Lafayette Square funds DartPoints' Venyu acquisition
June 22, 2023
DartPoints
CMH01 is situated in Dublin, OH—just outside Columbus—and benefits from access to a reliable power grid and multiple tier-one carriers. Its location in a fiber-dense area makes it a strong option for latency-sensitive applications.
The facility was previously operated by Metro Data Center LLC before being acquired by Dartpoints in October 2020. The site spans nearly 40,000 square feet. This includes 5,903 square feet of raised data center floor space, 364 square feet of demarcation locations yielding 200 total rack spaces available in server cabinets.
One of the strengths of the facility is its state-of-the-art power management plan. This begins with fully redundant (2N) active power transmitted through dual electric feeds from two substations provided by American Electric Power.
Electrical wiring to the center is supplied via two unique routes through dual transformers, dual switch gear, and dual 625 KVA-UPS systems, all of which are autonomous in supplying the center’s (2N) power at 480 volts. Single-corded servers get in-rack Automatic Transfer Switches for redundant power.
Designers of MDC employed a number of strategies for facility thermal management, including the use of N+1-rated glycol pumping stations and dry coolers and Rittal cold row containment systems. The Rittal solution maximizes cooling per cabinet and raises overall site efficiency. All cooling equipment is supported by generator back up, including seven 30-ton glycol-based air handlers.
| Distance | Site | About |
|---|---|---|
| 0.77 miles | Expedient Dublin |
Offering 29,000 square foot of total floor space, Expedient’s Dublin data center is powered by redundant electric utility power feeds and 4 auto-cutover diesel generators
|
| 2.43 miles | Hyperscale Data Center Request Dataset | |
| 2.43 miles | Hyperscale Data Center Request Dataset |
|
| 2.51 miles | Hyperscale Data Center Request Dataset | |
| 2.57 miles | Hyperscale Data Center Request Dataset | |
| 2.62 miles | Hyperscale Data Center Request Dataset | |
| 3.00 miles | Connect Data Centers: Hilliard, OH |
US involvement from Oppidan's Hilliard data center spans 89,954 sqft. Oppidan lists Connect Data Centers as a subsidiary.
|
| 3.64 miles | Hyperscale Data Center Request Dataset |
Amazon is building a five-building data center campus in New Albany, Ohio. Amazon 6645 Crosby Ct facility would be the fourth building of the campus with an area of 152,945 sqft.
|
| 3.65 miles | Hyperscale Data Center Request Dataset |
Amazon is building a five-building data center campus in New Albany, Ohio. Amazon 6655 Crosby Ct facility is the fourth building of the campus with an area of 152,945 sqft.
|
| 3.67 miles | Hyperscale Data Center Request Dataset |
Amazon is building a five-building data center campus in New Albany, Ohio. Amazon 6665 Crosby Ct facility is the third building of the campus with an area of 152945 sqft.
|
| 3.68 miles | Hyperscale Data Center Request Dataset |
Amazon is building a five-building data center campus in New Albany, Ohio. Amazon 6675 Crosby Ct facility is the second building of the campus with an area of 152945 sqft.
|
| 3.71 miles | Hyperscale Data Center Request Dataset |
Amazon is building a five-building data center campus in New Albany, Ohio.
|
| 3.78 miles | Expedient Upper Arlington |
|
| 3.92 miles | Hyperscale Data Center Request Dataset |
This data center is a part of amazon's Cosgray Road Campus in Hilliard, Ohio.
|
| 3.98 miles | Hyperscale Data Center Request Dataset |
This data center is a part of amazon's Cosgray Road Campus in Hilliard, Ohio.
|
| 4.00 miles | Hyperscale Data Center Request Dataset | |
| 4.00 miles | Hyperscale Data Center Request Dataset |
Amazon's $200 million data center campus is situated on 111 acres at the southwest corner of Warner Road and Industrial Parkway.
|
| 4.02 miles | Hyperscale Data Center Request Dataset |
This data center is a part of amazon's Cosgray Road Campus in Hilliard, Ohio.
|
| 4.06 miles | Hyperscale Data Center Request Dataset |
Amazon's $200 million data center campus is situated on 111 acres at the southwest corner of Warner Road and Industrial Parkway.
|
| 4.08 miles | Hyperscale Data Center Request Dataset |
Amazon's second data center campus in Hilliard, Ohio, is situated on a 104-acre site between Cosgray and Leppert roads.
|
| 4.11 miles | Hyperscale Data Center Request Dataset |
Amazon's $200 million data center campus is situated on 111 acres at the southwest corner of Warner Road and Industrial Parkway.
|
| 4.16 miles | Hyperscale Data Center Request Dataset |
Amazon's $200 million data center campus is situated on 111 acres at the southwest corner of Warner Road and Industrial Parkway.
|
| 5.06 miles | Hyperscale Data Center Request Dataset |
Amazon's Industrial Parkway Campus is situated on 98 acres at 8619 Industrial Parkway in Union County’s Jerome Township.
|
| 5.14 miles | Hyperscale Data Center Request Dataset |
Amazon is constructing its third data center campus in Hilliard at the intersection of Scioto Darby Road and the Interstate 270 overpass.
|
| 5.14 miles | Hyperscale Data Center Request Dataset |
Amazon's Industrial Parkway Campus is situated on 98 acres at 8619 Industrial Parkway in Union County’s Jerome Township.
|
| 5.14 miles | Hyperscale Data Center Request Dataset |
Amazon's Industrial Parkway Campus is situated on 98 acres at 8619 Industrial Parkway in Union County’s Jerome Township.
|
| 5.19 miles | Hyperscale Data Center Request Dataset |
Amazon is constructing its third data center campus in Hilliard at the intersection of Scioto Darby Road and the Interstate 270 overpass.
|
| 5.20 miles | Hyperscale Data Center Request Dataset |
Amazon is constructing its third data center campus in Hilliard at the intersection of Scioto Darby Road and the Interstate 270 overpass.
|
| 5.23 miles | Hyperscale Data Center Request Dataset |
Amazon's Industrial Parkway Campus is situated on 98 acres at 8619 Industrial Parkway in Union County’s Jerome Township.
|
| 5.33 miles | Hyperscale Data Center Request Dataset |
The complex will comprise seven buildings for data center operations and an additional structure for security and utilities.
|
| 5.52 miles | Hyperscale Data Center Request Dataset |
Amazon is constructing its third data center campus in Hilliard at the intersection of Scioto Darby Road and the Interstate 270 overpass.
|
| 5.60 miles | Hyperscale Data Center Request Dataset |
Amazon is constructing its third data center campus in Hilliard at the intersection of Scioto Darby Road and the Interstate 270 overpass.
|
| 6.92 miles | Cologix Columbus COL1, COL2 |
COL1 (32,000sqft) and COL2 (20,000sqft) represent 2 phases of buildout in the same building.
Cologix entered the Columbus market in February of 2014 through an acquisition of DataCenter.BZ
|
| 6.95 miles | Cologix COL3 | |
| 7.06 miles | Cologix Columbus COL4 |
Cologix is building COL4, a 256,000 square foot data center on 9 acres along Alta View and Worthington Woods boulevards in Ohio. This facility will offer 27 MW of capacity.
|
| 7.35 miles | Expedient: Lewis Center |
Expedient data center Located at 281 E. Powell Road in Lewis Center township with The 102,000 sq ft (9,475 sqm) facility offers 3MW of initial power capacity that will be increased to 7.5 MW in the future.
|
| 8.07 miles | Centersquare: Columbus CMH1 |
DCI Technology Holdings owns the building and is CenturyLink's landlord.
|
| 8.71 miles | Kyndryl Columbus | |
| 9.04 miles | Cologix: Columbus COL5 |
Cologix is constructing a 60,000-square-foot, AI-ready facility, COL5, in Columbus, Ohio.
|
| 9.10 miles | Cologix: COL6 |
This planned facility is part of Cologix COL5 campus in Columbus.
|
| 10.03 miles | WeConnect Westerville |
|
| 10.08 miles | Racksquared 2560 Value Way | |
| 10.18 miles | eNET Columbus |
|
| 10.93 miles | Lumen: 580 North 4th | |
| 11.34 miles | Lumen: 266 North 5th | |
| 11.36 miles | Cogent: 240 North 5th | |
| 11.38 miles | CityNet Columbus | |
| 11.39 miles | WOW! 226 N 5th |
WOW!'s Columbus datacenter was acquired in 2013 from Bluemile assets. The site offers 26,00sqft and can expand to 52,00 sqft.
|
| 11.39 miles | Lumen: 226 North Fifth | |
| 11.42 miles | Carrier-Neutral Data Center Request Dataset | |
| 11.53 miles | Racksquared 325 E Spring St | |
| 11.62 miles | CENTRA: 180 East Broad (CMH01) | |
| 11.62 miles | US Signal Columbus |
DC power w/battery backup available
Multiple diverse power feeds from utility grids |
| 11.82 miles | Crown Castle 101 E Town |
Crown Castle acquired Lightower in 2017
|
| 13.31 miles | Hyperscale Data Center Request Dataset |
Amazon is constructing a two building data center campus in Marysville, Ohio, potentially spanning 500,000 square feet.
|
| 13.41 miles | Hyperscale Data Center Request Dataset |
This facility is part of Amazon's Marysville Campus in Ohio.
|
| 15.67 miles | Carrier-Neutral Data Center Request Dataset | |
| 16.16 miles | CeraNet Columbus | |
| 16.68 miles | Discover Financial Services New Albany |
|
| 16.68 miles | Edged Energy: Columbus CMH01 |
Edged Energy data center spans 206,000 sq ft on a 15-acre parcel at 6385 New Albany Road East.
|
| 16.96 miles | TJX Corporate Techno | |
| 17.02 miles | Compass New Albany | |
| 17.13 miles | Hyperscale Data Center Request Dataset |
Construction of the first 450,000 square foot (41,800 sq m) building is expected to begin in January 2028 and be completed by December 2034.
|
| 17.15 miles | Compugen New Albany |
|
| 17.27 miles | Stack: NAL01B |
STACK INFRASTRUCTURE is expanding it's NAL01 campus, located at Souder Road, New Albany, OH.
|
| 17.43 miles | STACK New Albany NAL01 |
STACK acquired the facility in October 2019 from Nationwide Insurance. Nationwide initially built the facility in 2008 for a cost of $96 million.
|
| 18.21 miles | Hyperscale Data Center Request Dataset |
This data center is part of Google's Lockbourne Campus in Ohio.
|
| 18.32 miles | Hyperscale Data Center Request Dataset |
In March 2021, Columbus City Council approved $54.3 million in tax incentives to develop a data center on the former Hartman Farm site.
|
| 18.42 miles | Hyperscale Data Center Request Dataset |
This data center is part of Google's Lockbourne Campus in Ohio.
|
| 18.61 miles | Hyperscale Data Center Request Dataset |
This data center is a part of Google's Lockbourne Campus in Ohio.
|
| 18.68 miles | Hyperscale Data Center Request Dataset |
This data center is a part of Google's Lockbourne Campus in Ohio.
|
| 19.08 miles | Hyperscale Data Center Request Dataset |
This facility is part of Google's New Albany campus in Ohio.
|
| 19.08 miles | QTS: Babbitt Rd, New Albany |
QTS Data Centers wants to build eight additional facilities spanning 3.2 million square feet on 240 acres on Babbitt and Miller roads. It will invest nearly $3 billion in those projects.
|
| 19.08 miles | Hyperscale Data Center Request Dataset |
This facility is part of Google's New Albany campus in Ohio.
|
| 19.37 miles | Hyperscale Data Center Request Dataset |
This facility is part of Google's New Albany campus in Ohio.
|
| 19.47 miles | Hyperscale Data Center Request Dataset |
This facility is part of Google's New Albany campus in Ohio.
|
| 19.50 miles | Hyperscale Data Center Request Dataset |
The campus is located on a 447-acre site on the west side of Beech Road, south of the state Route 161 interchange.
|
| 19.50 miles | Hyperscale Data Center Request Dataset |
This facility is part of Google's New Albany campus in Ohio.
|
| 19.53 miles | Hyperscale Data Center Request Dataset |
This facility is part of Google's New Albany campus in Ohio.
|
| 19.67 miles | Hyperscale Data Center Request Dataset |
Microsoft purchased 183 acres of land on Beech Road in New Albany in 2023.
|
| 19.79 miles | QTS: New Albany 1 DC2 |
QTS New Albany 1 is a two-building data center campus in New Albany, Ohio. The second building, New Albany 1 DC2, of the campus is located at 1275 Beech Rd SW, New Albany, OH.
|
| 19.79 miles | QTS: New Albany 1 DC1 |
QTS New Albany 1 is a two-building data center campus in New Albany, Ohio. The first building of the campus is located at 1225 Beech Rd SW, New Albany, OH.
|
| 19.81 miles | Compass Groveport AEP II |
American Electric Power invested approximately $125 million into the data center on Hamilton Road
|
| 19.97 miles | QTS: New Albany 2 DC1 |
QTS New Albany 2 is a two-building data center campus in New Albany, Ohio. New Albany 2 DC1 is located at 785 Beech Rd SW, Pataskala, OH.
|
| 19.97 miles | QTS: New Albany 2 DC2 |
QTS New Albany 2 is a two-building data center campus in New Albany, Ohio. New Albany 2 DC2 is located at 675 Beech Rd SW, Etna, OH.
|
| 19.98 miles | Hyperscale Data Center Request Dataset | |
| 19.99 miles | Hyperscale Data Center Request Dataset | |
| 20.00 miles | Hyperscale Data Center Request Dataset |
This facility is part of Amazon's 3180 Beech Road Campus in New Albany.
|
| 20.00 miles | Hyperscale Data Center Request Dataset |
DartPoints is based in Dallas, Texas and is majority owned by NOVA Infrastructure following an April 2025 transaction in which Astra Capital Management retained a minority stake. The company operates 11 data centers across 10 US markets in the five states listed above. Scale disclosed in 2023 included more than 325,000 square feet of data center space and 20 MW of power capacity. Services include retail colocation, cloud, and managed services.
History:
June 22, 2023
DartPoints
May 04, 2023
DartPoints
June 24, 2022
DartPoints
January 14, 2022
DartPoints
May 05, 2021
DartPoints
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas