Stack: NAL01B

Latest Podcast 7340 Souder Road
Under Construction
New facility under construction
Operated by:

Stack: NAL01B

Short Code: NAL01B
Year Planned: 2028
Utility Provider: American Electric Power Ohio
Ownership: STACK INFRASTRUCTURE si nal01b, llc (stack infrastructure) the building.
Lot Size: 17 acres

NAL01B is STACK's new two-story building on its NAL01 campus at 7340 Souder Road, New Albany, Ohio. It spans 332,089 square feet. Brasfield & Gorrie is the general contractor.

New Albany sits 15 miles northeast of Columbus. AEP Ohio is building a new Souder 138 kV substation on the campus.

Map and Nearby Locations

7340 Souder Road
STACK INFRASTRUCTURE Sites
Nearby Facilities

Stack: NAL01B Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Stack: NAL01B

Distance Site About
0.15 miles Compugen New Albany
0.16 miles Stack: NAL01A
STACK acquired the facility in October 2019 from Nationwide Insurance. Nationwide initially built the facility in 2008 for a cost of $96 million.
0.34 miles AEP: New Albany
AEP (American Electric Power) operates this data center in the New Albany International Business Park, Ohio. Compass Datacenters built the single-story facility for AEP in 2015.
0.41 miles TJX Corporate Techno
0.57 miles Discover Financial Services New Albany
0.63 miles Edged Energy: Columbus CMH01
Edged Energy data center spans 206,000 sq ft on a 15-acre parcel at 6385 New Albany Road East.
1.03 miles Centra: New Albany (CMH1)
CENTRA is building CMH1, a two-story data center on a 15.8-acre site on Central College Road in the New Albany International Business Park, Ohio.
2.40 miles West TowerInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
2.40 miles Hub GammaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
2.52 miles PointInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
2.54 miles PrimeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
2.56 miles Central CampusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
2.59 miles Center UltraInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
2.62 miles PlazaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
2.75 miles Station OneInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
2.76 miles CampusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
2.76 miles PrimeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
2.82 miles AlphaInterested in this information?Contact us
2.83 miles QTS: Babbitt Rd, New Albany
QTS Data Centers wants to build eight additional facilities spanning 3.2 million square feet on 240 acres on Babbitt and Miller roads. It will invest nearly $3 billion in those projects.
2.85 miles Plaza ProInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
2.85 miles Plaza TwoInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
2.86 miles EdgeInterested in this information?Contact us
2.87 miles Prime PointInterested in this information?Contact us
2.97 miles Hyperscale Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
2.98 miles Hyperscale Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.00 miles Hyperscale Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.01 miles Vantage: OH11
Vantage has started work on its OH1 data center campus at 3475 Horizon Ct., which is inside the Silicon Heartland Innovation Park.
3.02 miles Vantage: OH12
This facility is a part of Vantage's New Albany data center campus in Ohio.
3.02 miles Vantage: OH13
This facility is a part of Vantage's New Albany data center campus in Ohio.
3.04 miles Hyperscale Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.05 miles Lincoln Rackhouse: Silicon Heartland Innovation Park
3.06 miles Karis Critical: New Albany, OH
Data center developer Karis Critical has purchased 115 acres of land in New Albany, Ohio.
3.11 miles Edge PointInterested in this information?Contact us
3.11 miles Hyperscale Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.13 miles Ridge AlphaInterested in this information?Contact us
3.15 miles Hyperscale Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.38 miles QTS: Miller Road, New Albany
QTS Data Centers wants to build eight additional facilities spanning 3.2 million square feet on 240 acres on Babbitt and Miller roads. It will invest nearly $3 billion in those projects.
3.57 miles Valley UltraInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.67 miles Core PointInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.67 miles Core StationInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.75 miles QTS: New Albany 1 DC1
QTS New Albany 1 is a two-building data center campus in New Albany, Ohio. The first building of the campus is located at 1225 Beech Rd SW, New Albany, OH.
3.76 miles Ridge AlphaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.78 miles EdgeConneX: Piper Farms
EdgeConneX bought about 136 acres on Johnstown-Utica Road and Green Chapel Road in Monroe Township, Licking County, Ohio, in November 2025 for future data center development.
3.81 miles QTS: New Albany 1 DC2
QTS New Albany 1 is a two-building data center campus in New Albany, Ohio. The second building, New Albany 1 DC2, of the campus is located at 1275 Beech Rd SW, New Albany, OH.
3.82 miles Valley TwoInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.84 miles RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.84 miles Core ValleyInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.87 miles PointInterested in this information?Contact us
3.88 miles PrimeInterested in this information?Contact us
3.89 miles Station BetaInterested in this information?Contact us
3.91 miles BetaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.92 miles Prime CampusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
4.03 miles TowerInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
4.03 miles Global RidgeInterested in this information?Contact us
4.08 miles GammaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
4.14 miles Metro CampusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
4.15 miles CentralInterested in this information?Contact us
4.16 miles SouthInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
4.17 miles Metro ParkInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
4.22 miles Point ProInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
4.27 miles Campus BetaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
4.31 miles QTS: New Albany 2 DC1
New Albany 2 DC1 is the first of two buildings on the QTS New Albany 2 campus, at 785 Beech Rd SW, Pataskala (Etna Township), Ohio.
4.37 miles HubInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
4.46 miles QTS: New Albany 2 DC2
QTS New Albany 2 is a two-building data center campus in New Albany, Ohio. New Albany 2 DC2 is located at 675 Beech Rd SW, Etna, OH.
4.47 miles WestInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
4.47 miles EdgeConnex: Johnstown South 1
EdgeConneX, a US data center operator, invested $137.2 million to acquire nearly 270 acres across multiple sites in Licking County.
4.49 miles Point PrimeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
4.51 miles EdgeConnex: Johnstown North Campus
EdgeConnex acquired a 170.29-acre parcel of land for roughly $62.2 million, or about $365,017 per acre.
4.53 miles Tower UltraInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
4.56 miles EdgeConnex: Johnstown South 2
Phase II of EdgeConneX's Johnstown South Campus will see the construction of a new two-story 700,000 sq ft (65,030 sqm) building.
4.56 miles CyrusOne: New Albany COL-1
CyrusOne has broken ground on a $150 million data center development in New Albany, Ohio.
4.56 miles Prime RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
4.58 miles GlobalInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
4.60 miles Park MaxInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
4.73 miles DBT Data: 2214 Harrison Rd
DBT-Data bought 44 acres on Harrison Road SW in Jersey Township in March 2022 for a data center project. The land was sold in 2025 for a natural gas power plant.
4.85 miles Cologix: Johnstown Expansion
5.02 miles Cologix: COL7
Cologix has acquired approximately 154 acres of land in Johnstown, Ohio, to develop a new, AI-ready data center campus.
5.11 miles Edge TowerInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
5.17 miles Cologix: COL8
COL8 is a single-story, liquid-cooled data center under construction on Cologix's Johnstown campus in Licking County, Ohio.
7.30 miles eNET Columbus
7.58 miles WeConnect Westerville
8.04 miles Station ThreeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
8.14 miles CeraNet Columbus
8.87 miles Racksquared 2560 Value Way
8.94 miles Aligned: Pataskala
Aligned Data Centers, is targeting Pataskala for its second development in the Buckeye State.
10.03 miles EastInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
10.29 miles Central ParkInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
10.34 miles Government Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
10.36 miles Cologix Columbus COL4
COL4 is a three-hall colocation data center that Cologix completed in May 2024 on Alta View Boulevard in north Columbus, Ohio, next to its COL1-3 facilities.
10.36 miles Lambda: Columbus COL4
Lambda runs GPU clusters in Cologix's COL4 data center in north Columbus, Ohio.
10.45 miles Cologix COL3
10.47 miles T-Mobile: Columbus MSC
T-Mobile runs a mobile switching center on Alta View Boulevard in north Columbus, Ohio.
10.52 miles Cologix Columbus COL1, COL2
COL1 (32,000sqft) and COL2 (20,000sqft) represent 2 phases of buildout in the same building. Cologix entered the Columbus market in February of 2014 through an acquisition of DataCenter.BZ
10.55 miles Cogent: Columbus 3 Edge
Cogent operates a small edge data center at 6520 Proprietors Road in Worthington, north of Columbus, Ohio.
11.25 miles AT&T: Worthington (WOTNOH88)
AT&T's Worthington central office on North High Street is a telephone exchange and tandem switching hub serving the northern Columbus suburbs.
11.60 miles Expedient: Lewis Center (CMH3)
Expedient's CMH3 is a Tier III data center in a former Nationwide facility at 281 East Powell Road in Lewis Center, north of Columbus, Ohio.
11.75 miles Centersquare: Columbus CMH1
Centersquare's CMH1 is a single-story colocation data center in Lewis Center, north of Columbus, Ohio, that Centersquare took over with Cyxtera in 2024.
12.37 miles Cologix: COL6
This planned facility is part of Cologix COL5 campus in Columbus.
12.41 miles Cologix: COL5
Cologix is constructing a 60,000-square-foot, AI-ready facility, COL5, in Columbus, Ohio.
13.79 miles Cogent: Columbus 2 (161 E Goodale)
Cogent operates a small data center at 161 East Goodale Street in Columbus, Ohio, in a former Sprint network building.
13.86 miles Verizon Wireless: Columbus MSC
Verizon Wireless runs a mobile switching center at 289 East Naghten Street in downtown Columbus, Ohio.
13.89 miles Racksquared 325 E Spring St
13.92 miles CityNet Columbus
13.93 miles Lumen: 266 North 5th
13.94 miles Cogent: 240 North 5th
13.95 miles WOW! 226 N 5th
WOW!'s Columbus datacenter was acquired in 2013 from Bluemile assets. The site offers 26,00sqft and can expand to 52,00 sqft.
13.96 miles Lumen: 226 North Fifth
14.08 miles Bresco Broadband: 423 E Town St
Bresco Broadband runs a data center in its downtown Columbus headquarters building at 423 East Town Street, Ohio.
14.15 miles AT&T: Columbus Downtown (CLMBOH11)
AT&T's Columbus Downtown central office at 111 North Fourth Street is the main telephone switching hub and access tandem for the Columbus area.
14.20 miles US Signal Columbus
DC power w/battery backup available
Multiple diverse power feeds from utility grids
14.20 miles CENTRA: 180 East Broad (CMH01)
14.44 miles Zayo: 101 E Town St
Zayo operates a colocation data center on the third floor of 101 East Town Street in downtown Columbus, Ohio, a facility founded as Datacenter101.
14.62 miles Ohio DAS: State of Ohio Computer Center
The State of Ohio Computer Center is the state government's main data center, on the west edge of The Ohio State University campus in Columbus.
14.85 miles R+L Carriers: Delaware, OH
R+L Carriers operates an enterprise data center on Greif Parkway in Delaware, Ohio, which a Roberts family company bought and updated in 2018 and 2019.
14.97 miles Expedient Upper Arlington
15.16 miles Citi: Midwest Data Center
Citi's Midwest Data Center is an enterprise data center Citigroup built at the Park at Greif in Liberty Township, Delaware County, north of Columbus, Ohio.
16.13 miles AEP: Groveport
American Electric Power's Groveport data center is a backup and disaster-recovery facility on South Hamilton Road, linked to AEP's primary data center in New Albany, Ohio.
17.46 miles DartPoints: Dublin, OH
The facility was previously operated by Metro Data Center LLC before being acquired by Dartpoints in October 2020.
17.51 miles Connect Data Centers: Hilliard, OH
US involvement from Oppidan's Hilliard data center spans 89,954 sqft. Oppidan lists Connect Data Centers as a subsidiary.
17.67 miles West TowerInterested in this information?Contact us
17.73 miles LexisNexis: Hilliard
LexisNexis runs a hosted data center inside the former MCI office campus, now owned by Verizon, on Britton Parkway in Hilliard, west of Columbus, Ohio.
17.78 miles Prime HubInterested in this information?Contact us
17.79 miles WestInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.79 miles StationInterested in this information?Contact us
17.79 miles Park AlphaInterested in this information?Contact us
17.81 miles Valley BetaInterested in this information?Contact us
17.88 miles Ridge UltraInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.91 miles South PlazaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.95 miles Prime PlazaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.99 miles Expedient Dublin (CMH2)
Offering 29,000 square foot of total floor space, Expedient’s Dublin data center is powered by redundant electric utility power feeds and 4 auto-cutover diesel generators
18.03 miles Cloud RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.04 miles Valley GammaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.09 miles MaxInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.14 miles Metro TowerInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.22 miles Resilience CMH II
Overwatch Capital and Japanese energy leader Idemitsu have launched a strategic partnership to develop 1 GW of data center capacity across the United States.
18.59 miles CampusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.13 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.23 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.37 miles Kyndryl: Columbus
19.50 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.55 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.99 miles Tower GammaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us

Operating Company

Operated by:

STACK Infrastructure is a privately held platform sponsored by IPI Partners that focuses on large scale wholesale capacity and campus development for hyperscale and enterprise customers.

The company was launched in 2019 when IPI combined the remaining Infomart Data Centers assets with selected T5 Data Centers facilities, and industry coverage at launch cited eight data centers across six U.S. markets totaling about 100 MW. In March 2022, IPI unified DigiPlex in the Nordics and SUPERNAP Italia in Milan under the STACK brand to form STACK EMEA, expanding the platform across Europe. STACK has since added international sites, including the first phase of a 56 MW campus in Toronto and its first Australian data center in Melbourne. Core services referenced by the company and trade press include wholesale colocation, build to suit, and powered shell solutions.

STACK Infrastructure History:

  • 2025: Sold its European enterprise colocation business (seven data centers in Stockholm, Oslo, Copenhagen, Milan and Geneva) to Apollo-managed funds; it now operates as Vaultica. STACK EMEA kept its hyperscale campuses.
  • 2023: Opened the first Australian data center in Melbourne on a multi-building campus.
  • 2023: Delivered the first 8 MW phase of a planned 56 MW campus in Toronto.
  • 2022: Rebranded DigiPlex (Nordics) and SUPERNAP Italia (Milan) as STACK EMEA.
  • 2019: IPI Partners launched STACK Infrastructure by combining the three Infomart Data Centers sites with selected T5 Data Centers assets. The company was rebranded as STACK INFRASTRUCTURE
  • 2018: ASB Real Estate Investments sold the three remaining Infomart Data Centers facilities in San Jose, Hillsboro, and Ashburn to IPI Partners; the Dallas Infomart carrier hotel was sold separately to Equinix earlier that year.
  • 2014: Acquired a facility in Ashburn that had been owned by AOL.
  • 2014: ASB Real Estate Fund, a subsidiary of DCI Technology Holdings, merged Infomart with Fortune Data Centers. The combined company was renamed to Infomart Data Centers.
  • 2012: Expanded to Oregon with a building in Hillsboro
  • 2007: John Sheputis purchased first Fortune Data Center in San Jose, CA, backed by ASB Real Estate
  • 2006: ASB Real Estate purchased Infomart Dallas building
  • 2006: Fortune Founded as Fortune Data Centers
0
Facilities
0
Markets

News See all

Read Clayco and Kiewit Top Out First Building at Project Jupiter in New Mexico
Clayco and Kiewit New Mexico Co. topped out the 855,000-square-foot first building at Project Jupiter, a data center campus in Doña Ana County, [New Mexico](https://baxtel.com/regions/new-mexico). ...

Clayco and Kiewit Top Out First Building at Project Jupiter in New Mexico

October 27, 2026 STACK INFRASTRUCTURE

Clayco and Kiewit New Mexico Co. topped out the 855,000-square-foot first building at Project Jupiter, a data center campus in Doña Ana County, New Mexico. The contractors placed the final structural beam atop the building, completing its primary structural framework, Clayco announced on October...

Read more
Read Stack Infrastructure breaks ground on 60MW data center expansion in California
 Stack Infrastructure breaks ground on 60MW data center expansion in California

Stack Infrastructure breaks ground on 60MW data center expansion in California

March 29, 2024 STACK INFRASTRUCTURE

IPI-owned company Stack Infrastructure announced this week that it has broken ground on a 60MW data center expansion in Silicon Valley, California. The company plans to build two data centers to add 60MW of capacity, an advanced manufacturing facility, and a parking structure, spanning 19 acres....

Read more
Read Stack Infrastructure to expand footprint in Virginia
Stack Infrastructure to expand footprint in Virginia

Stack Infrastructure to expand footprint in Virginia

January 11, 2024 STACK INFRASTRUCTURE

Data center firm Stack Infrastructure this week announced plans to expand its footprint in Virginia with a new 72MW campus in Leesburg. in Loudoun County. This planned facility, known as the NVA-06 will initially host a 48MW building set to deliver Q2 2025, followed by a second 24MW building to...

Read more
Read Stack Infrastructure to expand facility in Virginia’s Prince William County
Stack Infrastructure to expand facility in Virginia’s Prince William County

Stack Infrastructure to expand facility in Virginia’s Prince William County

December 08, 2023 STACK INFRASTRUCTURE

Data center firm Stack Infrastructure announced this week that it is expanding its campus in Virginia’s Prince William County. The company has purchased land from and adjacent to the Youth For Tomorrow non-profit in Bristow to expand its NVA02 campus. Tim Hughes, chief development officer, Stack...

Read more
Read Stack inaugurates a data center in Toronto
Stack inaugurates a data center in Toronto

Stack inaugurates a data center in Toronto

September 22, 2023 STACK INFRASTRUCTURE

Stack Infrastructure has established a data center in Toronto, Canada. This week, the company revealed the dispatch of the first 8MW phase of the 56MW Ontario campus. First Gulf, a Toronto-based developer, collaborated with Stack to execute the initial 8MW data center by refurbishing an existing...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.