QTS: New Albany 1 DC1
QTS New Albany 1 is a two-building data center campus in New Albany, Ohio. The first building of the campus is located at 1225 Beech Rd SW, New Albany, OH.
QTS Data Centers is a privately held data center company owned by funds managed by Blackstone, with corporate headquarters in Overland Park, Kansas. It provides colocation, custom data center and managed services, along with carrier-neutral connectivity across its platform.
QTS operates sites in the United States and in the Netherlands. The company expanded its footprint with acquisitions in Chicago and Princeton in 2014, added government and managed hosting capabilities with the Carpathia acquisition in 2015, and entered the Netherlands market in 2019. QTS became a public company in 2013 and was taken private in 2021.
QTS New Albany 1 is a two-building data center campus in New Albany, Ohio. The first building of the campus is located at 1225 Beech Rd SW, New Albany, OH.
The Bessemer City Council has officially cleared the way for "Project Marvel," a massive 1,600-acre data center campus proposed by Logistic Land Investments LLC.
New Albany 2 DC1 is the first of two buildings on the QTS New Albany 2 campus, at 785 Beech Rd SW, Pataskala (Etna Township), Ohio.
QTS's hyperscale data center campus project in the Industriegebiet Westfalen in Lippetal, beside the A2 Hamm-Uentrop junction.
QTS Richmond 4 (RIC4) Campus is a major data center expansion project by QTS, in eastern Henrico County (Sandston, VA), within the White Oak Technology Park area.
QTS New Albany 1 is a two-building data center campus in New Albany, Ohio. The second building, New Albany 1 DC2, of the campus is located at 1275 Beech Rd SW, New Albany, OH.
Hillsboro 2 DC2 is the second of four buildings on QTS's Hillsboro 2 campus, at 4425 NE Huffman St in Hillsboro, Oregon.
Located in Blyth, Northumberland, this facility is situated on the QTS Data Centers' Cambois campus.
QTS is planning a $10 billion, 1,300-acre hyperscale data center campus in Clinton, Iowa.
DC4 is a two-story data center on QTS's Irving campus in Las Colinas, finished as a shell in 2024 and fitted out for Microsoft in 2025.
Located in Blyth, Northumberland, this facility is situated on the QTS Data Centers' Cambois campus.
Located in Blyth, Northumberland, this facility is situated on the QTS Data Centers' Cambois campus.
Located in Blyth, Northumberland, this facility is situated on the QTS Data Centers' Cambois campus.
QTS is developing a 413,726-square-foot, two-story data center with office and shell data hall space on its South Dallas DFW2 campus near Wilmer, in southern Dallas County.
QTS Data Centers is planning a data center campus on about 900 acres west of Big Spring in Howard County, Texas. The plan calls for eight buildings.
QTS has expanded its Richmond I campus on Portugee Road with three two-story, 155,175-square-foot data center buildings, totaling 465,525 square feet of space, and this building is one of them.
QTS massive data center in Richmon sits on 110 acres with an additional 100 acres available for future development. There are 3 building on the campus with a total potential floor space of 550,000 square feet
QTS Realty Trust is continuing its data center expansion at its Richmond Mega Data Center campus in Henrico after acquiring another 200 acres at the site. The company said that it planned to build up to 1.5 million square feet (140,000 sq m) of additional capacity.
Calatorao 8 (DC8) is one of eight buildings on QTS's Proyecto Rhodes campus beside the A-2 motorway at Calatorao, Zaragoza province.
DC2 is the second of two data centers QTS plans on its DFW3 tract on East Belt Line Road in Lancaster, Texas: a building of about 502,750 sq ft east of DC1, beside the site's planned substation. Construction has not started.
Calatorao 2 (DC2) is one of eight buildings on QTS's Proyecto Rhodes campus beside the A-2 motorway at Calatorao, Zaragoza province.
DC1 is the first building pad on QTS's Greene Road tract in Lancaster, one of five two-story data centers of about 240,600 sq ft each on the Project Labrador zoning plan.
Calatorao 3 (DC3) is one of eight buildings on QTS's Proyecto Rhodes campus beside the A-2 motorway at Calatorao, Zaragoza province.
Calatorao 4 (DC4) is one of eight buildings on QTS's Proyecto Rhodes campus beside the A-2 motorway at Calatorao, Zaragoza province.
Calatorao 5 (DC5) is one of eight buildings on QTS's Proyecto Rhodes campus beside the A-2 motorway at Calatorao, Zaragoza province.
Calatorao 6 (DC6) is one of eight buildings on QTS's Proyecto Rhodes campus beside the A-2 motorway at Calatorao, Zaragoza province.
Calatorao 7 (DC7) is one of eight buildings on QTS's Proyecto Rhodes campus beside the A-2 motorway at Calatorao, Zaragoza province.
Calatorao 1 (DC1) is the first of eight buildings on QTS's Proyecto Rhodes campus beside the A-2 motorway at Calatorao, Zaragoza province, where site works began in October 2026.
FTW1-DC2 is the second building on QTS's Fort Worth campus near AllianceTexas, a two-story, $220 million data center completed in 2026.
A judicial ruling voided the massive Digital Gateway data center project, but the developers and county are appealing the decision, leaving the 1.7-gigawatt plan in doubt.
QTS's first Dallas-area data center occupies the former Maxim semiconductor plant in Irving, Texas, and holds the campus's DC1 and DC2 data halls.
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
QTS Data Centers is developing a nine-building hyperscale campus on roughly 400 acres near Hands Mill Highway and Campbell Road in the Clover area of York County, north of Rock Hill and just south of Lake Wylie.
FTW1-DC1 is the original building on QTS's Fort Worth campus near AllianceTexas, a former Health Care Service Corporation data center that QTS bought in 2017.
DC13 is one of four data center buildings QTS plans for ATL2 East, the expansion of its Fayetteville, Georgia campus west of Veterans Parkway.
QTS is building a seven-building data center campus on the former Van Wert Mega Site, north of U.S. Route 30 in Van Wert County, Ohio.
The proposed expansion in East Windsor involves a $600 million investment by QTS Data Centers to build a second, state-of-the-art facility on its existing Princeton-Hightstown Road campus.
The QTS Data Center in Colorado Springs encompasses a 249,958-square-foot facility situated on a 21-acre site
DC11 is one of four data center buildings QTS plans for ATL2 East, the expansion of its Fayetteville, Georgia campus west of Veterans Parkway.
DC12 is one of four data center buildings QTS plans for ATL2 East, the expansion of its Fayetteville, Georgia campus west of Veterans Parkway.
DC14 is one of four data center buildings QTS plans for ATL2 East, the expansion of its Fayetteville, Georgia campus west of Veterans Parkway.
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
QTS data centers' Project Granite is located on a 37.5-acre site at 1010 West Marietta St. NW.
QTS is developing a ten-building data center campus in the north of England. The development is expected to be completed by 2035
QTS is adding a two-story, $300 million data hall expansion to FTW1-DC1 on its Fort Worth campus near AllianceTexas.
DC2 is a two-story, 470,000 sq ft data center on QTS's South Dallas DFW2 campus near Wilmer in southern Dallas County, with data center space on both floors and a small administration area.
This facility is part of QTS Kearneysville Campus in West Virginia.
DC6 is a two-story, 363,500 sq ft data center with office and shell data hall space on QTS's South Dallas DFW2 campus near Wilmer in southern Dallas County.
DC5 is a two-story, 363,500 sq ft data center with office and shell data hall space on QTS's South Dallas DFW2 campus near Wilmer in southern Dallas County.
DFW2 Expansion holds the fourth planned building on QTS's 113.5-acre Dallas II tract between Sunrise Road and Mason Road in Wilmer and Lancaster, Texas. QTS has not filed it with the state.
Located in Blyth, Northumberland, this facility is situated on the QTS Data Centers' Cambois campus.
Augusta 3 is the third of six planned two-story buildings on QTS's Augusta campus (Project Eisenhower) off Gordon Highway in Augusta, Georgia, adjacent to Fort Eisenhower.
Buildings B to E on QTS's Greene Road tract in Lancaster, Texas, from the five-building Project Labrador zoning plan.
The company has leased a substantial 756,000 square foot (70,234 sqm) facility, identified as Building B1, within the New Century Commerce Center (NCCC) in New Century, Kansas.
ASH3 DC1 is the first of two Freedom Standard buildings on QTS's Ashburn 3 (Shellhorn) campus; completed in March 2021.
Located in Blyth, Northumberland, this facility is situated on the QTS Data Centers' Cambois campus.
Located in Blyth, Northumberland, this facility is situated on the QTS Data Centers' Cambois campus.
Located in Blyth, Northumberland, this facility is situated on the QTS Data Centers' Cambois campus.
Located in Blyth, Northumberland, this facility is situated on the QTS data centers' Cambois campus.
The QTS Kearneysville data center campus is slated for a 300-acre property strategically split between Berkeley and Jefferson Counties in West Virginia.
QTS Suwanee 1 DC1 is a 385,000 sq. ft. data center and office building at 300 Satellite Blvd NW, the first of two buildings on the QTS Suwanee 1 campus in the north suburbs of Atlanta.
This facility is part of the QTS Richmond IV Campus in Virginia.
This facility is part of the QTS Richmond IV Campus in Virginia.
Small carrier-neutral colocation facility in south Wichita serving regional enterprise and aerospace customers. Hardened concrete block and brick construction with 9,400 sq ft of data center footprint and 2,600 sq ft of raised floor.
QTS Data Centers proposed a large data center campus in the Town of Vienna, north of Madison, Wisconsin, in 2025. It withdrew in 2026 and chose a site in Iowa.
Later phases of QTS Data Centers' proposed campus in the Town of Vienna, Wisconsin, withdrawn in 2026 when QTS chose a site in Iowa.
QTS is expanding its South Dallas campus with DC7, a new two-story data center building planned near Wilmer in southern Dallas County.
Augusta 2 is the second of six planned two-story buildings on QTS's Augusta campus (Project Eisenhower) off Gordon Highway in Augusta, Georgia, adjacent to Fort Eisenhower.
QTS is developing a 612-acre data center campus along 76th Avenue SW within the Big Cedar Industrial Center.
QTS Suwanee 1 DC2 is a 376,900 sq. ft. former Hewlett-Packard data center at 120 Satellite Blvd NW that QTS bought from DXC Technology in November 2022.
PHX2 DC1 is the first of five data center buildings on the QTS Phoenix 2 campus, at 1200 N 40th Street in east Phoenix, Arizona.
PHX2 DC4 is the fourth of five data center buildings on the QTS Phoenix 2 campus, at 1450 N 40th Street in east Phoenix, Arizona.
ASH2 DC1 is the first of two bookend buildings on the QTS Ashburn 2 Lockridge campus, at 44675 Quality Tech Lane in Sterling, Virginia.
PHX3 DC1 is the first of 16 planned buildings on QTS's Phoenix 3 campus in Glendale, Arizona, at 17408 W Camelback Rd (Litchfield Park mailing address).
Glendale Expansion carries the later buildings of QTS's planned 16-building Phoenix 3 campus in Glendale, Arizona, beyond PHX3 DC1.
Augusta 1 is the first of six planned two-story buildings on QTS's Augusta campus (Project Eisenhower) off Gordon Highway in Augusta, Georgia, adjacent to Fort Eisenhower. QTS expects to complete it in spring 2028.
Augusta 5 is the fifth of six planned two-story buildings on QTS's Augusta campus (Project Eisenhower) off Gordon Highway in Augusta, Georgia, adjacent to Fort Eisenhower.
Suwanee 1 Expansion holds the future capacity QTS plans for its Suwanee 1 campus in Suwanee, Georgia, beyond the two existing buildings.
Hillsboro 3 DC1 is the first of two planned buildings on QTS's Hillsboro 3 campus, at 6220 NE Pubols St in north Hillsboro, Oregon.
Hillsboro 3 DC2 is the second of two planned buildings on QTS's Hillsboro 3 campus, at 6185 NE Schaaf St in north Hillsboro, Oregon.
Hillsboro 1 DC1 is QTS's multi-tenant colocation data center at 4951 NE Huffman St in Hillsboro, Oregon, opened in October 2020.
A massive 970,000 sqft data center is one of the largest in the world.
The campus, also known as QTS Aurora, on 80 acres, will consist of four buildings and is projected to ramp up to capacity over 10 years.
PHX2 DC2 is the second of five data center buildings on the QTS Phoenix 2 campus, at 1250 N 40th Street in east Phoenix, Arizona.
QTS is expanding its data center campus in Princeton, New Jersey. The first phase of the project was topped off in November, 2024.
ASH2 DC2 is the second of two bookend buildings on the QTS Ashburn 2 Lockridge campus, at 44655 Quality Tech Lane in Sterling, Virginia.
Located in the Green Data Port of Eemshaven, home to the largest wind park on Dutch soil.
Dallas VI is QTS's tract of about 75 acres at 401 Lavender Road in Wilmer, Texas, planned for three data center buildings of 285,000 to 378,100 sq ft. QTS has not filed any of them with the state.
DC1 is the first building on QTS's South Dallas DFW2 campus near Wilmer in southern Dallas County, a two-story, 413,726 sq ft data center with office and shell data hall space.
QTS’s proposed Project Blue Hole campus in Blakely, Georgia, is an early-stage hyperscale development off Martha Berry Highway that could reach 12 million sq ft across nine buildings with three substations, targeting full buildout by 2035
DC1 is the first of two data centers QTS plans on its 98.6-acre DFW3 tract on East Belt Line Road in Lancaster, Texas: a building of about 502,750 sq ft on the west side of the site. Construction has not started.
QTS plans a two-building data center campus in the western employment area of Jokela, Tuusula, on a 16.8-hectare site along Vallunlenkki.
Dallas III is a planned QTS data center of about 336,500 sq ft on 53.8 acres east of Mason Road at Belt Line Road in Wilmer, Texas, on the DFW2 plat. QTS has not filed it with the state.
Dallas IV is QTS's 131-acre tract at 501 Lavender Road in Wilmer, Texas, planned for five data center buildings of about 378,100 sq ft each. QTS has not filed any of them with the state.
Dallas V is QTS's tract of about 101 acres at 420 Lavender Road and South Millers Ferry Road in Wilmer, Texas, held for future data centers. QTS has published no building plan for it.
DC3 is a two-story, 560,000 sq ft data center on QTS's South Dallas DFW2 campus near Wilmer in southern Dallas County, with data center space on both floors and a small administration area.
Piscataway 1 DC2 is the two-story expansion building on the QTS Piscataway 1 campus at 101 Possumtown Road, Piscataway, New Jersey, completed in 2024.
QTS plans to construct a total of five, two-story, 360,000-square-foot data centers, totaling 1.8 million square feet in Henrico County.
QTS acquired this site via the Carpathia acquisition in 2015.
QTS is developing a data center campus on a plot of nearly 44 hectares south of Forssa town centre, with room for several buildings and a Fingrid switching station on site.
Augusta 6 is the last of six planned two-story buildings on QTS's Augusta campus (Project Eisenhower) off Gordon Highway in Augusta, Georgia, adjacent to Fort Eisenhower.
Augusta 4 is the fourth of six planned two-story buildings on QTS's Augusta campus (Project Eisenhower) off Gordon Highway in Augusta, Georgia, adjacent to Fort Eisenhower.
QTS plans to construct a total of five, two-story, 360,000-sqft data centers, totaling 1.8 million square feet in Henrico County.
PHX2 DC3 is the third of five data center buildings on the QTS Phoenix 2 campus, at 1400 N 40th Street in east Phoenix, Arizona.
Carrier-Neutral OperatorInterested in this information?Contact us and Blackstone plan an AI data center with the developer DCA Projektgesellschaft on the boundary of Amorbach and Weilbach in the district of Miltenberg, Lower Franconia.
The campus was a former Sun Times Press Facility and was acquired in 2014
QTS is developing 366,000 sq ft (34,000 sqm) of data center space across three stories, alongside 80,000 sq ft (7,432 sqm) of office and loading areas in its Chicago Campus.
QTS plans to build another data center building on its Chicago Campus.
Hillsboro 2 DC1 is the first of four buildings on QTS's Hillsboro 2 campus, at 4755 NE Huffman St in Hillsboro, Oregon.
Hillsboro 2 DC5 is the fourth and westernmost building on QTS's Hillsboro 2 campus, at 4113 NE Huffman St in Hillsboro, Oregon.
PHX2 DC5 is the fifth data center building on the QTS Phoenix 2 campus, at 1500 N 40th Street in east Phoenix, Arizona. QTS broke ground on it in 2023.
QTS plans to construct a total of five, two-story, 360,000-sqft data centers, totaling 1.8 million square feet in Henrico County.
This facility is part of QTS Data Center's Richmond II Campus in Virginia.
DC5 is a two-story, $180 million data center on QTS's Irving campus in Las Colinas, completed in 2025 and occupied by Microsoft.
QTS data centers' Project Granite is located on a 37.5-acre site at 1010 West Marietta St. NW.
DC6 is a two-story data center on QTS's Irving campus in Las Colinas, finished as a shell in late 2025 and fitted out for Microsoft in 2026.
Building 3 of five on QTS's Salt Lake City 1 campus in Eagle Mountain, Utah, under construction since fall 2025.
QTS Data Centers wants to build eight additional facilities spanning 3.2 million square feet on 240 acres on Babbitt and Miller roads. It will invest nearly $3 billion in those projects.
QTS Data Centers wants to build eight additional facilities spanning 3.2 million square feet on 240 acres on Babbitt and Miller roads. It will invest nearly $3 billion in those projects.
QTS has expanded its Richmond I campus on Portugee Road with three two-story, 155,175-square-foot data center buildings, totaling 465,525 square feet of space, and this building is one of them.
Planned Building 5 of five on QTS's Salt Lake City 1 campus in Eagle Mountain, Utah.
Hillsboro 2 DC3 is the third of four buildings on QTS's Hillsboro 2 campus, at 4327 NE Huffman St in Hillsboro, Oregon.
QTS has expanded its Richmond I campus on Portugee Road with three two-story, 155,175-square-foot data center buildings, totaling 465,525 square feet of space, and this building is one of them.
QTS Realty Trust is continuing its data center expansion at its Richmond Mega Data Center campus in Henrico after acquiring another 200 acres at the site. The company said that it planned to build up to 1.5 million square feet (140,000 sq m) of additional capacity.
This facility is part of QTS Data Center's Richmond II Campus in Virginia.
QTS Realty Trust is continuing its data center expansion at its Richmond Mega Data Center campus in Henrico after acquiring another 200 acres at the site.
ASH3 DC2 is the second of two Freedom Standard buildings on QTS's Ashburn 3 (Shellhorn) campus; completed in September 2022.
QTS is building up to 11 data center buildings on Lancium's Clean Campus in Hall County, Texas, south of Turkey.
QTS is building a 100+ acre campus in Manassas, Virginia. QTS bought the property, at 10680 University Blvd. adjacent to its existing data center, for $5 million in 2018.
This facility is part of the QTS Richmond IV Campus in Virginia.
This facility is part of the QTS Richmond IV Campus in Virginia.
DC3 is a multi-story data center on QTS's Irving campus in Las Colinas, occupied by Microsoft, with an on-site substation and diverse campus fiber entrances.
This facility is part of the QTS Richmond IV Campus in Virginia.
This facility is part of the QTS Richmond IV Campus in Virginia.
This facility is part of the QTS Richmond IV Campus in Virginia.
This facility is part of the QTS Richmond IV Campus in Virginia.
This facility is part of the QTS Richmond IV Campus in Virginia.
SAT2-DC1 is the first data center on QTS's San Antonio 2 Campus at Potranco and Ingram roads in west San Antonio, a three-story building opened in 2022.
QTS acquired this site via the Carpathia acquisition in 2015
QTS plans to construct a total of five, two-story, 360,000-sqft data centers, totaling 1.8 million square feet in Henrico County.
QTS San Antonio III is a site on Omicron Drive at Texas Research Park in west San Antonio, platted into three lots for future QTS data centers.
QTS acquired this site via the Carpathia acquisition in 2015 and was previously known as "QTS Dulles (The Vault)"
Piscataway 1 DC1 is the original 360,000 sq ft data center on the QTS Piscataway 1 campus at 101 Possumtown Road, Piscataway, New Jersey, acquired from DuPont Fabros in June 2016.
The QTS Miami data center rated to survive a category 5 hurricane, is above the 500-year flood level, and also has 3,000 sq. ft. of office space
Located less than 90 miles from San Francisco, this facility offers 46,000 sq. ft. of raised floor space and 9.0 megawatts (MW) of power capacity in seismically-neutral Sacramento.
QTS plans to construct a total of five, two-story, 360,000-sqft data centers, totaling 1.8 million square feet in Henrico County.
SAT2-DC2 is the second data center QTS plans on its San Antonio campus at Potranco and Ingram roads in west San Antonio.
QTS New Albany 2 is a two-building data center campus in New Albany, Ohio. New Albany 2 DC2 is located at 675 Beech Rd SW, Etna, OH.
Scranton (Northeast Pennsylvania)
QTS Data Centers has acquired 1,700 acres in Salem Township, Pennsylvania, for a data center and AI infrastructure campus.
US data center firm QTS has acquired 206 acres in the West Valley for $246.8 million in an all-cash deal in July, 2024 from TGV Investments LLC.
QTS plans a three-building data center campus on the former IBM plant in Vimercate, north-east of Milan.
Building 1, the easternmost of five buildings on QTS's Salt Lake City 1 campus in Eagle Mountain, Utah.
Building 2 of five on QTS's Salt Lake City 1 campus in Eagle Mountain, Utah, under construction since fall 2025.
Planned Building 4 of five on QTS's Salt Lake City 1 campus in Eagle Mountain, Utah.
Calatorao Expansion carries the planned second phase of QTS's Proyecto Rhodes campus at Calatorao, Zaragoza province, Spain.
November 19, 2026 Atlanta
DC BLOX filed a development of regional impact notice for a third building at its Atlanta West campus in Georgia, Data Center Dynamics reported. The filing with the Georgia Department of Community Affairs covers ATL1-C, a 500,000-square-foot data center at 1800 North River Road in Douglasville....
Read more
November 19, 2026 Permian Basin
ChronoScale Holdings is taking a 50% stake in STN's AI data center campus in Odessa, Texas, under a development partnership announced Nov. 18. Each company will contribute $390 million in value to the 50/50 venture, which is planned to house compute for an unnamed frontier AI lab across three...
Read more
November 18, 2026 Atlanta
Microsoft filed for state review on October 20 of a three-building data center campus in Rome, Georgia, with 422MW of planned capacity. The Development of Regional Impact application covers 349 acres at 0 Huffaker Road and 1,659,000 square feet of floor space. Microsoft owns the land, bought in...
Read more
November 18, 2026 Dallas
Giga Energy has signed a 10-year lease worth about $1 billion at its Project Clay data center in Hunt County, Texas. The agreement, announced on November 17, covers 60MW of capacity for an undisclosed U.S.-based AI cloud provider. Giga Energy develops, owns, and operates the campus, Reuters...
Read more
November 18, 2026 Ashburn: Data Center Alley
Loudoun County supervisors adopted a resolution on Nov. 17 to halt board action on data center and substation applications for up to 12 months. The vote was 7-1, with Supervisor Kristen Umstattd opposed and Supervisor Caleb Kershner abstaining, according to Loudoun Now. The pause runs from Sept....
Read more
November 17, 2026 Birmingham
Patmos has closed on a former Walmart Supercenter in Fairfield, Alabama, for a data center campus that starts at 20 MW. The Kansas City company announced the acquisition on Nov. 13, after Baxtel reported the Fairfield proposal in July. Patmos Fairfield LLC paid $32 million for the...
Read more
Jan 05, 2026 Eric Bell Dallas