H5: Chicago

Latest Podcast 1941-51 W Hastings St
Planned
Future facility in planning stage
Operated by:

H5: Chicago

Site planned for 2027 and has expansions through 2028
Utility Provider: ComEd
░░░░░░░ Interested in this information? Contact us SqFt
Total Building Size

Map and Nearby Locations

1941-51 W Hastings St
H5 Data Centers Sites
Nearby Facilities

H5: Chicago Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of H5: Chicago

Distance Site About
0.05 miles Metro Edge: Illinois Medical District (IMD)
Commercial real estate investment firm Metro Edge Development is building a data center in Chicago, Illinois.
1.37 miles QTS: CHI1 DC2
QTS is developing 366,000 sq ft (34,000 sqm) of data center space across three stories, alongside 80,000 sq ft (7,432 sqm) of office and loading areas in its Chicago Campus.
1.38 miles QTS: CHI1 DC3
QTS plans to build another data center building on its Chicago Campus.
1.50 miles QTS: CHI1 DC1
The campus was a former Sun Times Press Facility and was acquired in 2014
1.73 miles TierPoint Chicago Polk
1.73 miles CoreSite Chicago CH2
In February 2018, CoreSite acquired a two-acre land parcel in downtown Chicago, Illinois, on which CoreSite built CH2, a greenfield development of a 175,000-square-foot, turn-key, four-story data center supporting 18 critical megawatts of power capacity. The building was completed in June 2020.
1.73 miles First Communications Chicago
1.85 miles DataBank (ORD2) 840 S Canal
1.85 miles Server Farm Realty 840 South Canal
4 MW Critical Load on Each Floor (Floors 1-5) 130-160 Watts per Raised Floor SF
2.22 miles 725 S Wells - 1547 Critical Systems
In 2025, a joint venture formed by Harrison Street Real Estate Capital, LLC and fifteenfortyseven Critical Systems Realty (“1547”) acquired this data center from CIM Group.
2.22 miles Crown Castle 725 S Wells
2.23 miles Netrality Chicago: 717 S Wells
The 10 story building was constructed in 1923 and eventually was converted into a data center.
2.30 miles EXA - 111 North Canal
Former GTT suite
2.30 miles Lumen Chicago 1
2.31 miles Igor Gabal: Chicago, IL
Local real estate developer Igor Gabal in partnership with Strategic Value Partners, is advancing a project to convert a portion of the historic 300 West Adams Building in downtown Chicago into a data center.
2.32 miles Cogent: 216 W Jackson
2.37 miles Legacy: Chicago Byte Exchange CBE1
An affiliate of real estate firm Prime Group bought an office building in Chicago from options exchange company Cboe Global Markets for $12 million.
2.38 miles 365 Chicago
The site is a former Switch and Data site (also owned by Equinix for a short period.)
2.38 miles CoreSite Chicago CH1
Once owned by the Western Union company, the building was formerly known as "The Telegraph Building."
2.38 miles Cogent: 427 S LaSalle
2.39 miles QuadraNet Chicago
2.42 miles Colocation America CH2
2.42 miles Lumen Chicago 5
2.42 miles Cogent: 600 S Federal
2.42 miles Lumen Chicago 6
2.42 miles Digital Realty: Chicago ORD11
2.42 miles DataBank (ORD1) 600 S Federal
2.58 miles Verizon: 140 S Dearborn
2.65 miles Lumen Chicago 3
2.83 miles Lumen Chicago 4
2.91 miles Lumen Chicago 2
2.95 miles Centersquare: Chicago ORD1(B, C & D)
Digital Realty Trust owns the building at 350 Cermak and is CTL's Landlord.
2.95 miles Colocation America CH1
2.95 miles Centersquare: Chicago ORD1
Centersquare's ORD1 site is located in the heart of the Chicago Financial District on the 7th floor of an 8-story building on a fiber-linked campus.
2.95 miles Equinix Chicago CH1, CH2, & CH4
Equinix distinctly separates CH1, CH2, and CH4 into separate data centers, but in reality, the sites are in the same building.
2.95 miles Digital Realty: ORD10
Digital Realty acquired the colocation services business of Hivelocity in 2025.
2.95 miles Steadfast Chicago 350 E Cermak
2.96 miles Deft: Downtown CH1
5.38 miles 1547 Chicago Midway Technology Centre
In 2025, a joint venture formed by Harrison Street Real Estate Capital, LLC and fifteenfortyseven Critical Systems Realty (“1547”) acquired this data center from CIM Group.
6.25 miles MicroLink: Chicago, IL
MicroLink is planning to build a data center in Chicago, Illinois.
9.48 miles Lumen Broadview
10.41 miles Digital Realty: Franklin Park Expansion
Digital Realty acquired two land parcels near their existing Franklin Park campus in separate transactions on July 2025, for a total of approximately $18 million.
10.42 miles Tierpoint Chicago West
10.50 miles Digital Chicago Franklin Park Campus on Grand Ave - Digital Realty
Digital Chicago is a master-planned 40-acre campus in the Village of Franklin Park. The campus has 3 existing buildings, totaling 574,994 sqft
10.50 miles Digital Realty: ORD13
10.50 miles Digital Realty: ORD14
10.53 miles Digital Realty: Chicago ORD12
10.64 miles Digital Realty: ORD15
In 2017, Digital Realty acquired the former Motorola Headquarters site in Franklin Park and subsequently converted it into a data center.
10.91 miles Related Digital: Chicago, IL
Related Digital is planning a 430-acre campus in Chicago, Illinois, at the old US Steel South Works location.
10.92 miles Related Digital: Chicago Expansion
12.70 miles Verizon: Swift Dr
12.70 miles DataBank (ORD4) Oak Brook
12.70 miles LexusNexis Oak Brook
12.82 miles 505 N Railroad Ave - Digital Realty
The Digital Chicago Campus covers 21 acres of land with access to major fiber networks and can support up to 8 MW of IT load at N+1 redundancies.
12.96 miles Aligned: ORD-01
Aligned's ORD-01 data center is a state-of-the-art facility located in Northlake, IL, just outside of downtown Chicago. At full build, Aligned’s Chicago campus covers 520,000 sq. ft. and offers ~ 100 MW of critical load.
12.98 miles Aligned: ORD-02
Aligned's ORD-02 is a data center located in Northlake, IL near downtown Chicago. Part of Aligned's 18.5-acre hyperscale campus.
13.20 miles HubInterested in this information?Contact us
13.27 miles CoreWeave: Hammond, IN
13.29 miles Digital Crossroad: Hammond, IN (Phase 2)
Digital Crossroad is planning to expand its campus in Hammond, Indiana. The company plans to add another 450,000 sq ft (16,720 sqm) building in the second phase.
13.37 miles T5: Chicago lll
T5@Chicago III will be build-to-suit, with the company spending more than $500 million to develop a three-story, 250,000 sq ft facility for multi-tenant or single-tenant operations.
13.39 miles Digital Crossroad (Indiana NAP)
The facility (DX-1) is a 105,000 square foot data center located on the former State Line Generating Plant, Hammond, IN.
13.69 miles Server Farm Oak Brook
The campus was originally built as the corporate headquarters of the Chicago Bridge & Iron Company (CB&I).
13.69 miles US Signal Oakbrook IL01
800a 480V 3 phase 450kW diesel generator with 24 hour run time at full load 500kVa UPS capacity with battery backup
13.69 miles Verizon: (Oak Brook)
13.82 miles NYI Chicago (Oak Brook)
14.71 miles Iron Mountain Chicago
First announced in 2018, the former Hart Schaffner Marx suit factory started construction in 2024.
14.79 miles Robbins Resource Recovery Center
The shuttered Robbins Resource Recovery Center, a former 16-acre waste-to-energy incinerator facility featuring seven existing structures, is currently being marketed as a potential data center redevelopment site listed for $25 million to $30 million.
15.75 miles Equinix Chicago CH7
16.70 miles TA Realty: Elk Grove
TA Realty is constructing a 45-acre data center campus at the corner of Elmhurst Road and Old Higgins Road. The development includes four two-story buildings and an electrical substation.
16.79 miles Carrier-Neutral Data CenterInterested in this information?Contact us
Carrier-Neutral Operator is developing a 62-acre campus in Wood Dale, Illinois, with plans to construct six data center buildings encompassing approximately 1.4 million square feet.
16.82 miles Element Critical CH1
Element Critical acquired the site in January 2019 from Sungard. The facility was previously known as SunGard Wood Dale (711).
16.83 miles Element Critical CH2
Element Critical acquired the site in January 2019 from Sungard. The facility was previously known as SunGard Wood Dale (341).
17.05 miles T5: Chicago V
T5 Data Centers has secured land in Elk Grove Village to build its upcoming CHI V data center. The planned 220,000 square foot (20,438 sqm) facility is expected to be operational by 2028.
17.07 miles Centersquare: Chicago ORD2
Cyxtera's CH3 Elk Grove site is across the street from the Digital Realty Chicago campus (former Dupont Fabros) and close to Equinix CH3.
17.09 miles EdgeConneX CHI01
17.13 miles EdgeConneX: CHI03
EdgeConneX CHI03 is a new 167,000-square-foot, two-story data center building on its Elkgrove campus near Chicago.
17.18 miles 2299 Busse (CH2) Digital Realty
17.18 miles 360TCS-Lombard
17.18 miles Digital Fortress: Chicago Lombard
17.19 miles EdgeConneX CHI02
17.20 miles Stream Chicago I
Free-Standing, Data Center Designed to Tier III Standards
17.24 miles Equinix: CH5
Equinix has started construction on a new 195,000-square-foot, two-story data center in Elk Grove, Chicago. This new facility is being built right next to their existing CH3 data center.
17.29 miles Equinix Chicago CH3
17.33 miles Rackspace Elk Grove ORD1
17.35 miles HostPapa CH1
Formerly known as "ColoCrossing CH1"
17.35 miles Deft: Elk Grove DF-CH1
17.35 miles Stream Chicago II
Stream Data Centers' Chicago II data center in Elk Grove Village, Illinois is a 226,000 square foot facility.
17.38 miles 2200 Busse Rd (CH1) DRT
17.45 miles 1400 E Devon Ave (CH3) DRT
17.57 miles Carrier-Neutral Data CenterInterested in this information?Contact us
Stream DC aims to demolish around 55 Elk Grove residential properties to develop a three-building data center campus with an on-site substation. The three buildings will total more than 2 million sq ft.
17.61 miles Stream: Chicago ORDC2
Stream DC aims to demolish around 55 Elk Grove residential properties to develop a three-building data center campus with an on-site substation. The three buildings will total more than 2 million sq ft.
17.72 miles Stream: Chicago ORDC3
Stream DC aims to demolish around 55 Elk Grove residential properties to develop a three-building data center campus with an on-site substation. The three buildings will total more than 2 million sq ft.
17.87 miles DigiCo: Chicago
The facility sits on a ten-acre site and will serve as a flagship asset in HMC Capital's newly established DigiCo Infrastructure REIT.
17.88 miles Stack: CHI02
Data center firm Stack Infrastructure is expanding its footprint in Chicago, Illinois with a new data center in Elk Grove Village, known as CHI02.
17.90 miles STACK Chicago CHI01
18.00 miles STACK CHI01B
STACK INFRASTRUCTURE CHI01B Chicago Data Center is located at 1441 Touhy Avenue, Elk Grove Village, IL, which currently offers 24 MW of critical power and 221,000 square feet of space.
18.05 miles CoreWeave: US Central ORD1
18.30 miles CyrusOne: Lombard CHI5
9 MW of critical capacity Both a 1.5MW and a 2MW transformer
18.42 miles Prime: ORD01-01
Prime Data Centers is building a 750,000 square foot hyperscale data center campus in Elk Grove Village (Chicago), Illinois, which will comprise an investment of around $1 billion.
18.45 miles CenturyLink: Arlington Heights
18.47 miles Prime: ORD01-03
Building C will be another three-story construction, offering 294,429 gross square feet of space.
18.51 miles Prime: ORD01-02
Building B will be another three-story construction, offering 279,360 gross square feet of space.
18.53 miles CloudHQ: ORD2
CloudHQ is building a $2.5 billion data center campus at the former United Airlines world headquarters office campus in Mount Prospect, Illinois.
18.64 miles CloudHQ: ORD3
CloudHQ is building a $2.5 billion data center campus at the former United Airlines world headquarters office campus in Mount Prospect, Illinois.
18.69 miles CloudHQ: ORD1
CloudHQ is building a $2.5 billion data center campus at the former United Airlines world headquarters office campus in Mount Prospect, Illinois.
18.88 miles Hub ProInterested in this information?Contact us
The 37-acre plot in the Elk Grove Technology Park could eventually hold three data center buildings totaling 400,000 sq ft (37,000 sq m).
18.90 miles Station AlphaInterested in this information?Contact us
The 36.6-acre plot in the Elk Grove Technology Park could eventually hold three data center buildings totaling 400,000 sq ft (37,000 sq m).
18.97 miles PrimeInterested in this information?Contact us
The 36.6-acre plot in the Elk Grove Technology Park could eventually hold three data center buildings totaling 400,000 sq ft (37,000 sq m).
18.98 miles T5 Chicago II
T5 Chicago II campus is located at 200 Innovation Drive in the Elk Grove area.
19.04 miles NTT: Chicago CH4
NTT has acquired two office buildings in Chicago, Illinois, and plans to replace them with data centers.
19.08 miles NTT: Chicago CH5
In November 2023, NTT Global Data Centers in November paid $27.5 million for the building.
19.15 miles NTT: CH3
This facility is a part of NTT's Chicago data center campus in Illinois.
19.15 miles NTT Chicago CH1
NTT acquired its Chicago site in 2018 through its RagingWire subsidiary. Launched in 2021, the first two-story data center, CH1, spans 126,000 sq ft (11,705 sqm) of data floor space.
19.19 miles NTT: CH2
This facility is a part of NTT's Chicago data center campus in Illinois.
19.36 miles Apotech: Illinois 1
Apotech Group operates its Illiois 1 data center facility in the Chicago market, situated at 1331 E Business Center Drive. This facility is a retrofitted structure, encompassing 32,000 square feet of space.
19.55 miles DataBank ORD3 Mount Prospect
19.55 miles Colocation America CH3
19.67 miles Aligned: ORD-04
This facility will be part of Aligned's ORD-03 campus in Elk Grove Village, a suburb of Chicago.
19.77 miles Aligned: ORD-03
Aligned is building a datacenter campus after acquiring an assemblage of beleaguered office properties near O’Hare International Airport.

Operating Company

Operated by:

H5 Company History:


0
Facilities
0
Markets
0MW
Megawatts

News See all

Read H5 expands its San Antonio data center
H5 expands its San Antonio data center

H5 expands its San Antonio data center

November 21, 2023 H5 Data Centers

H5 this week announced the phase three expansion of its 100 Taylor Street facility, adding an additional 340 cabinets and up to 1.5MW of additional UPS capacity. This site, located at 100 Taylor Street, was acquired by H5 in 2018 and was previously owned by the Texas ISP Taylor Telecom. It is an...

Read more
Read H5 Data Centers to expand its Phoenix data center
H5 Data Centers to expand its Phoenix data center

H5 Data Centers to expand its Phoenix data center

July 04, 2023 H5 Data Centers

H5 Data Centers has announced a 30,000 sqft expansion of its Phoenix colocation facility. Located at 2600 W. Germann Road in Chandler, AZ, this expansion is part of the company's third phase of development at the 180,000-square-foot data center. Further to this square-footage expansion, phase...

Read more
Read Construction of H5's Ashburn, VA Data Center Begins
Construction of H5's Ashburn, VA Data Center Begins

Construction of H5's Ashburn, VA Data Center Begins

March 22, 2023 H5 Data Centers

After dismantling the former data center there, H5 Data Centers has started construction on a new one in Ashburn, Virginia. This week, the company started building a 255,000-square-foot, three-story data center with a 42-megawatt capacity. The building is offered for pre-leasing at Loudoun...

Read more
Read H5 Data Centers Completes The Acquisition of Seven Data Centers From vXchnge
H5 Data Centers Completes The Acquisition of Seven Data Centers From vXchnge

H5 Data Centers Completes The Acquisition of Seven Data Centers From vXchnge

February 01, 2022 H5 Data Centers

H5 Data Centers has announced that it has completed the acquisition of seven data center facilities from vXchnge across the United States. With this development, vXchnge has just one data center. With this agreement, H5 data centers has added over 250,000 square feet (23,200 square meters) of...

Read more
Read H5 Data Centers expands in Ohio through a data center acquisition
H5 Data Centers expands in Ohio through a data center acquisition

H5 Data Centers expands in Ohio through a data center acquisition

December 15, 2021 H5 Data Centers

H5 Data Centers has completed the acquisition of a data center at 925 Dalton Avenue, Cincinnati, Ohio. The 107,000 square feet (9,940 square meters) purpose-built data center was built to Tier III standards. It currently has a 2MW capacity, but it can be expanded to 6MW upon full buildout. H5...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?