US Signal Columbus

Latest Podcast
180 E. Broad St. Columbus
Operational
Fully operational facility
Operated by:

US Signal Columbus

░░░ Request Dataset MW
Total Power

Located in close proximity to I-70, I-71, and I-670, the Columbus, Ohio data center is an ideal location due to its strategic geographic position with low risk of earthquakes, floods, hurricanes, and power loss.

Power

  • 200a 480V 3 phase
  • DC power w/battery backup available
  • Multiple diverse power feeds from utility grids
  • Power capacity and power quality monitored by US Signal TOC

Cooling

  • 10 tons of cooling via Liebert units
  • Temperature and humidity monitored by US Signal TOC

Fire Suppression

  • Halon dry fire suppression throughout the space
  • Photoelectric fire sensors throughout the space

Security

  • RFID access readers on all doors
  • Digital video surveillance monitored live in US Signal TOC, recordings kept for at least 90 days

Map and Nearby Locations:

180 E. Broad St. Columbus
US Signal Sites
Nearby Facilities

Sites within 15 miles of US Signal Columbus

Distance Site About
0.00 miles CENTRA: 180 East Broad (CMH01)
0.30 miles Crown Castle 101 E Town
Crown Castle acquired Lightower in 2017
0.31 miles WOW! 226 N 5th
WOW!'s Columbus datacenter was acquired in 2013 from Bluemile assets. The site offers 26,00sqft and can expand to 52,00 sqft.
0.31 miles Lumen: 226 North Fifth
0.31 miles Racksquared 325 E Spring St
0.34 miles Cogent: 240 North 5th
0.35 miles CityNet Columbus
0.36 miles Lumen: 266 North 5th
0.39 miles Carrier-Neutral Data Center Request Dataset
0.81 miles Lumen: 580 North 4th
6.17 miles Racksquared 2560 Value Way
6.65 miles Kyndryl Columbus
7.67 miles Hyperscale Data Center Request Dataset
This data center is part of Google's Lockbourne Campus in Ohio.
7.67 miles Hyperscale Data Center Request Dataset
In March 2021, Columbus City Council approved $54.3 million in tax incentives to develop a data center on the former Hartman Farm site.
7.69 miles Hyperscale Data Center Request Dataset
Amazon is constructing its third data center campus in Hilliard at the intersection of Scioto Darby Road and the Interstate 270 overpass.
7.74 miles Hyperscale Data Center Request Dataset
The complex will comprise seven buildings for data center operations and an additional structure for security and utilities.
7.80 miles Hyperscale Data Center Request Dataset
Amazon is constructing its third data center campus in Hilliard at the intersection of Scioto Darby Road and the Interstate 270 overpass.
7.81 miles CeraNet Columbus
7.83 miles Hyperscale Data Center Request Dataset
Amazon is constructing its third data center campus in Hilliard at the intersection of Scioto Darby Road and the Interstate 270 overpass.
7.88 miles Hyperscale Data Center Request Dataset
Amazon is constructing its third data center campus in Hilliard at the intersection of Scioto Darby Road and the Interstate 270 overpass.
7.89 miles Hyperscale Data Center Request Dataset
This data center is part of Google's Lockbourne Campus in Ohio.
7.89 miles Expedient Upper Arlington
7.99 miles Hyperscale Data Center Request Dataset
Amazon is constructing its third data center campus in Hilliard at the intersection of Scioto Darby Road and the Interstate 270 overpass.
8.05 miles Hyperscale Data Center Request Dataset
This data center is a part of Google's Lockbourne Campus in Ohio.
8.08 miles Hyperscale Data Center Request Dataset
This data center is a part of Google's Lockbourne Campus in Ohio.
8.25 miles Compass Groveport AEP II
American Electric Power invested approximately $125 million into the data center on Hamilton Road
8.82 miles eNET Columbus
9.17 miles Carrier-Neutral Data Center Request Dataset
9.31 miles Connect Data Centers: Hilliard, OH
US involvement from Oppidan's Hilliard data center spans 89,954 sqft. Oppidan lists Connect Data Centers as a subsidiary.
9.64 miles DataCanopy: Columbus
9.84 miles Hyperscale Data Center Request Dataset
9.89 miles Hyperscale Data Center Request Dataset
9.90 miles Hyperscale Data Center Request Dataset
9.95 miles Hyperscale Data Center Request Dataset
10.00 miles Hyperscale Data Center Request Dataset
10.55 miles Cologix COL3
10.60 miles Cologix Columbus COL1, COL2
COL1 (32,000sqft) and COL2 (20,000sqft) represent 2 phases of buildout in the same building. Cologix entered the Columbus market in February of 2014 through an acquisition of DataCenter.BZ
10.73 miles Cologix Columbus COL4
Cologix is building COL4, a 256,000 square foot data center on 9 acres along Alta View and Worthington Woods boulevards in Ohio. This facility will offer 27 MW of capacity.
11.15 miles Hyperscale Data Center Request Dataset
Amazon's second data center campus in Hilliard, Ohio, is situated on a 104-acre site between Cosgray and Leppert roads.
11.20 miles Hyperscale Data Center Request Dataset
This data center is a part of amazon's Cosgray Road Campus in Hilliard, Ohio.
11.24 miles Hyperscale Data Center Request Dataset
This data center is a part of amazon's Cosgray Road Campus in Hilliard, Ohio.
11.29 miles Hyperscale Data Center Request Dataset
This data center is a part of amazon's Cosgray Road Campus in Hilliard, Ohio.
11.42 miles WeConnect Westerville
11.62 miles DartPoints: Dublin, OH
The facility was previously operated by Metro Data Center LLC before being acquired by Dartpoints in October 2020.
11.84 miles Expedient Dublin
Offering 29,000 square foot of total floor space, Expedient’s Dublin data center is powered by redundant electric utility power feeds and 4 auto-cutover diesel generators
11.96 miles Hyperscale Data Center Request Dataset
The Amazon.com subsidiary bought 234 acres at 9905 State Route 104 in Pickaway County, which is about 9 miles away from Rickenbacker International Airport.
13.07 miles Resilience CMH II
Overwatch Capital and Japanese energy leader Idemitsu have launched a strategic partnership to develop 1 GW of data center capacity across the United States.
13.26 miles Expedient: Lewis Center
Expedient data center Located at 281 E. Powell Road in Lewis Center township with The 102,000 sq ft (9,475 sqm) facility offers 3MW of initial power capacity that will be increased to 7.5 MW in the future.
13.41 miles Hyperscale Data Center Request Dataset
This facility is part of Google's New Albany campus in Ohio.
13.54 miles Hyperscale Data Center Request Dataset
This facility is part of Google's New Albany campus in Ohio.
13.60 miles Hyperscale Data Center Request Dataset
This facility is part of Google's New Albany campus in Ohio.
13.61 miles Discover Financial Services New Albany
13.74 miles Hyperscale Data Center Request Dataset
This facility is part of Google's New Albany campus in Ohio.
13.77 miles Edged Energy: Columbus CMH01
Edged Energy data center spans 206,000 sq ft on a 15-acre parcel at 6385 New Albany Road East.
13.85 miles Hyperscale Data Center Request Dataset
This facility is part of Google's New Albany campus in Ohio.
13.87 miles Compass New Albany
13.89 miles TJX Corporate Techno
13.95 miles Hyperscale Data Center Request Dataset
This facility is part of Google's New Albany campus in Ohio.
14.01 miles Hyperscale Data Center Request Dataset
The campus is located on a 447-acre site on the west side of Beech Road, south of the state Route 161 interchange.
14.02 miles Compugen New Albany
14.09 miles QTS: New Albany 2 DC2
QTS New Albany 2 is a two-building data center campus in New Albany, Ohio. New Albany 2 DC2 is located at 675 Beech Rd SW, Etna, OH.
14.20 miles Stack: NAL01B
STACK INFRASTRUCTURE is expanding it's NAL01 campus, located at Souder Road, New Albany, OH.
14.20 miles QTS: Babbitt Rd, New Albany
QTS Data Centers wants to build eight additional facilities spanning 3.2 million square feet on 240 acres on Babbitt and Miller roads. It will invest nearly $3 billion in those projects.
14.21 miles QTS: New Albany 2 DC1
QTS New Albany 2 is a two-building data center campus in New Albany, Ohio. New Albany 2 DC1 is located at 785 Beech Rd SW, Pataskala, OH.
14.23 miles Aligned: Pataskala
Aligned Data Centers, is targeting Pataskala for its second development in the Buckeye State.
14.23 miles Centersquare: Columbus CMH1
DCI Technology Holdings owns the building and is CenturyLink's landlord.
14.26 miles Hyperscale Data Center Request Dataset
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
14.29 miles STACK New Albany NAL01
STACK acquired the facility in October 2019 from Nationwide Insurance. Nationwide initially built the facility in 2008 for a cost of $96 million.
14.31 miles Hyperscale Data Center Request Dataset
Amazon is building a five-building data center campus in New Albany, Ohio. Amazon 6645 Crosby Ct facility would be the fourth building of the campus with an area of 152,945 sqft.
14.31 miles Hyperscale Data Center Request Dataset
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
14.34 miles Hyperscale Data Center Request Dataset
Amazon is building a five-building data center campus in New Albany, Ohio. Amazon 6655 Crosby Ct facility is the fourth building of the campus with an area of 152,945 sqft.
14.36 miles Hyperscale Data Center Request Dataset
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
14.36 miles QTS: New Albany 1 DC2
QTS New Albany 1 is a two-building data center campus in New Albany, Ohio. The second building, New Albany 1 DC2, of the campus is located at 1275 Beech Rd SW, New Albany, OH.
14.40 miles Hyperscale Data Center Request Dataset
Amazon is building a five-building data center campus in New Albany, Ohio. Amazon 6665 Crosby Ct facility is the third building of the campus with an area of 152945 sqft.
14.40 miles Hyperscale Data Center Request Dataset
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
14.42 miles QTS: New Albany 1 DC1
QTS New Albany 1 is a two-building data center campus in New Albany, Ohio. The first building of the campus is located at 1225 Beech Rd SW, New Albany, OH.
14.43 miles Hyperscale Data Center Request Dataset
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
14.44 miles Hyperscale Data Center Request Dataset
Amazon is building a five-building data center campus in New Albany, Ohio. Amazon 6675 Crosby Ct facility is the second building of the campus with an area of 152945 sqft.
14.50 miles Hyperscale Data Center Request Dataset
Amazon is building a five-building data center campus in New Albany, Ohio.
14.58 miles Hyperscale Data Center Request Dataset
This data center is a part of Meta's New Albany Campus in Ohio.
14.62 miles Hyperscale Data Center Request Dataset
This data center is a part of Meta's New Albany Campus in Ohio.
14.85 miles Hyperscale Data Center Request Dataset
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
14.87 miles Hyperscale Data Center Request Dataset
Microsoft acquired 289 acres of land in Pataskala for $30.7 million.
14.87 miles Hyperscale Data Center Request Dataset
This data center is a part of Meta's New Albany Campus in Ohio.
14.88 miles Hyperscale Data Center Request Dataset
This data center is a part of Meta's New Albany Campus in Ohio.
14.91 miles Hyperscale Data Center Request Dataset
Meta operates a data center campus in New Albany, Ohio, located at 1 Community Circle. The New Albany site consists of five data centers, spanning a total of 2.5 million square feet.
15.13 miles Hyperscale Data Center Request Dataset
Meta's Prometheus data center campus, located in New Albany, Ohio, represents a major advancement in AI infrastructure.
15.16 miles DBT Data: 2214 Harrison Rd
DBT Data acquired 44 acres of land in March 2022 with the intention of developing a data center project on the site.
15.16 miles Hyperscale Data Center Request Dataset
Amazon's $200 million data center campus is situated on 111 acres at the southwest corner of Warner Road and Industrial Parkway.
15.22 miles Hyperscale Data Center Request Dataset
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
15.24 miles Hyperscale Data Center Request Dataset
Amazon's $200 million data center campus is situated on 111 acres at the southwest corner of Warner Road and Industrial Parkway.
15.27 miles Hyperscale Data Center Request Dataset
15.30 miles Hyperscale Data Center Request Dataset
Amazon's $200 million data center campus is situated on 111 acres at the southwest corner of Warner Road and Industrial Parkway.
15.32 miles Hyperscale Data Center Request Dataset
Microsoft expanded its Ohio footprint in 2024, purchasing an additional 43 acres in Pataskala for $11.44 million.
15.37 miles Hyperscale Data Center Request Dataset
Amazon's $200 million data center campus is situated on 111 acres at the southwest corner of Warner Road and Industrial Parkway.
15.38 miles EdgeConneX: Ashville, Ohio
The proposed EdgeConneX data center project in Pickaway County, Ohio, involves the development of 680 acres of farmland in the village of Ashville.
15.72 miles Cologix: Columbus COL5
Cologix is constructing a 60,000-square-foot, AI-ready facility, COL5, in Columbus, Ohio.
15.73 miles Hyperscale Data Center Request Dataset
15.75 miles Cologix: COL6
This planned facility is part of Cologix COL5 campus in Columbus.
15.79 miles Hyperscale Data Center Request Dataset
15.86 miles Hyperscale Data Center Request Dataset
15.91 miles Hyperscale Data Center Request Dataset
15.92 miles Hyperscale Data Center Request Dataset
Microsoft purchased 183 acres of land on Beech Road in New Albany in 2023.
15.98 miles Hyperscale Data Center Request Dataset
16.08 miles Hyperscale Data Center Request Dataset
This facility is part of Amazon's 3180 Beech Road Campus in New Albany.
16.10 miles EdgeConneX: Ashville 2
Local officials in Ashville, Ohio, blocked the expansion of a proposed EdgeConneX data center in February 2026. Although the company owns an initial 200-acre plot, their request to annex an additional 490 acres was denied.
16.14 miles Vantage: OH13
This facility is a part of Vantage's New Albany data center campus in Ohio.
16.16 miles Hyperscale Data Center Request Dataset
This facility is part of Amazon's 3180 Beech Road Campus in New Albany.
16.18 miles Hyperscale Data Center Request Dataset
This facility is part of Amazon's 3180 Beech Road Campus in New Albany.
16.19 miles Lincoln Rackhouse: Silicon Heartland Innovation Park
16.22 miles Vantage: OH12
This facility is a part of Vantage's New Albany data center campus in Ohio.
16.24 miles Hyperscale Data Center Request Dataset
Amazon Web Services plans to invest $400 million to build a 170,000-square-foot data center on 100 acres in the eastern portion of the New Albany International Business Park
16.29 miles Hyperscale Data Center Request Dataset
This facility is part of Amazon's 3180 Beech Road Campus in New Albany.
16.31 miles Vantage: New Albany (OH1)
Vantage has started work on its OH1 data center campus at 3475 Horizon Ct., which is inside the Silicon Heartland Innovation Park.
16.33 miles Hyperscale Data Center Request Dataset
This facility is part of Amazon's 3180 Beech Road Campus in New Albany.
16.45 miles Hyperscale Data Center Request Dataset
Amazon's Industrial Parkway Campus is situated on 98 acres at 8619 Industrial Parkway in Union County’s Jerome Township.
16.46 miles Hyperscale Data Center Request Dataset
Google recently expanded its footprint in Ohio, acquiring nearly 85 acres of land in New Albany, outside Columbus, for $63 million.
16.49 miles Hyperscale Data Center Request Dataset
Amazon's Industrial Parkway Campus is situated on 98 acres at 8619 Industrial Parkway in Union County’s Jerome Township.
16.54 miles Hyperscale Data Center Request Dataset
Amazon's Industrial Parkway Campus is situated on 98 acres at 8619 Industrial Parkway in Union County’s Jerome Township.
16.58 miles Hyperscale Data Center Request Dataset
Amazon's Industrial Parkway Campus is situated on 98 acres at 8619 Industrial Parkway in Union County’s Jerome Township.
16.61 miles Hyperscale Data Center Request Dataset
16.64 miles Hyperscale Data Center Request Dataset
16.68 miles Hyperscale Data Center Request Dataset
16.74 miles EdgeConnex: Johnstown South 2
Phase II of EdgeConneX's Johnstown South Campus will see the construction of a new two-story 700,000 sq ft (65,030 sqm) building.
16.77 miles Hyperscale Data Center Request Dataset
16.77 miles Hyperscale Data Center Request Dataset
16.82 miles Hyperscale Data Center Request Dataset
This facility will be part of Amazon's new data center campus along Beech and Miller roads in New Albany.
16.83 miles EdgeConnex: Johnstown South Campus
EdgeConneX, a US data center operator, invested $137.2 million to acquire nearly 270 acres across multiple sites in Licking County.
16.90 miles Hyperscale Data Center Request Dataset
This facility will be part of Amazon's new data center campus along Beech and Miller roads in New Albany.
16.94 miles Hyperscale Data Center Request Dataset
Amazon is building five data centers and related buildings totaling 1.25 million square feet on 85 of the 439 acres the company bought along Beech and Miller roads in early 2023.
17.01 miles Hyperscale Data Center Request Dataset
This facility will be part of Amazon's new data center campus along Beech and Miller roads in New Albany.
17.04 miles Hyperscale Data Center Request Dataset
This facility will be part of Amazon's new data center campus along Beech and Miller roads in New Albany.
17.05 miles Karis Critical: New Albany, OH
Data center developer Karis Critical has purchased 115 acres of land in New Albany, Ohio.
17.07 miles QTS: Miller Road, New Albany
QTS Data Centers wants to build eight additional facilities spanning 3.2 million square feet on 240 acres on Babbitt and Miller roads. It will invest nearly $3 billion in those projects.
17.31 miles DBT Data: Jug & Mink Project
Washington DC-based DBT-Data plans to develop a data center at the New Albany International Business Park, close to Intel's upcoming chip fab site.
17.31 miles CyrusOne: New Albany COL-1
CyrusOne has broken ground on a $150 million data center development in New Albany, Ohio.
17.39 miles Hyperscale Data Center Request Dataset
Meta’s $42 million acquisition of the Clover Valley Road parcel through its subsidiary Sidecat LLC marks a strategic expansion of the Prometheus AI Supercluster in New Albany, Ohio.
17.61 miles EdgeConnex: Johnstown North Campus
EdgeConnex acquired a 170.29-acre parcel of land for roughly $62.2 million, or about $365,017 per acre.
18.96 miles Cologix: Johnstown COL8
19.08 miles Cologix: Johnstown COL7
Cologix has acquired approximately 154 acres of land in Johnstown, Ohio, to develop a new, AI-ready data center campus.
19.09 miles Cologix: Johnstown Expansion
19.27 miles Hyperscale Data Center Request Dataset
Construction of the first 450,000 square foot (41,800 sq m) building is expected to begin in January 2028 and be completed by December 2034.

US Signal Columbus Data Center Photos (See all)

Operating Company

Operated by:

US Singal Data Centers are:

  • Audited for compliance with HIPAA/HITECH, PCI DSS, and SOC 1, TYPE 2
  • Scalable and customizable
  • Powered by US Signal's wholly owned, robust network

US Signal rings the Midwest with its fiber-optic network. The network connects subscribers in the metropolitan areas of Indianapolis, Detroit, Chicago, and 12 other cities. US Signal provides telecommunications services to institutional, enterprise, and wholesale customers in Illinois, Indiana, Michigan, and Wisconsin. It also provides Internet access, dark fiber capacity, and colocation services. The company's related infrastructure services include network design and construction. US Signal has supply partnerships with equipment manufacturers including ADTRAN and Cisco Systems. Source: hoovers.com

21
Facilities
11
Markets
33MW
Megawatts

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?