|
0.77 miles
|
Expedient Dublin (CMH2)
|
Offering 29,000 square foot of total floor space, Expedient’s Dublin data center is powered by redundant electric utility power feeds and 4 auto-cutover diesel generators
|
|
2.43 miles
|
Station GammaInterested in this information?Contact us
|
|
|
2.43 miles
|
Campus ThreeInterested in this information?Contact us
|
|
|
2.51 miles
|
CenterInterested in this information?Contact us
|
|
|
2.57 miles
|
NorthInterested in this information?Contact us
|
|
|
2.62 miles
|
Ridge UltraInterested in this information?Contact us
|
|
|
3.00 miles
|
Connect Data Centers: Hilliard, OH
|
US involvement from Oppidan's Hilliard data center spans 89,954 sqft. Oppidan lists Connect Data Centers as a subsidiary.
|
|
3.64 miles
|
CoreInterested in this information?Contact us
|
Amazon is building a five-building data center campus in New Albany, Ohio. Amazon 6645 Crosby Ct facility would be the fourth building of the campus with an area of 152,945 sqft.
|
|
3.65 miles
|
SouthInterested in this information?Contact us
|
Amazon is building a five-building data center campus in New Albany, Ohio. Amazon 6655 Crosby Ct facility is the fourth building of the campus with an area of 152,945 sqft.
|
|
3.67 miles
|
EastInterested in this information?Contact us
|
Amazon is building a five-building data center campus in New Albany, Ohio. Amazon 6665 Crosby Ct facility is the third building of the campus with an area of 152945 sqft.
|
|
3.68 miles
|
Point PlusInterested in this information?Contact us
|
Amazon is building a five-building data center campus in New Albany, Ohio. Amazon 6675 Crosby Ct facility is the second building of the campus with an area of 152945 sqft.
|
|
3.71 miles
|
Global HubInterested in this information?Contact us
|
Amazon is building a five-building data center campus in New Albany, Ohio.
|
|
3.78 miles
|
Expedient Upper Arlington
|
|
|
3.92 miles
|
Metro TowerInterested in this information?Contact us
|
This data center is a part of amazon's Cosgray Road Campus in Hilliard, Ohio.
|
|
3.98 miles
|
Central StationInterested in this information?Contact us
|
This data center is a part of amazon's Cosgray Road Campus in Hilliard, Ohio.
|
|
4.00 miles
|
Central TowerInterested in this information?Contact us
|
|
|
4.00 miles
|
Point ProInterested in this information?Contact us
|
Amazon's $200 million data center campus is situated on 111 acres at the southwest corner of Warner Road and Industrial Parkway.
|
|
4.02 miles
|
CoreInterested in this information?Contact us
|
This data center is a part of amazon's Cosgray Road Campus in Hilliard, Ohio.
|
|
4.06 miles
|
TwoInterested in this information?Contact us
|
Amazon's $200 million data center campus is situated on 111 acres at the southwest corner of Warner Road and Industrial Parkway.
|
|
4.08 miles
|
CenterInterested in this information?Contact us
|
Amazon's second data center campus in Hilliard, Ohio, is situated on a 104-acre site between Cosgray and Leppert roads.
|
|
4.11 miles
|
CloudInterested in this information?Contact us
|
Amazon's $200 million data center campus is situated on 111 acres at the southwest corner of Warner Road and Industrial Parkway.
|
|
4.16 miles
|
West StationInterested in this information?Contact us
|
Amazon's $200 million data center campus is situated on 111 acres at the southwest corner of Warner Road and Industrial Parkway.
|
|
5.06 miles
|
PlusInterested in this information?Contact us
|
Amazon's Industrial Parkway Campus is situated on 98 acres at 8619 Industrial Parkway in Union County’s Jerome Township.
|
|
5.14 miles
|
Hub BetaInterested in this information?Contact us
|
Amazon is constructing its third data center campus in Hilliard at the intersection of Scioto Darby Road and the Interstate 270 overpass.
|
|
5.14 miles
|
RidgeInterested in this information?Contact us
|
Amazon's Industrial Parkway Campus is situated on 98 acres at 8619 Industrial Parkway in Union County’s Jerome Township.
|
|
5.14 miles
|
ThreeInterested in this information?Contact us
|
Amazon's Industrial Parkway Campus is situated on 98 acres at 8619 Industrial Parkway in Union County’s Jerome Township.
|
|
5.19 miles
|
Ridge ProInterested in this information?Contact us
|
Amazon is constructing its third data center campus in Hilliard at the intersection of Scioto Darby Road and the Interstate 270 overpass.
|
|
5.20 miles
|
Park GammaInterested in this information?Contact us
|
Amazon is constructing its third data center campus in Hilliard at the intersection of Scioto Darby Road and the Interstate 270 overpass.
|
|
5.23 miles
|
NorthInterested in this information?Contact us
|
Amazon's Industrial Parkway Campus is situated on 98 acres at 8619 Industrial Parkway in Union County’s Jerome Township.
|
|
5.33 miles
|
Edge StationInterested in this information?Contact us
|
The complex will comprise seven buildings for data center operations and an additional structure for security and utilities.
|
|
5.52 miles
|
Point ProInterested in this information?Contact us
|
Amazon is constructing its third data center campus in Hilliard at the intersection of Scioto Darby Road and the Interstate 270 overpass.
|
|
5.60 miles
|
North CenterInterested in this information?Contact us
|
Amazon is constructing its third data center campus in Hilliard at the intersection of Scioto Darby Road and the Interstate 270 overpass.
|
|
6.92 miles
|
Cologix Columbus COL1, COL2
|
COL1 (32,000sqft) and COL2 (20,000sqft) represent 2 phases of buildout in the same building.
Cologix entered the Columbus market in February of 2014 through an acquisition of DataCenter.BZ
|
|
6.95 miles
|
Cologix COL3
|
|
|
7.06 miles
|
Cologix Columbus COL4
|
Cologix is building COL4, a 256,000 square foot data center on 9 acres along Alta View and Worthington Woods boulevards in Ohio. This facility will offer 27 MW of capacity.
|
|
7.35 miles
|
Expedient: Lewis Center (CMH3)
|
Expedient data center Located at 281 E. Powell Road in Lewis Center township with The 102,000 sq ft (9,475 sqm) facility offers 3MW of initial power capacity that will be increased to 7.5 MW in the future.
|
|
8.07 miles
|
Centersquare: Columbus CMH1
|
DCI Technology Holdings owns the building and is CenturyLink's landlord.
|
|
9.04 miles
|
Cologix: Columbus COL5
|
Cologix is constructing a 60,000-square-foot, AI-ready facility, COL5, in Columbus, Ohio.
|
|
9.10 miles
|
Cologix: COL6
|
This planned facility is part of Cologix COL5 campus in Columbus.
|
|
9.55 miles
|
Kyndryl: Columbus
|
|
|
9.85 miles
|
Karis: Galloway, Ohio
|
Karis Critical's proposed data center project on 127 acres in Prairie Township, Ohio, remains strictly in a "land-banked" planning phase, with no formal development or construction application submitted to local authorities.
|
|
10.03 miles
|
WeConnect Westerville
|
|
|
10.08 miles
|
Racksquared 2560 Value Way
|
|
|
10.18 miles
|
eNET Columbus
|
|
|
10.93 miles
|
Lumen: 580 North 4th
|
|
|
11.34 miles
|
Lumen: 266 North 5th
|
|
|
11.36 miles
|
Cogent: 240 North 5th
|
|
|
11.38 miles
|
CityNet Columbus
|
|
|
11.39 miles
|
WOW! 226 N 5th
|
WOW!'s Columbus datacenter was acquired in 2013 from Bluemile assets. The site offers 26,00sqft and can expand to 52,00 sqft.
|
|
11.39 miles
|
Lumen: 226 North Fifth
|
|
|
11.42 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
|
|
11.53 miles
|
Racksquared 325 E Spring St
|
|
|
11.62 miles
|
US Signal Columbus
|
DC power w/battery backup available
Multiple diverse power feeds from utility grids
|
|
11.62 miles
|
CENTRA: 180 East Broad (CMH01)
|
|
|
11.82 miles
|
Crown Castle 101 E Town
|
Crown Castle acquired Lightower in 2017
|
|
12.92 miles
|
MicroLink: Mansfield Campus
|
MicroLink is planning to build a data center in Columbus, Ohio.
|
|
13.31 miles
|
OneInterested in this information?Contact us
|
Amazon is constructing a two building data center campus in Marysville, Ohio, potentially spanning 500,000 square feet.
|
|
13.41 miles
|
StationInterested in this information?Contact us
|
This facility is part of Amazon's Marysville Campus in Ohio.
|
|
15.67 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
|
|
16.16 miles
|
CeraNet Columbus
|
|
|
16.68 miles
|
Discover Financial Services New Albany
|
|
|
16.68 miles
|
Edged Energy: Columbus CMH01
|
Edged Energy data center spans 206,000 sq ft on a 15-acre parcel at 6385 New Albany Road East.
|
|
16.96 miles
|
TJX Corporate Techno
|
|
|
17.02 miles
|
Compass New Albany
|
|
|
17.13 miles
|
Center PrimeInterested in this information?Contact us
|
Construction of the first 450,000 square foot (41,800 sq m) building is expected to begin in January 2028 and be completed by December 2034.
|
|
17.15 miles
|
Compugen New Albany
|
|
|
17.27 miles
|
Stack: NAL01B
|
STACK INFRASTRUCTURE is expanding it's NAL01 campus, located at Souder Road, New Albany, OH.
|
|
17.43 miles
|
STACK New Albany NAL01
|
STACK acquired the facility in October 2019 from Nationwide Insurance. Nationwide initially built the facility in 2008 for a cost of $96 million.
|
|
18.21 miles
|
Center ThreeInterested in this information?Contact us
|
This data center is part of Google's Lockbourne Campus in Ohio.
|
|
18.32 miles
|
Center ProInterested in this information?Contact us
|
In March 2021, Columbus City Council approved $54.3 million in tax incentives to develop a data center on the former Hartman Farm site.
|
|
18.42 miles
|
Center AlphaInterested in this information?Contact us
|
This data center is part of Google's Lockbourne Campus in Ohio.
|
|
18.61 miles
|
Tower BetaInterested in this information?Contact us
|
This data center is a part of Google's Lockbourne Campus in Ohio.
|
|
18.68 miles
|
StationInterested in this information?Contact us
|
This data center is a part of Google's Lockbourne Campus in Ohio.
|
|
19.08 miles
|
Central ValleyInterested in this information?Contact us
|
This facility is part of Google's New Albany campus in Ohio.
|
|
19.08 miles
|
QTS: Babbitt Rd, New Albany
|
QTS Data Centers wants to build eight additional facilities spanning 3.2 million square feet on 240 acres on Babbitt and Miller roads. It will invest nearly $3 billion in those projects.
|
|
19.08 miles
|
Hub OneInterested in this information?Contact us
|
This facility is part of Google's New Albany campus in Ohio.
|
|
19.37 miles
|
EastInterested in this information?Contact us
|
This facility is part of Google's New Albany campus in Ohio.
|
|
19.47 miles
|
PrimeInterested in this information?Contact us
|
This facility is part of Google's New Albany campus in Ohio.
|
|
19.50 miles
|
Edge StationInterested in this information?Contact us
|
The campus is located on a 447-acre site on the west side of Beech Road, south of the state Route 161 interchange.
|
|
19.50 miles
|
TwoInterested in this information?Contact us
|
This facility is part of Google's New Albany campus in Ohio.
|
|
19.53 miles
|
Prime RidgeInterested in this information?Contact us
|
This facility is part of Google's New Albany campus in Ohio.
|
|
19.67 miles
|
Point MaxInterested in this information?Contact us
|
Microsoft purchased 183 acres of land on Beech Road in New Albany in 2023.
|
|
19.79 miles
|
QTS: New Albany 1 DC2
|
QTS New Albany 1 is a two-building data center campus in New Albany, Ohio. The second building, New Albany 1 DC2, of the campus is located at 1275 Beech Rd SW, New Albany, OH.
|
|
19.79 miles
|
QTS: New Albany 1 DC1
|
QTS New Albany 1 is a two-building data center campus in New Albany, Ohio. The first building of the campus is located at 1225 Beech Rd SW, New Albany, OH.
|
|
19.81 miles
|
Compass Groveport AEP II
|
American Electric Power invested approximately $125 million into the data center on Hamilton Road
|
|
19.97 miles
|
QTS: New Albany 2 DC1
|
QTS New Albany 2 is a two-building data center campus in New Albany, Ohio. New Albany 2 DC1 is located at 785 Beech Rd SW, Pataskala, OH.
|
|
19.97 miles
|
QTS: New Albany 2 DC2
|
QTS New Albany 2 is a two-building data center campus in New Albany, Ohio. New Albany 2 DC2 is located at 675 Beech Rd SW, Etna, OH.
|
|
19.98 miles
|
PrimeInterested in this information?Contact us
|
|
|
19.99 miles
|
PrimeInterested in this information?Contact us
|
|
|
20.00 miles
|
Prime CenterInterested in this information?Contact us
|
This facility is part of Amazon's 3180 Beech Road Campus in New Albany.
|
|
20.00 miles
|
TowerInterested in this information?Contact us
|
|