Racksquared 2560 Value Way

2560 Value Way Dr

Operated by:

Map and Nearby Locations:

2560 Value Way Dr
Click Map to begin Search

Sites within 15 miles of Racksquared 2560 Value Way

Show SqM
Distance Site About
2.67 miles eNET Columbus
5.40 miles WeConnect Westerville
5.47 miles Lumen: 580 North 4th
5.51 miles Cologix COL3
5.58 miles Cologix Columbus COL1, COL2
COL1 (32,000sqft) and COL2 (20,000sqft) represent 2 phases of buildout in the same building. Cologix entered the Columbus market in February of 2014 through an acquisition of DataCenter.BZ
5.64 miles Cologix Columbus COL4
Cologix is building COL4, a 256,000 square foot data center on 9 acres along Alta View and Worthington Woods boulevards in Ohio. This facility will offer 27 MW of capacity.
5.83 miles CityNet Columbus
5.83 miles Lumen: 266 North 5th
5.84 miles Cogent: 240 North 5th
5.86 miles Racksquared 325 E Spring St
5.87 miles Lumen: 226 North Fifth
5.87 miles WOW! 226 N 5th
WOW!'s Columbus datacenter was acquired in 2013 from Bluemile assets. The site offers 26,00sqft and can expand to 52,00 sqft.
6.16 miles US Signal Columbus
DC power w/battery backup available
Multiple diverse power feeds from utility grids
6.17 miles CENTRA: 180 East Broad (CMH01)
6.19 miles CeraNet Columbus
6.46 miles Crown Castle 101 E Town
Crown Castle acquired Lightower in 2017
6.83 miles Expedient Upper Arlington
8.22 miles Expedient: Lewis Center
Expedient data center Located at 281 E. Powell Road in Lewis Center township with The 102,000 sq ft (9,475 sqm) facility offers 3MW of initial power capacity that will be increased to 7.5 MW in the future.
8.24 miles Discover Financial Services New Albany
8.35 miles Edged Energy: New Albany, Ohio
Edged Energy is developing a data center in the Ohio city. the data center is expected to span 210,000 sq ft (19,510 sqm) on a 15-acre parcel at 6385 New Albany Road East.
8.55 miles TJX Corporate Techno
8.55 miles Compass New Albany
8.71 miles Compugen New Albany
8.87 miles Stack: NAL01 Future Expansion
STACK INFRASTRUCTURE plans to expand it's NAL01 campus, located at Souder Road, New Albany, OH. Upon completion, this facility will have an available power capacity of 48 megawatts.
9.00 miles STACK New Albany NAL01
STACK acquired the facility in October 2019 from Nationwide Insurance. Nationwide initially built the facility in 2008 for a cost of $96 million.
9.07 miles Cyxtera Columbus CMH1
DCI Technology Holdings owns the building and is CenturyLink's landlord
9.70 miles Google New Albany Ohio
9.73 miles Amazon: 5117 Hayden Run
9.73 miles Amazon: 5113 Hayden Run
9.76 miles Amazon Hilliard: 5109 Hayden Run
9.78 miles QTS: Babbitt Rd, New Albany
QTS Data Centers wants to build eight additional facilities spanning 3.2 million square feet on 240 acres on Babbitt and Miller roads. It will invest nearly $3 billion in those projects.
10.08 miles DartPoints Dublin
The facility was previously operated by Metro Data Center LLC before being acquired by Dartpoints in October 2020.
10.31 miles QTS: New Albany 1 DC1
QTS is planning to build four-building data center campus in New Albany, Ohio. The first building of the campus will be located at 1225 Beech Rd SW, New Albany, OH . New Albany 1 will offer 144MW across two facilities.
10.38 miles IBM Columbus
10.40 miles QTS: New Albany 2 DC1
QTS is planning to build four-building data center campus in New Albany, Ohio. New Albany 2 DC1 will be located at 785 Beech Rd SW, Pataskala, OH. New Albany 2 will offer 78MW critical power capacity across two facilities.
10.53 miles QTS: New Albany 1 DC2
QTS is planning to build four-building data center campus in New Albany, Ohio. The second building, New Albany 1 DC2, of the campus will be located at 1275 Beech Rd SW, New Albany, OH. The buildings at the first site will reportedly span 885,600 sq ft (82,275 sqm).
10.61 miles QTS: New Albany 2 DC2
QTS is planning to build four-building data center campus in New Albany, Ohio. New Albany 2 DC2 will be located at 675 Beech Rd SW, Etna, OH. New Albany 2 will offer 78MW critical power capacity across two facilities.
10.63 miles Facebook New Albany Ohio
In August 2017, Facebook announced plans to build its first data center in the state in New Albany. The 970,000-square-foot facility is being constructed on 345 acres in the business park on the east side of Beech Road and south of the state Route 161 interchange.
10.65 miles Expedient Dublin
Offering 29,000 square foot of total floor space, Expedient’s Dublin data center is powered by redundant electric utility power feeds and 4 auto-cutover diesel generators
10.99 miles Microsoft: 3287 Beech Rd
Microsoft purchased 183 acres of land on Beech Road in New Albany in 2023 .
11.04 miles Amazon: CMH53
11.08 miles Amazon New Albany
11.10 miles Amazon New Albany: Jug and Beach Road
11.12 miles Amazon: CMH56
11.32 miles Amazon: CHM59
11.39 miles DBT Data: 2214 Harrison Rd
DBT Data acquired 44 acres of land in March 2022 with the intention of developing a data center project on the site.
11.43 miles Lincoln Rackhouse: Silicon Heartland Innovation Park
11.83 miles Amazon: Cosgray Campus
AWS is building its second data center campus in Hilliard, Ohio. The $200 million data center campus is located on a 104-acre site between Cosgray and Leppert roads.
11.84 miles Amazon: Cosgray 2
AWS is building its second data center campus in Hilliard, Ohio. The $200 million data center campus is located on a 104-acre site between Cosgray and Leppert roads.
11.85 miles Amazon: Cosgray 3
11.86 miles Amazon: Cosgray 4
11.91 miles Amazon New Albany: Innovation Campus Way
Amazon Web Services plans to invest $400 million to build a 170,000-square-foot data center on 100 acres in the eastern portion of the New Albany International Business Park
11.93 miles Compass Groveport AEP II
American Electric Power invested approximately $125 million into the data center on Hamilton Road
11.94 miles Amazon: Beech and Miller roads
Amazon will build five data centers and related buildings totaling 1.25 million square feet on 85 of the 439 acres the company bought along Beech and Miller roads in early 2023.
11.97 miles DBT Data: Jug & Harrison
DBT Data purchased 16 bordering parcels of land in New Albany, totaling a little over 82 acres and costing a little more than $23 million in January 2023.
12.11 miles QTS: Miller Road, New Albany
QTS Data Centers wants to build eight additional facilities spanning 3.2 million square feet on 240 acres on Babbitt and Miller roads. It will invest nearly $3 billion in those projects.
12.21 miles Amazon: 2675 Newton
12.22 miles Amazon: 2875 Newton
12.22 miles Amazon: 2775 Newton
12.27 miles Aligned: Pataskala
Aligned Data Centers, appears to be targeting Pataskala for its second development in the Buckeye State. Aligned broke into the Ohio market with a $202 million project in Sandusky.
12.27 miles Amazon: 2575 Newton
12.81 miles DBT Data: Jug & Mink Project
Washington DC-based DBT-Data plans to develop a data center at the New Albany International Business Park, close to Intel's upcoming chip fab site.
12.81 miles CyrusOne: New Albany, Ohio
CyrusOne is planning a $150 million data center development in New Albany, Ohio. The company will spend $100m on building the data center, and $50m on acquiring the land for the facility. The site is located at 12181 Jug St, Johnstown, OH .
13.32 miles Microsoft: Refugee Rd, Pataskala
Microsoft acquired 290 acres of land in Pataskala for $30.7 million.
13.56 miles Google Lockbourne, OH
In March 2021, Columbus City Council approved $54.3 million in tax incentives to develop a data center on the former Hartman Farm site.
13.61 miles Amazon: 6645 Crosby Ct
Amazon is building a five-building data center campus in New Albany, Ohio. Amazon 6645 Crosby Ct facility would be the fourth building of the campus with an area of 152,945 sqft.
13.63 miles Amazon: 6655 Crosby Ct
Amazon is building a five-building data center campus in New Albany, Ohio. Amazon 6655 Crosby Ct facility is the fourth building of the campus with an area of 152,945 sqft.
13.66 miles Amazon: 6665 Crosby Ct
Amazon is building a five-building data center campus in New Albany, Ohio. Amazon 6665 Crosby Ct facility is the third building of the campus with an area of 152945 sqft.
13.68 miles Amazon: 6675 Crosby Ct
Amazon is building a five-building data center campus in New Albany, Ohio. Amazon 6675 Crosby Ct facility is the second building of the campus with an area of 152945 sqft.
13.72 miles Amazon Crosby Campus
Amazon is building a five-building data center campus in New Albany, Ohio.
18.00 miles Amazon: 9905 State Route
The Amazon.com subsidiary bought 234 acres at 9905 State Route 104 in Pickaway County, which is about 9 miles away from Rickenbacker International Airport.