Edged Energy: Columbus CMH01

Latest Podcast 6385 New Albany Rd E
Operational
Fully operational facility
Operated by:

Edged Energy: Columbus CMH01

Short Code: CMH01
Year Built: 2025
PUE: 1.15
Utility Provider: AEP
Lot Size: 15 acres
░░░░░░░ Login to view SqFt
Total Building Size
░░░░ Request Dataset MW
Total Power

Edged Energy data center spans 206,000 sq ft on a 15-acre parcel at 6385 New Albany Road East. The project, expected to cost $250 million, has received a 15-year 100 percent real property tax abatement.

  • Edged Energy uses a cooling system from the company Thermal Works, described as an "ultra-efficient cooling system that supports the dense AI-driven loads that are reshaping the IT industry without consuming water. According to the data center developer and operator, this saves 380 million gallons of water.
  • The system can enable liquid cooling and air cooling on the same circuit and offer PUEs of around 1.1 to 1.15.

Map and Nearby Locations

6385 New Albany Rd E
Edged Energy Sites
Nearby Facilities

Edged Energy: Columbus CMH01 Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Edged Energy: Columbus CMH01

Distance Site About
0.22 miles Discover Financial Services New Albany
0.30 miles TJX Corporate Techno
0.40 miles Compass New Albany
0.49 miles Compugen New Albany
0.59 miles Stack: NAL01B
STACK INFRASTRUCTURE is expanding it's NAL01 campus, located at Souder Road, New Albany, OH.
0.74 miles STACK New Albany NAL01
STACK acquired the facility in October 2019 from Nationwide Insurance. Nationwide initially built the facility in 2008 for a cost of $96 million.
2.99 miles HubInterested in this information?Contact us
Microsoft purchased 183 acres of land on Beech Road in New Albany in 2023.
3.22 miles QTS: Babbitt Rd, New Albany
QTS Data Centers wants to build eight additional facilities spanning 3.2 million square feet on 240 acres on Babbitt and Miller roads. It will invest nearly $3 billion in those projects.
3.33 miles Cloud HubInterested in this information?Contact us
This facility is part of Amazon's 3180 Beech Road Campus in New Albany.
3.34 miles Metro ParkInterested in this information?Contact us
This facility is part of Amazon's 3180 Beech Road Campus in New Albany.
3.34 miles West TowerInterested in this information?Contact us
This facility is part of Amazon's 3180 Beech Road Campus in New Albany.
3.39 miles MaxInterested in this information?Contact us
3.42 miles West TowerInterested in this information?Contact us
3.43 miles Park PlusInterested in this information?Contact us
3.43 miles Central ValleyInterested in this information?Contact us
This facility is part of Amazon's 3180 Beech Road Campus in New Albany.
3.44 miles Plaza ThreeInterested in this information?Contact us
This facility is part of Amazon's 3180 Beech Road Campus in New Albany.
3.54 miles Hyperscale Data CenterInterested in this information?Contact us
This facility will be part of Amazon's new data center campus along Beech and Miller roads in New Albany.
3.57 miles Hyperscale Data CenterInterested in this information?Contact us
This facility will be part of Amazon's new data center campus along Beech and Miller roads in New Albany.
3.59 miles Vantage: New Albany (OH1)
Vantage has started work on its OH1 data center campus at 3475 Horizon Ct., which is inside the Silicon Heartland Innovation Park.
3.60 miles Vantage: OH13
This facility is a part of Vantage's New Albany data center campus in Ohio.
3.60 miles Vantage: OH12
This facility is a part of Vantage's New Albany data center campus in Ohio.
3.62 miles Karis Critical: New Albany, OH
Data center developer Karis Critical has purchased 115 acres of land in New Albany, Ohio.
3.62 miles Lincoln Rackhouse: Silicon Heartland Innovation Park
3.67 miles Station ThreeInterested in this information?Contact us
3.69 miles Hyperscale Data CenterInterested in this information?Contact us
Amazon is building five data centers and related buildings totaling 1.25 million square feet on 85 of the 439 acres the company bought along Beech and Miller roads in early 2023.
3.69 miles Tower PlusInterested in this information?Contact us
3.71 miles Hyperscale Data CenterInterested in this information?Contact us
This facility will be part of Amazon's new data center campus along Beech and Miller roads in New Albany.
3.72 miles Hyperscale Data CenterInterested in this information?Contact us
This facility will be part of Amazon's new data center campus along Beech and Miller roads in New Albany.
3.96 miles ThreeInterested in this information?Contact us
This facility is part of Google's New Albany campus in Ohio.
3.97 miles QTS: Miller Road, New Albany
QTS Data Centers wants to build eight additional facilities spanning 3.2 million square feet on 240 acres on Babbitt and Miller roads. It will invest nearly $3 billion in those projects.
4.10 miles ParkInterested in this information?Contact us
The campus is located on a 447-acre site on the west side of Beech Road, south of the state Route 161 interchange.
4.12 miles MaxInterested in this information?Contact us
This facility is part of Google's New Albany campus in Ohio.
4.14 miles QTS: New Albany 1 DC1
QTS New Albany 1 is a two-building data center campus in New Albany, Ohio. The first building of the campus is located at 1225 Beech Rd SW, New Albany, OH.
4.18 miles TowerInterested in this information?Contact us
This facility is part of Google's New Albany campus in Ohio.
4.19 miles QTS: New Albany 1 DC2
QTS New Albany 1 is a two-building data center campus in New Albany, Ohio. The second building, New Albany 1 DC2, of the campus is located at 1275 Beech Rd SW, New Albany, OH.
4.24 miles ValleyInterested in this information?Contact us
This facility is part of Google's New Albany campus in Ohio.
4.24 miles Hub AlphaInterested in this information?Contact us
Google recently expanded its footprint in Ohio, acquiring nearly 85 acres of land in New Albany, outside Columbus, for $63 million.
4.26 miles PrimeInterested in this information?Contact us
Meta operates a data center campus in New Albany, Ohio, located at 1 Community Circle. The New Albany site consists of five data centers, spanning a total of 2.5 million square feet.
4.34 miles Park GammaInterested in this information?Contact us
This data center is a part of Meta's New Albany Campus in Ohio.
4.37 miles Prime ParkInterested in this information?Contact us
This facility is part of Google's New Albany campus in Ohio.
4.44 miles Core PointInterested in this information?Contact us
4.45 miles PlazaInterested in this information?Contact us
4.46 miles ValleyInterested in this information?Contact us
This data center is a part of Meta's New Albany Campus in Ohio.
4.46 miles West HubInterested in this information?Contact us
4.48 miles HubInterested in this information?Contact us
This facility is part of Google's New Albany campus in Ohio.
4.56 miles Center BetaInterested in this information?Contact us
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
4.60 miles Tower ProInterested in this information?Contact us
4.61 miles Hub UltraInterested in this information?Contact us
Meta’s $42 million acquisition of the Clover Valley Road parcel through its subsidiary Sidecat LLC marks a strategic expansion of the Prometheus AI Supercluster in New Albany, Ohio.
4.61 miles South TowerInterested in this information?Contact us
This data center is a part of Meta's New Albany Campus in Ohio.
4.66 miles SouthInterested in this information?Contact us
This data center is a part of Meta's New Albany Campus in Ohio.
4.66 miles QTS: New Albany 2 DC1
QTS New Albany 2 is a two-building data center campus in New Albany, Ohio. New Albany 2 DC1 is located at 785 Beech Rd SW, Pataskala, OH.
4.72 miles ProInterested in this information?Contact us
4.80 miles QTS: New Albany 2 DC2
QTS New Albany 2 is a two-building data center campus in New Albany, Ohio. New Albany 2 DC2 is located at 675 Beech Rd SW, Etna, OH.
4.82 miles Hub BetaInterested in this information?Contact us
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
4.82 miles South CenterInterested in this information?Contact us
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
4.85 miles Point BetaInterested in this information?Contact us
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
4.89 miles West ParkInterested in this information?Contact us
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
4.92 miles EdgeConnex: Johnstown South 2
Phase II of EdgeConneX's Johnstown South Campus will see the construction of a new two-story 700,000 sq ft (65,030 sqm) building.
4.93 miles Cloud CampusInterested in this information?Contact us
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
4.97 miles HubInterested in this information?Contact us
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
5.01 miles Station AlphaInterested in this information?Contact us
The Prometheus data center campus in New Albany, Ohio, serves as a primary hub for Meta's AI training infrastructure.
5.03 miles EdgeConnex: Johnstown South Campus
EdgeConneX, a US data center operator, invested $137.2 million to acquire nearly 270 acres across multiple sites in Licking County.
5.10 miles EdgeConnex: Johnstown North Campus
EdgeConnex acquired a 170.29-acre parcel of land for roughly $62.2 million, or about $365,017 per acre.
5.17 miles CyrusOne: New Albany COL-1
CyrusOne has broken ground on a $150 million data center development in New Albany, Ohio.
5.17 miles DBT Data: Jug & Mink Project
Washington DC-based DBT-Data plans to develop a data center at the New Albany International Business Park, close to Intel's upcoming chip fab site.
5.40 miles DBT Data: 2214 Harrison Rd
DBT Data acquired 44 acres of land in March 2022 with the intention of developing a data center project on the site.
5.51 miles Cologix: Johnstown COL8
5.67 miles Cologix: Johnstown COL7
Cologix has acquired approximately 154 acres of land in Johnstown, Ohio, to develop a new, AI-ready data center campus.
5.70 miles Cologix: Johnstown Expansion
6.73 miles eNET Columbus
6.93 miles WeConnect Westerville
7.91 miles Hub OneInterested in this information?Contact us
Construction of the first 450,000 square foot (41,800 sq m) building is expected to begin in January 2028 and be completed by December 2034.
7.95 miles CeraNet Columbus
8.35 miles Racksquared 2560 Value Way
9.03 miles Aligned: Pataskala
Aligned Data Centers, is targeting Pataskala for its second development in the Buckeye State.
9.82 miles Cologix Columbus COL4
Cologix is building COL4, a 256,000 square foot data center on 9 acres along Alta View and Worthington Woods boulevards in Ohio. This facility will offer 27 MW of capacity.
9.87 miles Cologix COL3
9.91 miles Cologix Columbus COL1, COL2
COL1 (32,000sqft) and COL2 (20,000sqft) represent 2 phases of buildout in the same building. Cologix entered the Columbus market in February of 2014 through an acquisition of DataCenter.BZ
10.30 miles Prime StationInterested in this information?Contact us
Microsoft acquired 289 acres of land in Pataskala for $30.7 million.
10.58 miles BetaInterested in this information?Contact us
Microsoft expanded its Ohio footprint in 2024, purchasing an additional 43 acres in Pataskala for $11.44 million.
11.04 miles Expedient: Lewis Center (CMH3)
Expedient data center Located at 281 E. Powell Road in Lewis Center township with The 102,000 sq ft (9,475 sqm) facility offers 3MW of initial power capacity that will be increased to 7.5 MW in the future.
11.21 miles Centersquare: Columbus CMH1
DCI Technology Holdings owns the building and is CenturyLink's landlord.
11.86 miles Cologix: COL6
This planned facility is part of Cologix COL5 campus in Columbus.
11.90 miles Cologix: Columbus COL5
Cologix is constructing a 60,000-square-foot, AI-ready facility, COL5, in Columbus, Ohio.
13.27 miles Lumen: 580 North 4th
13.46 miles Racksquared 325 E Spring St
13.48 miles CityNet Columbus
13.50 miles Lumen: 266 North 5th
13.51 miles Cogent: 240 North 5th
13.53 miles Lumen: 226 North Fifth
13.53 miles WOW! 226 N 5th
WOW!'s Columbus datacenter was acquired in 2013 from Bluemile assets. The site offers 26,00sqft and can expand to 52,00 sqft.
13.77 miles CENTRA: 180 East Broad (CMH01)
13.77 miles US Signal Columbus
DC power w/battery backup available
Multiple diverse power feeds from utility grids
14.01 miles Crown Castle 101 E Town
Crown Castle acquired Lightower in 2017
14.07 miles Carrier-Neutral Data CenterInterested in this information?Contact us
14.13 miles MicroLink: Mansfield Campus
MicroLink is planning to build a data center in Columbus, Ohio.
14.40 miles Expedient Upper Arlington
15.95 miles Compass Groveport AEP II
American Electric Power invested approximately $125 million into the data center on Hamilton Road
16.68 miles DartPoints: Dublin, OH
The facility was previously operated by Metro Data Center LLC before being acquired by Dartpoints in October 2020.
16.93 miles Connect Data Centers: Hilliard, OH
US involvement from Oppidan's Hilliard data center spans 89,954 sqft. Oppidan lists Connect Data Centers as a subsidiary.
17.09 miles Plaza MaxInterested in this information?Contact us
17.20 miles Hub UltraInterested in this information?Contact us
17.21 miles Prime PlazaInterested in this information?Contact us
17.21 miles Metro CenterInterested in this information?Contact us
17.23 miles StationInterested in this information?Contact us
17.32 miles Plaza UltraInterested in this information?Contact us
Amazon is constructing its third data center campus in Hilliard at the intersection of Scioto Darby Road and the Interstate 270 overpass.
17.35 miles Cloud ValleyInterested in this information?Contact us
The complex will comprise seven buildings for data center operations and an additional structure for security and utilities.
17.39 miles PlazaInterested in this information?Contact us
Amazon is constructing its third data center campus in Hilliard at the intersection of Scioto Darby Road and the Interstate 270 overpass.
17.41 miles Expedient Dublin (CMH2)
Offering 29,000 square foot of total floor space, Expedient’s Dublin data center is powered by redundant electric utility power feeds and 4 auto-cutover diesel generators
17.46 miles TowerInterested in this information?Contact us
Amazon is constructing its third data center campus in Hilliard at the intersection of Scioto Darby Road and the Interstate 270 overpass.
17.54 miles South TowerInterested in this information?Contact us
Amazon is constructing its third data center campus in Hilliard at the intersection of Scioto Darby Road and the Interstate 270 overpass.
17.58 miles GammaInterested in this information?Contact us
Amazon is constructing its third data center campus in Hilliard at the intersection of Scioto Darby Road and the Interstate 270 overpass.
18.21 miles Resilience CMH II
Overwatch Capital and Japanese energy leader Idemitsu have launched a strategic partnership to develop 1 GW of data center capacity across the United States.
18.34 miles Center PlusInterested in this information?Contact us
Microsoft put its data center construction plans on hold in New Albany, Heath, and Hebron in April 2025.
18.81 miles Kyndryl: Columbus
19.09 miles North HubInterested in this information?Contact us
Microsoft put its data center construction plans on hold in New Albany, Heath, and Hebron in April 2025.
19.45 miles Core TowerInterested in this information?Contact us
This data center is a part of amazon's Cosgray Road Campus in Hilliard, Ohio.
19.46 miles Plaza UltraInterested in this information?Contact us
This data center is a part of amazon's Cosgray Road Campus in Hilliard, Ohio.
19.46 miles Global PlazaInterested in this information?Contact us
This data center is a part of amazon's Cosgray Road Campus in Hilliard, Ohio.
19.47 miles HubInterested in this information?Contact us
Amazon's second data center campus in Hilliard, Ohio, is situated on a 104-acre site between Cosgray and Leppert roads.
19.54 miles Carrier-Neutral Data CenterInterested in this information?Contact us
Vantage plans to build another data center campus near Columbus, Ohio.
19.63 miles Carrier-Neutral Data CenterInterested in this information?Contact us
This facility is part of Vantage's OH-E Campus in Ohio.
19.91 miles Carrier-Neutral Data CenterInterested in this information?Contact us
This facility is part of Vantage's OH-E Campus in Ohio.
19.95 miles Carrier-Neutral Data CenterInterested in this information?Contact us
This facility is part of Vantage's OH-E Campus in Ohio.
19.98 miles Plaza PlusInterested in this information?Contact us
In March 2021, Columbus City Council approved $54.3 million in tax incentives to develop a data center on the former Hartman Farm site.

Edged Energy: Columbus CMH01 Data Center Photos See all

Operating Company

Operated by:

Edged Energy is a colocation and data center provider. The company also has data centers in development across the US.

Its Spain business is a subsidiary of Endeavour in collaboration with Merlin Properties.

44
Facilities
23
Markets

News See all

Read Edged Raises Nearly $2 Billion to Accelerate U.S. Data Center Expansion
Edged Raises Nearly $2 Billion to Accelerate U.S. Data Center Expansion

Edged Raises Nearly $2 Billion to Accelerate U.S. Data Center Expansion

May 29, 2026 Edged Energy

US data center developer Edged has secured nearly $2 billion in financing so far this year to support the expansion of its data center portfolio. The company said the capital will be used to advance projects in key markets, including Atlanta, Chicago, and Council Bluffs. The funding package...

Read more
Read Edged Opens 36MW Data Center in Phoenix, Arizona
Edged Opens 36MW Data Center in Phoenix, Arizona

Edged Opens 36MW Data Center in Phoenix, Arizona

April 08, 2026 Edged Energy

US operator Edged has launched a new data center in Phoenix, Arizona. The Endeavour-owned company this month announced the opening of its PHX01-1 facility. Situated on a 12-acre site at 8811 E. Warner Road in Mesa, Maricopa County, the two-story building delivers 36MW of capacity across 210,000...

Read more
Read Edged secures permission for second data center at Irving campus, Tex
Edged secures permission for second data center at Irving campus, Tex

Edged secures permission for second data center at Irving campus, Tex

January 17, 2026 Edged Energy

Data center operator Edged this week announced plans to add a second data center to its Edged Dallas campus in Irving, Dallas County. The news follows Irving City Council voting unanimously to approve the expansion, which will be located on North Wildwood Drive in the industrial area east of...

Read more
Read Edged Breaks Ground on Second Chicago Faciity
Edged Breaks Ground on Second Chicago Faciity

Edged Breaks Ground on Second Chicago Faciity

November 21, 2025 Edged Energy

Data center firm Edged has broken ground on a second data center in Chicago, Illinois. Located at 2835 Bilter Road, the new facility will be purpose-built for high-density AI workloads and feature advanced closed-loop, waterless cooling. The facility will go live in Q2 2027. “Safety and...

Read more
Read Edged Opens Data Center in New Albany, Ohio
Edged Opens Data Center in New Albany, Ohio

Edged Opens Data Center in New Albany, Ohio

September 24, 2025 Edged Energy

Data center operator Edged recently celebrated the opening of its newest data center in New Albany. Tthe two-story facility delivers 24MW of capacity across 206,000 sq ft (19,140 sqm).“This project would not have been possible without the support of the City of New Albany, who has been unwavering...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?