Bresco Broadband: 423 E Town St

Latest Podcast 423 E Town St
Operational
Fully operational facility
Operated by:

Bresco Broadband: 423 E Town St

Year Built: 2017
Ownership: Bresco Broadband owns the building.
░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░░ Request Dataset MW
Operational Power

Bresco Broadband's Columbus 2 data center is in the two-story building at 423 East Town Street that also serves as the company's headquarters. Bresco opened it in 2017 as one of its two central Ohio data centers. Ohio Gig acquired Bresco in 2023, and 614 GIG Real Estate Holdings bought the building in August 2024.

Site History

  • In August 2024, 614 GIG Real Estate Holdings bought the building.
  • In 2023, Ohio Gig acquired Bresco Broadband.
  • In 2017, Bresco opened the data center.

Map and Nearby Locations

423 E Town St ( Suite 100 )
Bresco Broadband Sites
Nearby Facilities

Bresco Broadband: 423 E Town St Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Bresco Broadband: 423 E Town St

Distance Site About
0.45 miles Zayo: 101 E Town St
Zayo operates a colocation data center on the third floor of 101 East Town Street in downtown Columbus, Ohio, a facility founded as Datacenter101.
0.46 miles CENTRA: 180 East Broad (CMH01)
0.46 miles US Signal Columbus
DC power w/battery backup available
Multiple diverse power feeds from utility grids
0.53 miles Racksquared 325 E Spring St
0.58 miles AT&T: Columbus Downtown (CLMBOH11)
AT&T's Columbus Downtown central office at 111 North Fourth Street is the main telephone switching hub and access tandem for the Columbus area.
0.65 miles Lumen: 226 North Fifth
0.66 miles Verizon Wireless: Columbus MSC
Verizon Wireless runs a mobile switching center at 289 East Naghten Street in downtown Columbus, Ohio.
0.66 miles WOW! 226 N 5th
WOW!'s Columbus datacenter was acquired in 2013 from Bluemile assets. The site offers 26,00sqft and can expand to 52,00 sqft.
0.67 miles CityNet Columbus
0.68 miles Cogent: 240 North 5th
0.70 miles Lumen: 266 North 5th
1.12 miles Cogent: Columbus 2 (161 E Goodale)
Cogent operates a small data center at 161 East Goodale Street in Columbus, Ohio, in a former Sprint network building.
4.38 miles Ohio DAS: State of Ohio Computer Center
The State of Ohio Computer Center is the state government's main data center, on the west edge of The Ohio State University campus in Columbus.
4.50 miles Government Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
6.25 miles Racksquared 2560 Value Way
7.04 miles Kyndryl: Columbus
7.05 miles Station PlusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
7.45 miles Ridge PrimeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
7.46 miles GlobalInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
7.50 miles CeraNet Columbus
7.67 miles Edge ValleyInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
7.82 miles Campus PlusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
7.84 miles AEP: Groveport
American Electric Power's Groveport data center is a backup and disaster-recovery facility on South Hamilton Road, linked to AEP's primary data center in New Albany, Ohio.
7.86 miles North PlazaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
8.15 miles Center UltraInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
8.20 miles BetaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
8.25 miles PrimeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
8.28 miles PointInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
8.30 miles Expedient Upper Arlington
8.32 miles Hub PrimeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
8.34 miles MetroInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
8.41 miles GammaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
8.92 miles eNET Columbus
9.30 miles Carrier-Neutral Data CenterInterested in this information?Contact us
9.35 miles DataCanopy: Columbus
9.62 miles Cogent: Columbus 3 Edge
Cogent operates a small edge data center at 6520 Proprietors Road in Worthington, north of Columbus, Ohio.
9.73 miles AT&T: Worthington (WOTNOH88)
AT&T's Worthington central office on North High Street is a telephone exchange and tandem switching hub serving the northern Columbus suburbs.
9.76 miles Connect Data Centers: Hilliard, OH
US involvement from Oppidan's Hilliard data center spans 89,954 sqft. Oppidan lists Connect Data Centers as a subsidiary.
10.06 miles LexisNexis: Hilliard
LexisNexis runs a hosted data center inside the former MCI office campus, now owned by Verizon, on Britton Parkway in Hilliard, west of Columbus, Ohio.
10.28 miles TwoInterested in this information?Contact us
10.33 miles Metro CampusInterested in this information?Contact us
10.35 miles HubInterested in this information?Contact us
10.40 miles RidgeInterested in this information?Contact us
10.44 miles Valley PlusInterested in this information?Contact us
10.72 miles Karis: Galloway, Ohio
Karis Critical's proposed data center project on 127 acres in Prairie Township, Ohio, remains strictly in a "land-banked" planning phase, with no formal development or construction application submitted to local authorities.
10.80 miles Cologix COL3
10.80 miles Cologix Columbus COL1, COL2
COL1 (32,000sqft) and COL2 (20,000sqft) represent 2 phases of buildout in the same building. Cologix entered the Columbus market in February of 2014 through an acquisition of DataCenter.BZ
10.93 miles T-Mobile: Columbus MSC
T-Mobile runs a mobile switching center on Alta View Boulevard in north Columbus, Ohio.
10.96 miles Cologix Columbus COL4
COL4 is a three-hall colocation data center that Cologix completed in May 2024 on Alta View Boulevard in north Columbus, Ohio, next to its COL1-3 facilities.
10.97 miles Lambda: Columbus COL4
Lambda runs GPU clusters in Cologix's COL4 data center in north Columbus, Ohio.
11.56 miles WeConnect Westerville
11.61 miles CampusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
11.66 miles Valley MaxInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
11.70 miles SouthInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
11.75 miles CoreInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
11.79 miles Tower PrimeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
11.99 miles DartPoints: Dublin, OH
The facility was previously operated by Metro Data Center LLC before being acquired by Dartpoints in October 2020.
12.27 miles Expedient Dublin (CMH2)
Offering 29,000 square foot of total floor space, Expedient’s Dublin data center is powered by redundant electric utility power feeds and 4 auto-cutover diesel generators
12.51 miles Point TwoInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
12.62 miles Resilience CMH II
Overwatch Capital and Japanese energy leader Idemitsu have launched a strategic partnership to develop 1 GW of data center capacity across the United States.
13.10 miles Centra: New Albany (CMH1)
CENTRA is building CMH1, a two-story data center on a 15.8-acre site on Central College Road in the New Albany International Business Park, Ohio.
13.26 miles MetroInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.37 miles Valley UltraInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.38 miles Station GammaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.50 miles Metro HubInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.53 miles Expedient: Lewis Center (CMH3)
Expedient's CMH3 is a Tier III data center in a former Nationwide facility at 281 East Powell Road in Lewis Center, north of Columbus, Ohio.
13.57 miles Discover Financial Services New Albany
13.62 miles Point UltraInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.63 miles Edged Energy: Columbus CMH01
Edged Energy data center spans 206,000 sq ft on a 15-acre parcel at 6385 New Albany Road East.
13.70 miles TJX Corporate Techno
13.72 miles Edge HubInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.75 miles AEP: New Albany
AEP (American Electric Power) operates this data center in the New Albany International Business Park, Ohio. Compass Datacenters built the single-story facility for AEP in 2015.
13.78 miles East HubInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.85 miles QTS: New Albany 2 DC2
QTS New Albany 2 is a two-building data center campus in New Albany, Ohio. New Albany 2 DC2 is located at 675 Beech Rd SW, Etna, OH.
13.94 miles Compugen New Albany
13.97 miles QTS: New Albany 2 DC1
New Albany 2 DC1 is the first of two buildings on the QTS New Albany 2 campus, at 785 Beech Rd SW, Pataskala (Etna Township), Ohio.
14.00 miles QTS: Babbitt Rd, New Albany
QTS Data Centers wants to build eight additional facilities spanning 3.2 million square feet on 240 acres on Babbitt and Miller roads. It will invest nearly $3 billion in those projects.
14.02 miles Central TowerInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.05 miles Aligned: Pataskala
Aligned Data Centers, is targeting Pataskala for its second development in the Buckeye State.
14.07 miles Station TwoInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.08 miles Stack: NAL01B
NAL01B is STACK's new building on its NAL01 campus on Souder Road, New Albany, Ohio.
14.11 miles EdgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.14 miles QTS: New Albany 1 DC2
QTS New Albany 1 is a two-building data center campus in New Albany, Ohio. The second building, New Albany 1 DC2, of the campus is located at 1275 Beech Rd SW, New Albany, OH.
14.16 miles UltraInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.18 miles Stack: NAL01A
STACK acquired the facility in October 2019 from Nationwide Insurance. Nationwide initially built the facility in 2008 for a cost of $96 million.
14.18 miles East PlazaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.20 miles QTS: New Albany 1 DC1
QTS New Albany 1 is a two-building data center campus in New Albany, Ohio. The first building of the campus is located at 1225 Beech Rd SW, New Albany, OH.
14.34 miles Center PlusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.38 miles Center UltraInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.49 miles Centersquare: Columbus CMH1
Centersquare's CMH1 is a single-story colocation data center in Lewis Center, north of Columbus, Ohio, that Centersquare took over with Cyxtera in 2024.
14.50 miles South CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.52 miles ProInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.64 miles Core ParkInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.65 miles Point ThreeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.67 miles DBT Data: 2214 Harrison Rd
DBT-Data bought 44 acres on Harrison Road SW in Jersey Township in March 2022 for a data center project. The land was sold in 2025 for a natural gas power plant.
14.69 miles Core RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.75 miles EdgeConneX: Ashville 2
Local officials in Ashville, Ohio, blocked the expansion of a proposed EdgeConneX data center in February 2026. Although the company owns an initial 200-acre plot, their request to annex an additional 490 acres was denied.
14.75 miles Valley ThreeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.79 miles EastInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.85 miles CentralInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.89 miles Station OneInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.89 miles CampusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.95 miles RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.95 miles Point ThreeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.98 miles TwoInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.54 miles EastInterested in this information?Contact us
15.60 miles Central CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.60 miles Point ProInterested in this information?Contact us
15.68 miles North ValleyInterested in this information?Contact us
15.69 miles Global CampusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.71 miles BetaInterested in this information?Contact us
15.72 miles Prime PlazaInterested in this information?Contact us
15.75 miles StationInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.76 miles East ParkInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.80 miles Park TwoInterested in this information?Contact us
15.82 miles North HubInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.88 miles EdgeConneX: Ashville 1
EdgeConneX is building two data centers on about 195 acres it owns in the Village of Ashville, Pickaway County, Ohio, with an on-site natural gas energy center.
15.91 miles PlusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.96 miles Vantage: OH13
This facility is a part of Vantage's New Albany data center campus in Ohio.
15.98 miles Cologix: COL5
Cologix is constructing a 60,000-square-foot, AI-ready facility, COL5, in Columbus, Ohio.
15.99 miles Plaza AlphaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.01 miles Cologix: COL6
This planned facility is part of Cologix COL5 campus in Columbus.
16.01 miles CloudInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.01 miles Lincoln Rackhouse: Silicon Heartland Innovation Park
16.05 miles Vantage: OH12
This facility is a part of Vantage's New Albany data center campus in Ohio.
16.13 miles South PlazaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.14 miles Vantage: OH11
Vantage has started work on its OH1 data center campus at 3475 Horizon Ct., which is inside the Silicon Heartland Innovation Park.
16.16 miles NorthInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.16 miles CoreInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.18 miles Station PrimeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.23 miles Core HubInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.27 miles EastInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.30 miles Edge StationInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.37 miles Hub OneInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.41 miles Hub ThreeInterested in this information?Contact us
16.44 miles Global ValleyInterested in this information?Contact us
16.45 miles HubInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.49 miles StationInterested in this information?Contact us
16.56 miles PrimeInterested in this information?Contact us
16.57 miles Tower PrimeInterested in this information?Contact us
16.57 miles Hyperscale Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.62 miles EdgeConnex: Johnstown South 1
EdgeConneX, a US data center operator, invested $137.2 million to acquire nearly 270 acres across multiple sites in Licking County.
16.70 miles Hyperscale Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.75 miles Hyperscale Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.75 miles Hyperscale Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.78 miles Hyperscale Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.80 miles EdgeConnex: Johnstown South 2
Phase II of EdgeConneX's Johnstown South Campus will see the construction of a new two-story 700,000 sq ft (65,030 sqm) building.
16.86 miles Hyperscale Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.89 miles East RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.90 miles Karis Critical: New Albany, OH
Data center developer Karis Critical has purchased 115 acres of land in New Albany, Ohio.
16.91 miles QTS: Miller Road, New Albany
QTS Data Centers wants to build eight additional facilities spanning 3.2 million square feet on 240 acres on Babbitt and Miller roads. It will invest nearly $3 billion in those projects.
16.93 miles CyrusOne: New Albany COL-1
CyrusOne has broken ground on a $150 million data center development in New Albany, Ohio.
16.93 miles CloudInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.98 miles South CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.03 miles Hub ThreeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.17 miles WestInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.38 miles Global CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.42 miles EdgeConnex: Johnstown North Campus
EdgeConnex acquired a 170.29-acre parcel of land for roughly $62.2 million, or about $365,017 per acre.
17.63 miles Cloud ValleyInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.63 miles EdgeConneX: Piper Farms
EdgeConneX bought about 136 acres on Johnstown-Utica Road and Green Chapel Road in Monroe Township, Licking County, Ohio, in November 2025 for future data center development.
18.34 miles R+L Carriers: Delaware, OH
R+L Carriers operates an enterprise data center on Greif Parkway in Delaware, Ohio, which a Roberts family company bought and updated in 2018 and 2019.
18.54 miles Citi: Midwest Data Center
Citi's Midwest Data Center is an enterprise data center Citigroup built at the Park at Greif in Liberty Township, Delaware County, north of Columbus, Ohio.
18.54 miles Cologix: Johnstown Expansion
18.79 miles Cologix: COL7
Cologix has acquired approximately 154 acres of land in Johnstown, Ohio, to develop a new, AI-ready data center campus.
18.91 miles Cologix: COL8
COL8 is a single-story, liquid-cooled data center under construction on Cologix's Johnstown campus in Licking County, Ohio.
19.33 miles Park PlusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us

Operating Company

Operated by:

Bresco Broadband is an internet, data and VoIP communications company based in downtown Columbus, Ohio, and owned by Ohio Gig since 2023. It runs a statewide fiber and fixed-wireless network serving business, multi-dwelling and residential customers. The company owns and operates two data centers in central Ohio and connects to more than 15 other regional facilities.

Bresco Broadband History:

  • In 2023, Ohio Gig acquired Bresco Broadband.
  • In 2017, Bresco opened two data centers in central Ohio.
  • Founded in 1999 in Columbus.
0
Facilities
0
Markets

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.