AI data center in Lombardy for model training and inference, having already secured both the land and power supplier.
8.60 miles Magnora: Milan 2
Magnora secured industrial-zoned land near Milan for a new data center development, with grid studies underway and a potential sale milestone in 2027.
8.62 miles Digital Realty: Milan
Digital Realty plans to develop a new data center campus in Abbiategrasso, southwest of Milan, Italy, following the acquisition of two land parcels approximately 1 km apart. The project will begin with an 8MW facility targeted for 2028, with long-term expansion capacity of up to 84MW, forming part of the company’s broader Mediterranean growth strategy.
10.88 miles Equinix Milan ML4
The site was a Telecity managed datacenter before Equinix acquired Telecity in July 2016.
10.99 miles Noovie: Rozzano DC4
11.08 miles MOMIT Milan
11.73 miles Equinix Milan ML3
Equinix opened its second facility in Milan, located in Basiglio, in the first quarter of 2009. Prior to Equinix's acquisition of Telecity in July 2016, this site operated as a Telecity-managed data center.
11.88 miles CyrusOne: MIL2
CyrusOne is expanding its presence in Milan, Italy, with a second data center.
12.03 miles CyrusOne: Milan MIL1
CyrusOne has broken ground on its MIL1 data center at Via Reggio Emilia, 39, Segrate (Milan), Italy, a 27MW, three-storey facility delivering approximately 7,000 sqm (75,345 sq ft) of technical space. Construction began in March 2026, with the first 9MW phase expected online by Q3 2027, followed by phased expansion to full capacity.
12.63 miles Compass Milan
13.07 miles EdgeConneX: Milan 01
This facility is part of the EdgeConneX Campus Italia program, a €3 billion digital infrastructure initiative fast-tracked by the Italian government as a project of national strategic interest.
13.58 miles Apto: Lacchiarella
Apto, a European firm, plans a massive €3 billion ($3.4bn) data center campus in Lacchiarella, near Milan, Italy.
14.34 miles East CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.63 miles Rai Way: Milan
Rai Way's Siziano Campus is located in Milan, Italy.
14.71 miles Stack: MIL01B
STACK's MIL01B is the second building on the MIL01 campus in Siziano, south of Milan, with two independent data halls. SUPERNAP Italia completed it in 2021 and it became STACK in 2022.
14.80 miles Vaultica: Siziano MIL01
Vaultica sells carrier-neutral enterprise colocation on STACK's MIL01 campus in Siziano, south of Milan. The business was part of STACK until Apollo-managed funds bought it in 2025.
14.80 miles Stack: MIL01A
STACK's MIL01A is the first building on the MIL01 campus in Siziano, south of Milan. SUPERNAP Italia opened it in 2016 and it became STACK in 2022. Vaultica also sells colocation on the campus.
14.83 miles STACK: MIL02A
Stack Infrastructure's MIL02A data center sits adjacent to the MIL01 campus and is served by 100% renewable power. This is Stack's third data center in Siziano.
14.84 miles Stack: MIL01C
STACK's MIL01C is the smallest of three buildings on the MIL01 campus in Siziano, south of Milan, with solar panels on its roof. STACK built it from 2023.
15.29 miles Stack: MIL03A
15.40 miles Stack: MIL08
Stack Infrastructure's MIL08 Campus is a stone’s throw from MIL02A and the MIL01 campus and will be served by 100% renewable power.
17.17 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.25 miles Vantage: MXP14
This facility is part of Vantage's MXP1 campus in Milan, Italy.
17.30 miles Vantage: MXP12
This facility is part of Vantage's MXP1 campus in Milan, Italy.
17.30 miles Vantage: MXP13
This facility is part of Vantage's MXP1 campus in Milan, Italy.
17.33 miles Vantage: MXP11
Once fully developed, the MXP1 campus will offer 517,000 square foot (48,000 square meters) of data center space with 300W/SF (3.2kW/M²) average density.
17.74 miles NTT: Milan
NTT Data has acquired 53 acres of land to develop a data center near Milan, Italy.
17.95 miles GSM: Certosa di Pavia
Spearheaded by real estate developer GSM, the proposed 646,000 sq ft complex would consist of three buildings situated near the town’s historic 14th-century monastery.
18.42 miles South ParkInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.47 miles Central ParkInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.66 miles QTS: Vimercate, Milan
QTS Data Center Holdings is eyeing a massive three-building campus in Vimercate, located just 25 kilometers north of Milan.
19.21 miles Center PrimeInterested in this information?Contact us
19.31 miles West TowerInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us

Operating Company

Operated by:

VIRTUS Data Centres, the one of the UK’s fastest growing data centre provider, owns, designs, builds and operates the country’s most efficient and flexible data centres.

0
Facilities
0
Markets

News See all

Read Virtus Raises £2.45bn to Fund Data Center Expansion
European data center operator Virtus Data Centres has secured a £2.45 billion ($3.25bn) financing package from a consortium of 13 banks. BNP Paribas, Crédit Agricole CIB, Société Générale, and Stan...

Virtus Raises £2.45bn to Fund Data Center Expansion

September 28, 2026 VIRTUS Data Centres Ltd

European data center operator Virtus Data Centres has secured a £2.45 billion ($3.25bn) financing package from a consortium of 13 banks. BNP Paribas, Crédit Agricole CIB, Société Générale, and Standard Chartered Bank acted as coordinators and lead arrangers. The funding will support the...

Read more
Read Greenfield And Finsbury Infrastructure To Invest €360M In Milan Data Center
UK infrastructure developer Greenfield and Finsbury Infrastructure plan to invest up to €360 million ($418m) to develop a 36MW data center east of Milan, Italy. Greenfield has already secured 80MW ...

Greenfield And Finsbury Infrastructure To Invest €360M In Milan Data Center

September 08, 2026 Milan

UK infrastructure developer Greenfield and Finsbury Infrastructure plan to invest up to €360 million ($418m) to develop a 36MW data center east of Milan, Italy. Greenfield has already secured 80MW of power capacity for the site, which will support AI, cloud, and enterprise workloads while...

Read more
Read Virtus Plans 32.5MW Data Center in Slough, UK
Virtus Data Centres is planning a new data center in Slough, west of London. The company this week announced London19, a 32.5MW facility at the Slough Trading Estate. Planning permission has alread...

Virtus Plans 32.5MW Data Center in Slough, UK

June 30, 2026 VIRTUS Data Centres Ltd

Virtus Data Centres is planning a new data center in Slough, west of London. The company this week announced London19, a 32.5MW facility at the Slough Trading Estate. Planning permission has already been secured through the estate's Simplified Planning Zone, with Segro set to develop the powered...

Read more
Read Magnora Secures Milan-Area Land for 30 MW Data Center, Its Second Italy Project
Magnora Secures Milan-Area Land for 30 MW Data Center, Its Second Italy Project

Magnora Secures Milan-Area Land for 30 MW Data Center, Its Second Italy Project

May 18, 2026 Magnora

Norwegian renewables and data center developer Magnora ASA has secured land for a new 30 MW data center project in the Milan area, the company announced on Monday. The wholly owned project is Magnora's second in Italy and brings its data center development portfolio to 585 MW gross and 460 MW...

Read more
Read Virtus to build 300MW data facility outside Berlin
Virtus to build 300MW data facility outside Berlin

Virtus to build 300MW data facility outside Berlin

September 05, 2023 VIRTUS Data Centres Ltd

Virtus Data Centers plans to construct a new 300MW campus outside Berlin in Germany. This week, the company, a division of STT GDC, announced the Wustermark Megacampus in Brandenberg, west of the capital. The first phase of the campus in the municipality of Wustermark will encompass 3.7 million...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?