QTS is developing a 612-acre data center campus along 76th Avenue SW within the Big Cedar Industrial Center.
QTS Data Centers is a privately held data center company owned by funds managed by Blackstone, with corporate headquarters in Overland Park, Kansas. It provides colocation, custom data center and managed services, along with carrier-neutral connectivity across its platform.
QTS operates sites in the United States and in the Netherlands. The company expanded its footprint with acquisitions in Chicago and Princeton in 2014, added government and managed hosting capabilities with the Carpathia acquisition in 2015, and entered the Netherlands market in 2019. QTS became a public company in 2013 and was taken private in 2021.
QTS is developing a 612-acre data center campus along 76th Avenue SW within the Big Cedar Industrial Center.
QTS New Albany 2 is a two-building data center campus in New Albany, Ohio. New Albany 2 DC1 is located at 785 Beech Rd SW, Pataskala, OH.
QTS New Albany 1 is a two-building data center campus in New Albany, Ohio. The first building of the campus is located at 1225 Beech Rd SW, New Albany, OH.
QTS New Albany 1 is a two-building data center campus in New Albany, Ohio. The second building, New Albany 1 DC2, of the campus is located at 1275 Beech Rd SW, New Albany, OH.
QTS Hillsboro-3 is the third data center building of its Hillsboro campus. The site is located at 4425 NE Huffman St, Hillsboro, OR 97124
Located in Blyth, Northumberland, this facility is situated on the QTS Data Centers' Cambois campus.
Located in Blyth, Northumberland, this facility is situated on the QTS Data Centers' Cambois campus.
Located in Blyth, Northumberland, this facility is situated on the QTS Data Centers' Cambois campus.
Located in Blyth, Northumberland, this facility is situated on the QTS Data Centers' Cambois campus.
Located in Blyth, Northumberland, this facility is situated on the QTS data centers' Cambois campus.
Located in Blyth, Northumberland, this facility is situated on the QTS Data Centers' Cambois campus.
Located in Blyth, Northumberland, this facility is situated on the QTS Data Centers' Cambois campus.
Located in Blyth, Northumberland, this facility is situated on the QTS Data Centers' Cambois campus.
Located in Blyth, Northumberland, this facility is situated on the QTS Data Centers' Cambois campus.
QTS Data Centers is building the Irving DC4 facility at 3 Longhorn Drive, Irving, TX.
ATL2 East is a massive 2-million-square-foot expansion to the QTS Fayetteville campus, designed to meet the soaring demand for AI and hyperscale cloud infrastructure.
QTS Phoenix Data Center Campus (PHX II) sits on an 85-acre site with 5 data center buildings.
QTS Realty Trust is continuing its data center expansion at its Richmond Mega Data Center campus in Henrico after acquiring another 200 acres at the site. The company said that it planned to build up to 1.5 million square feet (140,000 sq m) of additional capacity.
QTS's Santa Clara campus has two distinct data center buildings
The QTS Atlanta-Suwanee 1 DC1 has 385,000 sq. ft. of data center and office space in the north suburbs of Atlanta
QTS's Forth Worth site is the company's second data center in Dallas Market.
QTS is expanding its data center campus in Princeton, New Jersey. The first phase of the project was topped off in November, 2024.
A judicial ruling voided the massive Digital Gateway data center project, but the developers and county are appealing the decision, leaving the 1.7-gigawatt plan in doubt.
The QTS Data Center in Colorado Springs encompasses a 249,958-square-foot facility situated on a 21-acre site
QTS New Albany 2 is a two-building data center campus in New Albany, Ohio. New Albany 2 DC2 is located at 675 Beech Rd SW, Etna, OH.
QTS is developing a ten-building data center campus in the north of England. The development is expected to be completed by 2035
QTS is set to develop a new data center near Madison, Wisconsin, with plans for up to 15 buildings. The initial phase will include three to five buildings, each requiring an investment of $300-500 million.
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
QTS is expanding its DFW2 data center campus through the construction of two additional buildings in Wilmer, Dallas County.
The Texas Department of Licensing and Regulation (TDLR) received two applications from QTS for data center developments in Wilmer, Dallas County.
QTS massive data center in Richmon sits on 110 acres with an additional 100 acres available for future development. There are 3 building on the campus with a total potential floor space of 550,000 square feet
The company has leased a substantial 756,000 square foot (70,234 sqm) facility, identified as Building B1, within the New Century Commerce Center (NCCC) in New Century, Kansas.
QTS is exploring opportunities to establish new data center campuses in Blakely, Georgia.
QTS is building a new data center campus outside Dallas, Texas. The company aims to develop a two-story, 413,725 sq ft (38,436 sqm) building in the Lancaster area of Dallas County.
QTS is proposing a 1,700+ acre technology campus in Salem Township, Pennsylvania, designed to meet growing demand for data center and AI infrastructure.
QTS Data Centers has officially withdrawn its proposal for a massive expansion plan near Madison, Wisconsin, effectively canceling the development of a new data center campus in the Village of DeForest.
QTS has expanded its Richmond I campus on Portugee Road with three two-story, 155,175-square-foot data center buildings, totaling 465,525 square feet of space, and this building is one of them.
QTS’s proposed Project Blue Hole campus in Blakely, Georgia, is an early-stage hyperscale development off Martha Berry Highway that could reach 12 million sq ft across nine buildings with three substations, targeting full buildout by 2035
QTS’s Augusta campus near Fort Gordon is a planned six-building hyperscale development on 170+ acres, backed by around $2B in investment, with updated local approvals in place and first delivery targeted as early as 2027.
Located in the Green Data Port of Eemshaven, home to the largest wind park on Dutch soil.
QTS is constructing a massive datacenter on a 88 acre campus in Hillsboro. At full build out the campus will have five mega data centers making up more than one million square feet of data center capacity and more than 250MW of power capacity.
QTS has begun construction of Salt Lake City 1 data center campus in Eagle Mountain, Utah.
QTS planned for the expansion in 2022 with Additional 2 story, 50,000 sq. ft of space.
In 2023, QTS acquired its second data center to expand to a Suwanee campus.
The campus, also known as QTS Aurora, on 80 acres, will consist of four buildings and is projected to ramp up to capacity over 10 years.
QTS' San Antonio campus, located at 8535 Potranco Road, sits approximately eight miles east of the new plot.
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
The 48-acre plot known as the "Omicron Subdivision" was subdivided into 3 plots and will be QTS's future expansion in San Antonio.
QTS Realty Trust is continuing its data center expansion at its Richmond Mega Data Center campus in Henrico after acquiring another 200 acres at the site. The company said that it planned to build up to 1.5 million square feet (140,000 sq m) of additional capacity.
QTS Data Centers wants to build eight additional facilities spanning 3.2 million square feet on 240 acres on Babbitt and Miller roads. It will invest nearly $3 billion in those projects.
QTS plans to construct a total of five, two-story, 360,000-sqft data centers, totaling 1.8 million square feet in Henrico County.
QTS plans to construct a total of five, two-story, 360,000-sqft data centers, totaling 1.8 million square feet in Henrico County.
QTS Realty Trust is continuing its data center expansion at its Richmond Mega Data Center campus in Henrico after acquiring another 200 acres at the site.
QTS plans to construct a total of five, two-story, 360,000-sqft data centers, totaling 1.8 million square feet in Henrico County.
The campus was a former Sun Times Press Facility and was acquired in 2014
QTS is developing 366,000 sq ft (34,000 sqm) of data center space across three stories, alongside 80,000 sq ft (7,432 sqm) of office and loading areas in its Chicago Campus.
QTS plans to build another data center building on its Chicago Campus.
QTS has acquired a total of 620 acres of land in Sandston, Virginia
In 2013 QTS acquired the former Maxim semiconductor plant. It was QTS's first data center in the Dallas market
QTS Hillsboro-2 is the second data center building of its Hillsboro campus. The site is located at 4755 NE Huffman St, Hillsboro, OR.
QTS Hillsboro-5 is the fifth data center building of its Hillsboro campus. The site is located at 4113 NE Huffman St, Hillsboro, OR.
PHX2 DC5 data center building is a part of QTS' Phoenix Campus. QTS broke ground on this data center in 2023.
US data center firm QTS has acquired 206 acres in the West Valley for $246.8 million in an all-cash deal in July, 2024 from TGV Investments LLC.
QTS plans to construct a total of five, two-story, 360,000-sqft data centers, totaling 1.8 million square feet in Henrico County.
QTS plans to construct a total of five, two-story, 360,000-square-foot data centers, totaling 1.8 million square feet in Henrico County.
QTS Realty Trust is continuing its data center expansion at its Richmond Mega Data Center campus in Henrico after acquiring another 200 acres at the site.
QTS data centers' Project Granite is located on a 37.5-acre site at 1010 West Marietta St. NW.
QTS Data Centers wants to build eight additional facilities spanning 3.2 million square feet on 240 acres on Babbitt and Miller roads. It will invest nearly $3 billion in those projects.
QTS Data Centers is building a second data center adjacent to its first one near the Alliance Texas development. The two-story building is set to span 471,875 sq ft (43,840 sqm) and see $220 million invested in the project.
QTS bought the property consisting of 375 acres in July 2022 for $255 million. A development timeline has yet to be announced.
QTS has expanded its Richmond I campus on Portugee Road with three two-story, 155,175-square-foot data center buildings, totaling 465,525 square feet of space, and this building is one of them.
QTS Hillsboro-4 is the fourth data center building of its Hillsboro campus. The site is located at 4327 NE Huffman St, Hillsboro, OR.
Blackstone plans to invest €7.5 billion ($8.2 billion) in the project, tentatively named Project Rodes, situated on a 224-hectare site in Calatorao, a town in Zaragoza province.
QTS Lockridge ASH2 hyperscale campus is located in Sterling, Virginia. Comprising two bookend buildings on a tight infill site, the two-story single-use facilities span a 28-acre campus.
QTS has expanded its Richmond I campus on Portugee Road with three two-story, 155,175-square-foot data center buildings, totaling 465,525 square feet of space, and this building is one of them.
QTS data centers' Project Granite is located on a 37.5-acre site at 1010 West Marietta St. NW.
QTS is building a 100+ acre campus in Manassas, Virginia. QTS bought the property, at 10680 University Blvd. adjacent to its existing data center, for $5 million in 2018.
The QTS Irving 1 DC3 facility will provide our customers with an on-site substation and diverse campus fiber entrances with a redundant campus conduit system.
QTS acquired this site via the Carpathia acquisition in 2015
The site is also known as the Blue Ridge Data Center when it was owned by Carpathia.
QTS acquired this site via the Carpathia acquisition in 2015 and was previously known as "QTS Dulles (The Vault)"
The site was acquired from Dupont Fabros in June 2016 for $125 million. It was previously known as "DuPont Fabros NJ1" when owned by Dupont.
Located less than 90 miles from San Francisco, this facility offers 46,000 sq. ft. of raised floor space and 9.0 megawatts (MW) of power capacity in seismically-neutral Sacramento.