Cologix: COL6

Latest Podcast 6787 Green Meadows Drive
Planned
Future facility in planning stage
Operated by:

Cologix: COL6

Year Planned: 2029

This planned facility is part of Cologix COL5 campus in Columbus.

Map and Nearby Locations

6787 Green Meadows Drive
Cologix Sites
Nearby Facilities

Cologix: COL6 Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Cologix: COL6

Distance Site About
0.07 miles Cologix: COL5
Cologix is constructing a 60,000-square-foot, AI-ready facility, COL5, in Columbus, Ohio.
1.52 miles Centersquare: Columbus CMH1
DCI Technology Holdings owns the building and is CenturyLink's landlord.
2.51 miles Expedient: Lewis Center (CMH3)
Expedient data center Located at 281 E. Powell Road in Lewis Center township with The 102,000 sq ft (9,475 sqm) facility offers 3MW of initial power capacity that will be increased to 7.5 MW in the future.
5.03 miles Cologix Columbus COL4
Cologix is building COL4, a 256,000 square foot data center on 9 acres along Alta View and Worthington Woods boulevards in Ohio. This facility will offer 27 MW of capacity.
5.15 miles Cologix Columbus COL1, COL2
COL1 (32,000sqft) and COL2 (20,000sqft) represent 2 phases of buildout in the same building. Cologix entered the Columbus market in February of 2014 through an acquisition of DataCenter.BZ
5.21 miles Cologix COL3
5.82 miles WeConnect Westerville
8.36 miles eNET Columbus
8.79 miles Park BetaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.10 miles DartPoints: Dublin, OH
The facility was previously operated by Metro Data Center LLC before being acquired by Dartpoints in October 2020.
9.81 miles Expedient Dublin (CMH2)
Offering 29,000 square foot of total floor space, Expedient’s Dublin data center is powered by redundant electric utility power feeds and 4 auto-cutover diesel generators
9.91 miles Expedient Upper Arlington
10.50 miles Racksquared 2560 Value Way
11.05 miles Edge PlazaInterested in this information?Contact us
11.10 miles StationInterested in this information?Contact us
11.12 miles GlobalInterested in this information?Contact us
11.18 miles WestInterested in this information?Contact us
11.22 miles Hub UltraInterested in this information?Contact us
11.25 miles Center AlphaInterested in this information?Contact us
11.30 miles Center UltraInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
11.32 miles Center MaxInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
11.32 miles Edge CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
11.32 miles Core RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
11.33 miles GlobalInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
11.34 miles TowerInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
11.37 miles Connect Data Centers: Hilliard, OH
US involvement from Oppidan's Hilliard data center spans 89,954 sqft. Oppidan lists Connect Data Centers as a subsidiary.
11.51 miles TwoInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
11.53 miles CampusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
11.69 miles Hub AlphaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
11.70 miles Global ValleyInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
11.72 miles West StationInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
11.75 miles Hub ProInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
11.78 miles Tower ThreeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
11.86 miles Edged Energy: Columbus CMH01
Edged Energy data center spans 206,000 sq ft on a 15-acre parcel at 6385 New Albany Road East.
11.98 miles Discover Financial Services New Albany
12.16 miles TJX Corporate Techno
12.26 miles Compass New Albany
12.33 miles Compugen New Albany
12.37 miles Stack: NAL01B
NAL01B is STACK's new building on its NAL01 campus on Souder Road, New Albany, Ohio.
12.52 miles Stack: NAL01A
STACK acquired the facility in October 2019 from Nationwide Insurance. Nationwide initially built the facility in 2008 for a cost of $96 million.
13.01 miles Ridge OneInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.06 miles Campus PlusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.10 miles TowerInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.14 miles West CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.16 miles Tower MaxInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.18 miles TowerInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.18 miles Plaza PrimeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.25 miles Park ProInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.51 miles East ValleyInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.55 miles CoreInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.56 miles Karis Critical: New Albany, OH
Data center developer Karis Critical has purchased 115 acres of land in New Albany, Ohio.
14.58 miles East CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.68 miles Hyperscale Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.68 miles Hyperscale Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.75 miles Hyperscale Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.83 miles Hyperscale Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.85 miles Hyperscale Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.85 miles HubInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.92 miles Point ProInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.94 miles Lumen: 580 North 4th
14.96 miles Tower GammaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.97 miles Valley AlphaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.01 miles QTS: Babbitt Rd, New Albany
QTS Data Centers wants to build eight additional facilities spanning 3.2 million square feet on 240 acres on Babbitt and Miller roads. It will invest nearly $3 billion in those projects.
15.04 miles Core HubInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.12 miles Plaza BetaInterested in this information?Contact us
15.19 miles Central CampusInterested in this information?Contact us
15.19 miles Vantage: OH11
Vantage has started work on its OH1 data center campus at 3475 Horizon Ct., which is inside the Silicon Heartland Innovation Park.
15.21 miles Campus AlphaInterested in this information?Contact us
15.21 miles QTS: Miller Road, New Albany
QTS Data Centers wants to build eight additional facilities spanning 3.2 million square feet on 240 acres on Babbitt and Miller roads. It will invest nearly $3 billion in those projects.
15.24 miles Vantage: OH12
This facility is a part of Vantage's New Albany data center campus in Ohio.
15.27 miles Vantage: OH13
This facility is a part of Vantage's New Albany data center campus in Ohio.
15.29 miles Lincoln Rackhouse: Silicon Heartland Innovation Park
15.39 miles Lumen: 266 North 5th
15.41 miles Cogent: 240 North 5th
15.41 miles CityNet Columbus
15.43 miles PointInterested in this information?Contact us
15.44 miles WOW! 226 N 5th
WOW!'s Columbus datacenter was acquired in 2013 from Bluemile assets. The site offers 26,00sqft and can expand to 52,00 sqft.
15.44 miles Lumen: 226 North Fifth
15.44 miles SouthInterested in this information?Contact us
15.50 miles Racksquared 325 E Spring St
15.52 miles CampusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.62 miles Global CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.75 miles US Signal Columbus
DC power w/battery backup available
Multiple diverse power feeds from utility grids
15.75 miles CENTRA: 180 East Broad (CMH01)
15.78 miles Carrier-Neutral Data CenterInterested in this information?Contact us
15.79 miles Metro CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.82 miles CeraNet Columbus
15.84 miles Cologix: COL8
15.84 miles RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.87 miles CoreInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.91 miles QTS: New Albany 1 DC1
QTS New Albany 1 is a two-building data center campus in New Albany, Ohio. The first building of the campus is located at 1225 Beech Rd SW, New Albany, OH.
15.91 miles Park OneInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.95 miles QTS: New Albany 1 DC2
QTS New Albany 1 is a two-building data center campus in New Albany, Ohio. The second building, New Albany 1 DC2, of the campus is located at 1275 Beech Rd SW, New Albany, OH.
15.95 miles Point GammaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.97 miles North PointInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.04 miles Crown Castle 101 E Town
Crown Castle acquired Lightower in 2017
16.04 miles Cologix: COL7
Cologix has acquired approximately 154 acres of land in Johnstown, Ohio, to develop a new, AI-ready data center campus.
16.05 miles ParkInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.10 miles Global PlazaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.10 miles Cologix: Johnstown Expansion
16.11 miles North StationInterested in this information?Contact us
16.14 miles CloudInterested in this information?Contact us
16.16 miles Valley ThreeInterested in this information?Contact us
16.17 miles Prime PlazaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.28 miles Edge HubInterested in this information?Contact us
16.28 miles Central HubInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.35 miles QTS: New Albany 2 DC1
New Albany 2 DC1 is the first of two buildings on the QTS New Albany 2 campus, at 785 Beech Rd SW, Pataskala (Etna Township), Ohio.
16.37 miles Plaza ProInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.39 miles TowerInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.42 miles Center BetaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.43 miles Core HubInterested in this information?Contact us
16.44 miles QTS: New Albany 2 DC2
QTS New Albany 2 is a two-building data center campus in New Albany, Ohio. New Albany 2 DC2 is located at 675 Beech Rd SW, Etna, OH.
16.50 miles Valley MaxInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.54 miles EdgeConnex: Johnstown North Campus
EdgeConnex acquired a 170.29-acre parcel of land for roughly $62.2 million, or about $365,017 per acre.
16.55 miles West PointInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.57 miles Point PlusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.59 miles Ridge PrimeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.63 miles East ValleyInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.63 miles TowerInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.66 miles Global PlazaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.66 miles EdgeConnex: Johnstown South 2
Phase II of EdgeConneX's Johnstown South Campus will see the construction of a new two-story 700,000 sq ft (65,030 sqm) building.
16.68 miles Cloud ParkInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.77 miles PointInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.78 miles EdgeConnex: Johnstown South 1
EdgeConneX, a US data center operator, invested $137.2 million to acquire nearly 270 acres across multiple sites in Licking County.
16.79 miles CyrusOne: New Albany COL-1
CyrusOne has broken ground on a $150 million data center development in New Albany, Ohio.
16.79 miles DBT Data: Jug & Mink Project
Washington DC-based DBT-Data plans to develop a data center at the New Albany International Business Park, close to Intel's upcoming chip fab site.
16.83 miles Central PointInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.90 miles MicroLink: Mansfield Campus
MicroLink is planning to build a data center in Columbus, Ohio.
16.95 miles Kyndryl: Columbus
17.20 miles DBT Data: 2214 Harrison Rd
DBT Data acquired 44 acres of land in March 2022 with the intention of developing a data center project on the site.
18.51 miles Karis: Galloway, Ohio
Karis Critical's proposed data center project on 127 acres in Prairie Township, Ohio, remains strictly in a "land-banked" planning phase, with no formal development or construction application submitted to local authorities.

Operating Company

Operated by:

Cologix Inc. is a network-neutral interconnection and colocation data center company headquartered in Denver. Cologix provides data center and interconnection solutions from 25 prime interconnection locations across 9 strategic North American edge markets. Cologix has over 1,600 customers.

Cologix History

Operational since December 2010, Cologix has completed nine acquisitions and announced six new market expansions:

  • Acquisition: The Dallas INFOMART data center suite from NaviSite
  • Acquisition: Canix Colo located in Montreal, Canada
  • Acquisition: Telehouse Centre Canada, located in Toronto and Vancouver, Canada
  • Acquisition: Standard Connections, located in Toronto, Canada
  • Acquisition: The Minnesota Gateway, located in Minneapolis, Minnesota.
  • Acquisition: Carrier Connex, located in Toronto, Canada
  • Expansion: 12,000 SQF expansion in the Dallas INFOMART building in Dallas, Texas
  • Expansion: 20,000 SQF expansion in 905 King Street West in downtown Toronto, Ontario
  • Expansion: 26,000 SQF expansion in 1155 University Street in downtown Montreal, Quebec
  • Expansion: 15,000 SQF expansion in 1050 West Pender in downtown Vancouver, British Columbia
  • Acquisition: JAX Meet-Me-ME Room located in 421 West Church Street in Jacksonville, Florida
  • Expansion: 28,000 SQF expansion in 511 11th Avenue South in downtown Minneapolis, Minnesota
  • 2014 Acquisition: DataCenter.BZ located in Columbus, Ohio
  • Expansion: 2.7 acres land acquisition in Columbus, Ohio immediately adjacent to existing 5-acre data center campus
  • Sept 2014 Acquisition: Colo5 data centers in Jacksonville and Lakeland, Florida
  • Oct 2015 Net Access (NAC) acquisition added 3 data centers and 1 disaster recovery center in New Jersey.
  • June 2018 Bill Fathers replaced Grant van Rooyen as Cologix CEO
0
Facilities
0
Markets
0MW
Megawatts

News See all

Read Cologix Acquires Carrier Hotel in Calgary, Canada
Cologix Acquires Carrier Hotel in Calgary, Canada

Cologix Acquires Carrier Hotel in Calgary, Canada

October 20, 2025 Cologix

US data center firm Cologix this week announced its acquisition of DataHiveOne, Calgary’s primary carrier hotel, as well as most of DataHive’s colocation and interconnection assets. The move marks Cologix's first move into Calgary."This acquisition is a pivotal step in our continued investment in...

Read more
Read Cologix Takes Full Ownership of Two Toronto Facilities
Cologix Takes Full Ownership of Two Toronto Facilities

Cologix Takes Full Ownership of Two Toronto Facilities

September 20, 2025 Cologix

Cologix has taken full ownership of two data centers it occupies in Toronto, Canada. The Stonepeak-backed company acquired full ownership of TOR4, a purpose-built hyperscale data center in Toronto, from CIM Group. Located on a 3.4-acre site in Markham, Ontario, the 11MW, 50,000 sq ft (4,645 sqm)...

Read more
Read Cologix completes latest data center in Columbus, Ohio
Cologix completes latest data center in Columbus, Ohio

Cologix completes latest data center in Columbus, Ohio

May 22, 2024 Cologix

Cologix, this week announced the completion of COL4. Set on a seven-acre campus, the facility spans 256,000 square feet, offering 50MW across three data halls.“Over 10 years ago, we recognized Columbus’ importance as a technology hub for growing companies and decided to enter this market,” said...

Read more
Read Cologix reveals a new data space at the 511 carrier hotel in Minneapolis, Minnesota
Cologix reveals a new data space at the 511 carrier hotel in Minneapolis, Minnesota

Cologix reveals a new data space at the 511 carrier hotel in Minneapolis, Minnesota

July 14, 2023 Cologix

Cologix is expanding its data center in Minneapolis, Minnesota, by adding a new data hall. With the new MIN5 data center now available for pre-leasing, the company has increased its presence in the Minneapolis, Minnesota, market. Located in the 511 Building carrier hotel, also known as the...

Read more
Read Cologix completes its Scalelogix Data Center
Cologix completes its Scalelogix Data Center

Cologix completes its Scalelogix Data Center

June 16, 2023 Cologix

Cologix has announced the completion of its new 120 MW facility in Data Center Alley, Ashburn, Virginia. The three-story data center spans 455,000 sqft, and has already been pre-leased, to a tenant described as a 'major global technology company.' According to reports, the Scalelogix ASH1...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?