AT&T: Worthington (WOTNOH88)

Latest Podcast 6650 N High St
Operational
Fully operational facility
Operated by:

AT&T: Worthington (WOTNOH88)

Year Built: 1963
Ownership: AT&T owns the building.
░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░░ Request Dataset MW
Operational Power

AT&T's Worthington exchange at 6650 North High Street houses a host switch and one of the two access tandems in the Columbus area. Ohio Bell built it in 1963.

Site History

  • In 1963, Ohio Bell completed the building.

Map and Nearby Locations

6650 N High St
AT&T Sites
Nearby Facilities

Sites within 15 miles of AT&T: Worthington (WOTNOH88)

Distance Site About
0.70 miles Cogent: Columbus 3 Edge
Cogent operates a small edge data center at 6520 Proprietors Road in Worthington, north of Columbus, Ohio.
1.37 miles Cologix Columbus COL1, COL2
COL1 (32,000sqft) and COL2 (20,000sqft) represent 2 phases of buildout in the same building. Cologix entered the Columbus market in February of 2014 through an acquisition of DataCenter.BZ
1.41 miles Cologix COL3
1.51 miles T-Mobile: Columbus MSC
T-Mobile runs a mobile switching center on Alta View Boulevard in north Columbus, Ohio.
1.61 miles Cologix Columbus COL4
COL4 is a three-hall colocation data center that Cologix completed in May 2024 on Alta View Boulevard in north Columbus, Ohio, next to its COL1-3 facilities.
1.62 miles Lambda: Columbus COL4
Lambda runs GPU clusters in Cologix's COL4 data center in north Columbus, Ohio.
3.84 miles Expedient: Lewis Center (CMH3)
Expedient's CMH3 is a Tier III data center in a former Nationwide facility at 281 East Powell Road in Lewis Center, north of Columbus, Ohio.
4.12 miles WeConnect Westerville
4.27 miles eNET Columbus
4.40 miles Expedient Upper Arlington
4.83 miles Centersquare: Columbus CMH1
Centersquare's CMH1 is a single-story colocation data center in Lewis Center, north of Columbus, Ohio, that Centersquare took over with Cyxtera in 2024.
5.04 miles Racksquared 2560 Value Way
6.21 miles DartPoints: Dublin, OH
The facility was previously operated by Metro Data Center LLC before being acquired by Dartpoints in October 2020.
6.32 miles Cologix: COL5
Cologix is constructing a 60,000-square-foot, AI-ready facility, COL5, in Columbus, Ohio.
6.35 miles Cologix: COL6
This planned facility is part of Cologix COL5 campus in Columbus.
6.68 miles Ohio DAS: State of Ohio Computer Center
The State of Ohio Computer Center is the state government's main data center, on the west edge of The Ohio State University campus in Columbus.
6.68 miles Connect Data Centers: Hilliard, OH
US involvement from Oppidan's Hilliard data center spans 89,954 sqft. Oppidan lists Connect Data Centers as a subsidiary.
6.69 miles Edge HubInterested in this information?Contact us
6.74 miles Expedient Dublin (CMH2)
Offering 29,000 square foot of total floor space, Expedient’s Dublin data center is powered by redundant electric utility power feeds and 4 auto-cutover diesel generators
6.79 miles Park AlphaInterested in this information?Contact us
6.83 miles Park ProInterested in this information?Contact us
6.83 miles Central RidgeInterested in this information?Contact us
6.83 miles North HubInterested in this information?Contact us
6.84 miles LexisNexis: Hilliard
LexisNexis runs a hosted data center inside the former MCI office campus, now owned by Verizon, on Britton Parkway in Hilliard, west of Columbus, Ohio.
7.79 miles OneInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
7.84 miles West PlazaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
7.87 miles Core RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
7.92 miles UltraInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
7.96 miles Core PointInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
8.13 miles HubInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
8.13 miles Ridge UltraInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
8.61 miles R+L Carriers: Delaware, OH
R+L Carriers operates an enterprise data center on Greif Parkway in Delaware, Ohio, which a Roberts family company bought and updated in 2018 and 2019.
8.69 miles Cogent: Columbus 2 (161 E Goodale)
Cogent operates a small data center at 161 East Goodale Street in Columbus, Ohio, in a former Sprint network building.
8.81 miles Citi: Midwest Data Center
Citi's Midwest Data Center is an enterprise data center Citigroup built at the Park at Greif in Liberty Township, Delaware County, north of Columbus, Ohio.
9.04 miles Plaza AlphaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.06 miles Global CampusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.08 miles ValleyInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.10 miles Lumen: 266 North 5th
9.10 miles Valley MaxInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.10 miles Verizon Wireless: Columbus MSC
Verizon Wireless runs a mobile switching center at 289 East Naghten Street in downtown Columbus, Ohio.
9.11 miles Cogent: 240 North 5th
9.12 miles CityNet Columbus
9.14 miles WOW! 226 N 5th
WOW!'s Columbus datacenter was acquired in 2013 from Bluemile assets. The site offers 26,00sqft and can expand to 52,00 sqft.
9.14 miles Lumen: 226 North Fifth
9.22 miles Racksquared 325 E Spring St
9.31 miles AT&T: Columbus Downtown (CLMBOH11)
AT&T's Columbus Downtown central office at 111 North Fourth Street is the main telephone switching hub and access tandem for the Columbus area.
9.45 miles US Signal Columbus
DC power w/battery backup available
Multiple diverse power feeds from utility grids
9.45 miles CENTRA: 180 East Broad (CMH01)
9.65 miles Station OneInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.66 miles EastInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.66 miles Global CampusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.67 miles Center BetaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.70 miles CloudInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.73 miles Bresco Broadband: 423 E Town St
Bresco Broadband runs a data center in its downtown Columbus headquarters building at 423 East Town Street, Ohio.
9.74 miles Zayo: 101 E Town St
Zayo operates a colocation data center on the third floor of 101 East Town Street in downtown Columbus, Ohio, a facility founded as Datacenter101.
9.77 miles East RidgeInterested in this information?Contact us
9.84 miles Core ParkInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.89 miles HubInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.93 miles West RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.96 miles TowerInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
10.04 miles Government Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
10.33 miles Centra: New Albany (CMH1)
CENTRA is building CMH1, a two-story data center on a 15.8-acre site on Central College Road in the New Albany International Business Park, Ohio.
10.60 miles Valley PlusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
10.62 miles Edged Energy: Columbus CMH01
Edged Energy data center spans 206,000 sq ft on a 15-acre parcel at 6385 New Albany Road East.
10.68 miles WestInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
10.69 miles Kyndryl: Columbus
10.71 miles Discover Financial Services New Albany
10.74 miles Edge ValleyInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
10.82 miles Edge CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
10.88 miles TJX Corporate Techno
10.97 miles AEP: New Albany
AEP (American Electric Power) operates this data center in the New Albany International Business Park, Ohio. Compass Datacenters built the single-story facility for AEP in 2015.
11.16 miles CeraNet Columbus
11.19 miles Compugen New Albany
11.25 miles Stack: NAL01B
NAL01B is STACK's new building on its NAL01 campus on Souder Road, New Albany, Ohio.
11.41 miles Stack: NAL01A
STACK acquired the facility in October 2019 from Nationwide Insurance. Nationwide initially built the facility in 2008 for a cost of $96 million.
12.12 miles Hub OneInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.11 miles QTS: Babbitt Rd, New Albany
QTS Data Centers wants to build eight additional facilities spanning 3.2 million square feet on 240 acres on Babbitt and Miller roads. It will invest nearly $3 billion in those projects.
13.22 miles South PointInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.25 miles South TowerInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.26 miles Karis: Galloway, Ohio
Karis Critical's proposed data center project on 127 acres in Prairie Township, Ohio, remains strictly in a "land-banked" planning phase, with no formal development or construction application submitted to local authorities.
13.49 miles Central RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.57 miles Edge CampusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.58 miles Park OneInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.59 miles Ridge PrimeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.60 miles Metro RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.65 miles CoreInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.65 miles BetaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.76 miles TowerInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.77 miles South PlazaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.78 miles North CampusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.79 miles GammaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.80 miles CoreInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.85 miles QTS: New Albany 1 DC1
QTS New Albany 1 is a two-building data center campus in New Albany, Ohio. The first building of the campus is located at 1225 Beech Rd SW, New Albany, OH.
13.86 miles QTS: New Albany 1 DC2
QTS New Albany 1 is a two-building data center campus in New Albany, Ohio. The second building, New Albany 1 DC2, of the campus is located at 1275 Beech Rd SW, New Albany, OH.
13.97 miles Plaza TwoInterested in this information?Contact us
13.97 miles Central CampusInterested in this information?Contact us
13.98 miles CampusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.98 miles BetaInterested in this information?Contact us
13.98 miles TowerInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.01 miles Valley PlusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.07 miles QTS: New Albany 2 DC1
New Albany 2 DC1 is the first of two buildings on the QTS New Albany 2 campus, at 785 Beech Rd SW, Pataskala (Etna Township), Ohio.
14.08 miles Global HubInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.09 miles QTS: New Albany 2 DC2
QTS New Albany 2 is a two-building data center campus in New Albany, Ohio. New Albany 2 DC2 is located at 675 Beech Rd SW, Etna, OH.
14.09 miles PointInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.16 miles Hyperscale Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.19 miles Karis Critical: New Albany, OH
Data center developer Karis Critical has purchased 115 acres of land in New Albany, Ohio.
14.19 miles Hyperscale Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.21 miles GammaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.21 miles East PointInterested in this information?Contact us
14.21 miles ProInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.21 miles Vantage: OH13
This facility is a part of Vantage's New Albany data center campus in Ohio.
14.22 miles Hyperscale Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.23 miles Vantage: OH12
This facility is a part of Vantage's New Albany data center campus in Ohio.
14.24 miles Vantage: OH11
Vantage has started work on its OH1 data center campus at 3475 Horizon Ct., which is inside the Silicon Heartland Innovation Park.
14.24 miles Hyperscale Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.24 miles Station PlusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.24 miles Lincoln Rackhouse: Silicon Heartland Innovation Park
14.25 miles Ridge OneInterested in this information?Contact us
14.26 miles Plaza BetaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.28 miles Plaza MaxInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.29 miles NorthInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.31 miles BetaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.32 miles UltraInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.32 miles Hyperscale Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.33 miles Global TowerInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.34 miles Hyperscale Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.36 miles SouthInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.41 miles Point BetaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.62 miles QTS: Miller Road, New Albany
QTS Data Centers wants to build eight additional facilities spanning 3.2 million square feet on 240 acres on Babbitt and Miller roads. It will invest nearly $3 billion in those projects.
14.74 miles WestInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.78 miles North TowerInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.79 miles DBT Data: 2214 Harrison Rd
DBT-Data bought 44 acres on Harrison Road SW in Jersey Township in March 2022 for a data center project. The land was sold in 2025 for a natural gas power plant.
14.82 miles Valley UltraInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.82 miles Hub AlphaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.86 miles EdgeConneX: Piper Farms
EdgeConneX bought about 136 acres on Johnstown-Utica Road and Green Chapel Road in Monroe Township, Licking County, Ohio, in November 2025 for future data center development.
14.87 miles ThreeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.03 miles Prime StationInterested in this information?Contact us
15.03 miles ThreeInterested in this information?Contact us
15.03 miles ThreeInterested in this information?Contact us
15.18 miles Hub ThreeInterested in this information?Contact us
15.28 miles PlusInterested in this information?Contact us
15.37 miles Core HubInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.54 miles EdgeConnex: Johnstown South 1
EdgeConneX, a US data center operator, invested $137.2 million to acquire nearly 270 acres across multiple sites in Licking County.
15.66 miles EdgeConnex: Johnstown South 2
Phase II of EdgeConneX's Johnstown South Campus will see the construction of a new two-story 700,000 sq ft (65,030 sqm) building.
15.70 miles CyrusOne: New Albany COL-1
CyrusOne has broken ground on a $150 million data center development in New Albany, Ohio.
15.75 miles EdgeConnex: Johnstown North Campus
EdgeConnex acquired a 170.29-acre parcel of land for roughly $62.2 million, or about $365,017 per acre.
15.96 miles Cologix: Johnstown Expansion
16.07 miles Cologix: COL7
Cologix has acquired approximately 154 acres of land in Johnstown, Ohio, to develop a new, AI-ready data center campus.
16.23 miles Cologix: COL8
COL8 is a single-story, liquid-cooled data center under construction on Cologix's Johnstown campus in Licking County, Ohio.
16.26 miles Hub TwoInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.66 miles AEP: Groveport
American Electric Power's Groveport data center is a backup and disaster-recovery facility on South Hamilton Road, linked to AEP's primary data center in New Albany, Ohio.
16.68 miles Ridge GammaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.75 miles Carrier-Neutral Data CenterInterested in this information?Contact us
17.04 miles Aligned: Pataskala
Aligned Data Centers, is targeting Pataskala for its second development in the Buckeye State.
17.08 miles Prime RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.10 miles Core HubInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.29 miles South RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.47 miles Global PlazaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.49 miles AlphaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.96 miles West CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.23 miles Center BetaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.33 miles OneInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.39 miles Tower ProInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.90 miles Hyperscale Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.08 miles DataCanopy: Columbus

Operating Company

Operated by:
0
Facilities
0
Markets

News See all

Read AT&T Partners with AWS and Amazon Leo
AT&T Partners with AWS and Amazon Leo

AT&T Partners with AWS and Amazon Leo

February 05, 2026 AT&T

US telecoms firm AT&T is partnering with Amazon’s cloud and satellite units. The former will move more workloads to the cloud and utilize Amazon’s satellite fleet, while the cloud provider will benefit from new fiber connectivity between its data centers."This collaboration with AWS...

Read more
Read AT&T Expects Billion-Dollar Tax Windfall
AT&T Expects Billion-Dollar Tax Windfall

AT&T Expects Billion-Dollar Tax Windfall

July 26, 2025 AT&T

AT&T CEO John Stankey views President Donald Trump’s recently passed budget as a financial windfall for the telecommunications space and teased an appetite for more fiber to feed growing market opportunities around its wired and wireless broadband services.“I've not seen the situation...

Read more
Read AT&T snaps up $1bn worth of spectrum from UScellular
AT&T snaps up $1bn worth of spectrum from UScellular

AT&T snaps up $1bn worth of spectrum from UScellular

November 09, 2024 AT&T

UScellular has confirmed that it will sell a portion of its spectrum assets to AT&T for $1 billion. This deal will see T-Mobile acquire a significant chunk of UScellular's operations, including its customer base and around 30 percent of the company's wireless spectrum."We are...

Read more
Read FCC rules in favor of AT&T's FirstNet over 4.9 GHz spectrum usage
FCC rules in favor of AT&T's FirstNet over 4.9 GHz spectrum usage

FCC rules in favor of AT&T's FirstNet over 4.9 GHz spectrum usage

October 28, 2024 AT&T

The Federal Communications Commission (FCC) has voted to transfer control of a chunk of the 4.9 GHz spectrum band to FirstNet, which operates a network for first responders that AT&T uses. The FCC voted 4-0 in favor of handing the spectrum to FirstNet. Commissioner Anna Gomez did not...

Read more
Read FirstNet and AT&T announces $8 billion investment
FirstNet and AT&T announces  $8 billion investment

FirstNet and AT&T announces $8 billion investment

February 15, 2024 AT&T

US operator AT&T and the First Responder Network Authority (FirstNet) have announced a ten-year, $8 billion investment to expand and upgrade the nationwide public safety network. FirstNet will invest $6.3 billion through its network contract with AT&T and "anticipates an additional...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.