Edged Energy: Columbus CMH01

Latest Podcast 6385 New Albany Rd E
Operational
Fully operational facility
Operated by:

Edged Energy: Columbus CMH01

Short Code: CMH01
Year Built: 2025
PUE: 1.15
Utility Provider: AEP
Lot Size: 15 acres
░░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░░ Request Dataset MW
Operational Power

Edged Energy data center spans 206,000 sq ft on a 15-acre parcel at 6385 New Albany Road East. The project, expected to cost $250 million, has received a 15-year 100 percent real property tax abatement.

  • Edged Energy uses a cooling system from the company Thermal Works, described as an "ultra-efficient cooling system that supports the dense AI-driven loads that are reshaping the IT industry without consuming water. According to the data center developer and operator, this saves 380 million gallons of water.
  • The system can enable liquid cooling and air cooling on the same circuit and offer PUEs of around 1.1 to 1.15.

Map and Nearby Locations

6385 New Albany Rd E
Edged Energy Sites
Nearby Facilities

Edged Energy: Columbus CMH01 Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Edged Energy: Columbus CMH01

Distance Site About
0.22 miles Discover Financial Services New Albany
0.30 miles TJX Corporate Techno
0.40 miles Compass New Albany
0.49 miles Compugen New Albany
0.59 miles Stack: NAL01B
NAL01B is STACK's new building on its NAL01 campus on Souder Road, New Albany, Ohio.
0.74 miles Stack: NAL01A
STACK acquired the facility in October 2019 from Nationwide Insurance. Nationwide initially built the facility in 2008 for a cost of $96 million.
2.99 miles Ridge OneInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.22 miles QTS: Babbitt Rd, New Albany
QTS Data Centers wants to build eight additional facilities spanning 3.2 million square feet on 240 acres on Babbitt and Miller roads. It will invest nearly $3 billion in those projects.
3.33 miles West TowerInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.34 miles NorthInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.34 miles StationInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.39 miles AlphaInterested in this information?Contact us
3.42 miles ProInterested in this information?Contact us
3.43 miles Campus ProInterested in this information?Contact us
3.43 miles South ValleyInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.44 miles CentralInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.54 miles Hyperscale Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.57 miles Hyperscale Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.59 miles Vantage: OH11
Vantage has started work on its OH1 data center campus at 3475 Horizon Ct., which is inside the Silicon Heartland Innovation Park.
3.60 miles Vantage: OH13
This facility is a part of Vantage's New Albany data center campus in Ohio.
3.60 miles Vantage: OH12
This facility is a part of Vantage's New Albany data center campus in Ohio.
3.62 miles Hyperscale Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.62 miles Karis Critical: New Albany, OH
Data center developer Karis Critical has purchased 115 acres of land in New Albany, Ohio.
3.62 miles Lincoln Rackhouse: Silicon Heartland Innovation Park
3.67 miles GammaInterested in this information?Contact us
3.69 miles Hyperscale Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.69 miles CloudInterested in this information?Contact us
3.72 miles Hyperscale Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.96 miles Valley PrimeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.97 miles QTS: Miller Road, New Albany
QTS Data Centers wants to build eight additional facilities spanning 3.2 million square feet on 240 acres on Babbitt and Miller roads. It will invest nearly $3 billion in those projects.
4.10 miles Prime StationInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
4.12 miles Valley GammaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
4.14 miles QTS: New Albany 1 DC1
QTS New Albany 1 is a two-building data center campus in New Albany, Ohio. The first building of the campus is located at 1225 Beech Rd SW, New Albany, OH.
4.18 miles Plaza BetaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
4.19 miles QTS: New Albany 1 DC2
QTS New Albany 1 is a two-building data center campus in New Albany, Ohio. The second building, New Albany 1 DC2, of the campus is located at 1275 Beech Rd SW, New Albany, OH.
4.24 miles South RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
4.24 miles EastInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
4.26 miles Tower ProInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
4.34 miles PlazaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
4.37 miles North PlazaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
4.44 miles GammaInterested in this information?Contact us
4.45 miles ProInterested in this information?Contact us
4.46 miles Ridge AlphaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
4.46 miles Cloud ParkInterested in this information?Contact us
4.48 miles Plaza PlusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
4.56 miles GammaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
4.60 miles Central PlazaInterested in this information?Contact us
4.61 miles Metro ValleyInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
4.61 miles StationInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
4.66 miles North ParkInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
4.66 miles QTS: New Albany 2 DC1
New Albany 2 DC1 is the first of two buildings on the QTS New Albany 2 campus, at 785 Beech Rd SW, Pataskala (Etna Township), Ohio.
4.72 miles Prime CampusInterested in this information?Contact us
4.80 miles QTS: New Albany 2 DC2
QTS New Albany 2 is a two-building data center campus in New Albany, Ohio. New Albany 2 DC2 is located at 675 Beech Rd SW, Etna, OH.
4.82 miles Global HubInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
4.82 miles Edge CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
4.85 miles East PointInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
4.89 miles OneInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
4.92 miles EdgeConnex: Johnstown South 2
Phase II of EdgeConneX's Johnstown South Campus will see the construction of a new two-story 700,000 sq ft (65,030 sqm) building.
4.93 miles Metro HubInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
4.97 miles Cloud HubInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
5.01 miles Plaza GammaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
5.03 miles EdgeConnex: Johnstown South 1
EdgeConneX, a US data center operator, invested $137.2 million to acquire nearly 270 acres across multiple sites in Licking County.
5.10 miles EdgeConnex: Johnstown North Campus
EdgeConnex acquired a 170.29-acre parcel of land for roughly $62.2 million, or about $365,017 per acre.
5.17 miles DBT Data: Jug & Mink Project
Washington DC-based DBT-Data plans to develop a data center at the New Albany International Business Park, close to Intel's upcoming chip fab site.
5.17 miles CyrusOne: New Albany COL-1
CyrusOne has broken ground on a $150 million data center development in New Albany, Ohio.
5.40 miles DBT Data: 2214 Harrison Rd
DBT Data acquired 44 acres of land in March 2022 with the intention of developing a data center project on the site.
5.51 miles Cologix: COL8
5.67 miles Cologix: COL7
Cologix has acquired approximately 154 acres of land in Johnstown, Ohio, to develop a new, AI-ready data center campus.
5.70 miles Cologix: Johnstown Expansion
6.73 miles eNET Columbus
6.93 miles WeConnect Westerville
7.91 miles Campus GammaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
7.95 miles CeraNet Columbus
8.35 miles Racksquared 2560 Value Way
9.03 miles Aligned: Pataskala
Aligned Data Centers, is targeting Pataskala for its second development in the Buckeye State.
9.82 miles Cologix Columbus COL4
Cologix is building COL4, a 256,000 square foot data center on 9 acres along Alta View and Worthington Woods boulevards in Ohio. This facility will offer 27 MW of capacity.
9.87 miles Cologix COL3
9.91 miles Cologix Columbus COL1, COL2
COL1 (32,000sqft) and COL2 (20,000sqft) represent 2 phases of buildout in the same building. Cologix entered the Columbus market in February of 2014 through an acquisition of DataCenter.BZ
10.30 miles Core StationInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
10.58 miles GlobalInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
11.04 miles Expedient: Lewis Center (CMH3)
Expedient data center Located at 281 E. Powell Road in Lewis Center township with The 102,000 sq ft (9,475 sqm) facility offers 3MW of initial power capacity that will be increased to 7.5 MW in the future.
11.21 miles Centersquare: Columbus CMH1
DCI Technology Holdings owns the building and is CenturyLink's landlord.
11.86 miles Cologix: COL6
This planned facility is part of Cologix COL5 campus in Columbus.
11.90 miles Cologix: COL5
Cologix is constructing a 60,000-square-foot, AI-ready facility, COL5, in Columbus, Ohio.
13.27 miles Lumen: 580 North 4th
13.46 miles Racksquared 325 E Spring St
13.48 miles CityNet Columbus
13.50 miles Lumen: 266 North 5th
13.51 miles Cogent: 240 North 5th
13.53 miles WOW! 226 N 5th
WOW!'s Columbus datacenter was acquired in 2013 from Bluemile assets. The site offers 26,00sqft and can expand to 52,00 sqft.
13.53 miles Lumen: 226 North Fifth
13.77 miles CENTRA: 180 East Broad (CMH01)
13.77 miles US Signal Columbus
DC power w/battery backup available
Multiple diverse power feeds from utility grids
14.01 miles Crown Castle 101 E Town
Crown Castle acquired Lightower in 2017
14.07 miles Carrier-Neutral Data CenterInterested in this information?Contact us
14.13 miles MicroLink: Mansfield Campus
MicroLink is planning to build a data center in Columbus, Ohio.
14.40 miles Expedient Upper Arlington
15.95 miles Compass Groveport AEP II
American Electric Power invested approximately $125 million into the data center on Hamilton Road
16.68 miles DartPoints: Dublin, OH
The facility was previously operated by Metro Data Center LLC before being acquired by Dartpoints in October 2020.
16.93 miles Connect Data Centers: Hilliard, OH
US involvement from Oppidan's Hilliard data center spans 89,954 sqft. Oppidan lists Connect Data Centers as a subsidiary.
17.09 miles Prime ParkInterested in this information?Contact us
17.20 miles CoreInterested in this information?Contact us
17.21 miles TowerInterested in this information?Contact us
17.21 miles West ValleyInterested in this information?Contact us
17.23 miles Station AlphaInterested in this information?Contact us
17.32 miles CloudInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.35 miles SouthInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.39 miles West PointInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.41 miles Expedient Dublin (CMH2)
Offering 29,000 square foot of total floor space, Expedient’s Dublin data center is powered by redundant electric utility power feeds and 4 auto-cutover diesel generators
17.46 miles South PlazaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.54 miles Station TwoInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.58 miles West CampusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.21 miles Resilience CMH II
Overwatch Capital and Japanese energy leader Idemitsu have launched a strategic partnership to develop 1 GW of data center capacity across the United States.
18.34 miles Core ValleyInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.81 miles Kyndryl: Columbus
19.09 miles Cloud HubInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.45 miles Campus OneInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.46 miles TowerInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.46 miles Center ThreeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.47 miles ProInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.54 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.63 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.91 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.95 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.98 miles OneInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us

Operating Company

Operated by:

Edged Energy is a colocation and data center provider. The company also has data centers in development across the US.

Its Spain business is a subsidiary of Endeavour in collaboration with Merlin Properties.

0
Facilities
0
Markets

News See all

Read Edged Completes Construction Of Data Centers In Council Bluffs, Iowa
US data center operator Edged has completed the structural work on two facilities in Council Bluffs, Iowa. The company announced that OMA01-1 and OMA01-2 have reached the topping-out stage.

"Rea...

Edged Completes Construction Of Data Centers In Council Bluffs, Iowa

September 14, 2026 Edged Energy

US data center operator Edged has completed the structural work on two facilities in Council Bluffs, Iowa. The company announced that OMA01-1 and OMA01-2 have reached the topping-out stage. "Reaching this milestone reflects our continued commitment to investing in communities that are positioned...

Read more
Read Edged Raises Nearly $2 Billion to Accelerate U.S. Data Center Expansion
Edged Raises Nearly $2 Billion to Accelerate U.S. Data Center Expansion

Edged Raises Nearly $2 Billion to Accelerate U.S. Data Center Expansion

May 29, 2026 Edged Energy

US data center developer Edged has secured nearly $2 billion in financing so far this year to support the expansion of its data center portfolio. The company said the capital will be used to advance projects in key markets, including Atlanta, Chicago, and Council Bluffs. The funding package...

Read more
Read Edged Opens 36MW Data Center in Phoenix, Arizona
Edged Opens 36MW Data Center in Phoenix, Arizona

Edged Opens 36MW Data Center in Phoenix, Arizona

April 08, 2026 Edged Energy

US operator Edged has launched a new data center in Phoenix, Arizona. The Endeavour-owned company this month announced the opening of its PHX01-1 facility. Situated on a 12-acre site at 8811 E. Warner Road in Mesa, Maricopa County, the two-story building delivers 36MW of capacity across 210,000...

Read more
Read Edged secures permission for second data center at Irving campus, Tex
Edged secures permission for second data center at Irving campus, Tex

Edged secures permission for second data center at Irving campus, Tex

January 17, 2026 Edged Energy

Data center operator Edged this week announced plans to add a second data center to its Edged Dallas campus in Irving, Dallas County. The news follows Irving City Council voting unanimously to approve the expansion, which will be located on North Wildwood Drive in the industrial area east of...

Read more
Read Edged Breaks Ground on Second Chicago Faciity
Edged Breaks Ground on Second Chicago Faciity

Edged Breaks Ground on Second Chicago Faciity

November 21, 2025 Edged Energy

Data center firm Edged has broken ground on a second data center in Chicago, Illinois. Located at 2835 Bilter Road, the new facility will be purpose-built for high-density AI workloads and feature advanced closed-loop, waterless cooling. The facility will go live in Q2 2027. “Safety and...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?