0.19 miles
|
Discover Financial Services New Albany
|
|
|
0.31 miles
|
TJX Corporate Techno
|
|
|
0.40 miles
|
AEP: New Albany
|
AEP (American Electric Power) operates this data center in the New Albany International Business Park, Ohio. Compass Datacenters built the single-story facility for AEP in 2015.
|
|
0.54 miles
|
Centra: New Albany (CMH1)
|
CENTRA is building CMH1, a two-story data center on a 15.8-acre site on Central College Road in the New Albany International Business Park, Ohio.
|
|
0.58 miles
|
Compugen New Albany
|
|
|
0.63 miles
|
Stack: NAL01B
|
NAL01B is STACK's new building on its NAL01 campus on Souder Road, New Albany, Ohio.
|
|
0.79 miles
|
Stack: NAL01A
|
STACK acquired the facility in October 2019 from Nationwide Insurance. Nationwide initially built the facility in 2008 for a cost of $96 million.
|
|
3.02 miles
|
Core PlazaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
3.04 miles
|
East RidgeInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
3.15 miles
|
Plaza PrimeInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
3.17 miles
|
Central ValleyInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
3.19 miles
|
ParkInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
3.21 miles
|
RidgeInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
3.24 miles
|
Core HubInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
3.24 miles
|
QTS: Babbitt Rd, New Albany
|
QTS Data Centers wants to build eight additional facilities spanning 3.2 million square feet on 240 acres on Babbitt and Miller roads. It will invest nearly $3 billion in those projects.
|
|
3.38 miles
|
WestInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
3.38 miles
|
Cloud ParkInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
3.39 miles
|
West ParkInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
3.43 miles
|
Hub PlusInterested in this information?Contact us
|
|
|
3.47 miles
|
Valley MaxInterested in this information?Contact us
|
|
|
3.47 miles
|
ValleyInterested in this information?Contact us
|
|
|
3.48 miles
|
RidgeInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
3.48 miles
|
North ParkInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
3.59 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
3.61 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
3.62 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
3.64 miles
|
Vantage: OH11
|
Vantage has started work on its OH1 data center campus at 3475 Horizon Ct., which is inside the Silicon Heartland Innovation Park.
|
|
3.64 miles
|
Vantage: OH13
|
This facility is a part of Vantage's New Albany data center campus in Ohio.
|
|
3.64 miles
|
Vantage: OH12
|
This facility is a part of Vantage's New Albany data center campus in Ohio.
|
|
3.67 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
3.67 miles
|
Karis Critical: New Albany, OH
|
Data center developer Karis Critical has purchased 115 acres of land in New Albany, Ohio.
|
|
3.67 miles
|
Lincoln Rackhouse: Silicon Heartland Innovation Park
|
|
|
3.71 miles
|
Plaza OneInterested in this information?Contact us
|
|
|
3.73 miles
|
West StationInterested in this information?Contact us
|
|
|
3.74 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
3.77 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
3.98 miles
|
StationInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
4.01 miles
|
QTS: Miller Road, New Albany
|
QTS Data Centers wants to build eight additional facilities spanning 3.2 million square feet on 240 acres on Babbitt and Miller roads. It will invest nearly $3 billion in those projects.
|
|
4.12 miles
|
Metro PlazaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
4.13 miles
|
Hub AlphaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
4.16 miles
|
QTS: New Albany 1 DC1
|
QTS New Albany 1 is a two-building data center campus in New Albany, Ohio. The first building of the campus is located at 1225 Beech Rd SW, New Albany, OH.
|
|
4.20 miles
|
Plaza PrimeInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
4.20 miles
|
Valley ThreeInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
4.22 miles
|
QTS: New Albany 1 DC2
|
QTS New Albany 1 is a two-building data center campus in New Albany, Ohio. The second building, New Albany 1 DC2, of the campus is located at 1275 Beech Rd SW, New Albany, OH.
|
|
4.26 miles
|
East PlazaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
4.29 miles
|
PlusInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
4.29 miles
|
GlobalInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
4.37 miles
|
Prime PlazaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
4.38 miles
|
EdgeConneX: Piper Farms
|
EdgeConneX bought about 136 acres on Johnstown-Utica Road and Green Chapel Road in Monroe Township, Licking County, Ohio, in November 2025 for future data center development.
|
|
4.39 miles
|
Hub AlphaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
4.48 miles
|
Point ProInterested in this information?Contact us
|
|
|
4.48 miles
|
AlphaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
4.49 miles
|
East CenterInterested in this information?Contact us
|
|
|
4.49 miles
|
South StationInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
4.50 miles
|
Cloud PlazaInterested in this information?Contact us
|
|
|
4.60 miles
|
South CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
4.64 miles
|
South RidgeInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
4.64 miles
|
Cloud StationInterested in this information?Contact us
|
|
|
4.68 miles
|
Cloud StationInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
4.68 miles
|
QTS: New Albany 2 DC1
|
New Albany 2 DC1 is the first of two buildings on the QTS New Albany 2 campus, at 785 Beech Rd SW, Pataskala (Etna Township), Ohio.
|
|
4.77 miles
|
West StationInterested in this information?Contact us
|
|
|
4.77 miles
|
PrimeInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
4.82 miles
|
QTS: New Albany 2 DC2
|
QTS New Albany 2 is a two-building data center campus in New Albany, Ohio. New Albany 2 DC2 is located at 675 Beech Rd SW, Etna, OH.
|
|
4.84 miles
|
Ridge ProInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
4.85 miles
|
TowerInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
4.88 miles
|
Valley OneInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
4.91 miles
|
Plaza UltraInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
4.95 miles
|
PlusInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
4.99 miles
|
SouthInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
5.04 miles
|
Hub AlphaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
5.08 miles
|
EdgeConnex: Johnstown South 1
|
EdgeConneX, a US data center operator, invested $137.2 million to acquire nearly 270 acres across multiple sites in Licking County.
|
|
5.14 miles
|
EdgeConnex: Johnstown North Campus
|
EdgeConnex acquired a 170.29-acre parcel of land for roughly $62.2 million, or about $365,017 per acre.
|
|
5.16 miles
|
EdgeConnex: Johnstown South 2
|
Phase II of EdgeConneX's Johnstown South Campus will see the construction of a new two-story 700,000 sq ft (65,030 sqm) building.
|
|
5.17 miles
|
DBT Data: 2214 Harrison Rd
|
DBT-Data bought 44 acres on Harrison Road SW in Jersey Township in March 2022 for a data center project. The land was sold in 2025 for a natural gas power plant.
|
|
5.17 miles
|
CyrusOne: New Albany COL-1
|
CyrusOne has broken ground on a $150 million data center development in New Albany, Ohio.
|
|
5.46 miles
|
Cologix: Johnstown Expansion
|
|
|
5.63 miles
|
Cologix: COL7
|
Cologix has acquired approximately 154 acres of land in Johnstown, Ohio, to develop a new, AI-ready data center campus.
|
|
5.73 miles
|
ParkInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
5.77 miles
|
Cologix: COL8
|
COL8 is a single-story, liquid-cooled data center under construction on Cologix's Johnstown campus in Licking County, Ohio.
|
|
6.68 miles
|
eNET Columbus
|
|
|
6.96 miles
|
WeConnect Westerville
|
|
|
7.92 miles
|
PlusInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
7.92 miles
|
CeraNet Columbus
|
|
|
8.30 miles
|
Racksquared 2560 Value Way
|
|
|
9.22 miles
|
Aligned: Pataskala
|
Aligned Data Centers, is targeting Pataskala for its second development in the Buckeye State.
|
|
9.73 miles
|
Cologix Columbus COL4
|
COL4 is a three-hall colocation data center that Cologix completed in May 2024 on Alta View Boulevard in north Columbus, Ohio, next to its COL1-3 facilities.
|
|
9.73 miles
|
Lambda: Columbus COL4
|
Lambda runs GPU clusters in Cologix's COL4 data center in north Columbus, Ohio.
|
|
9.82 miles
|
Cologix COL3
|
|
|
9.84 miles
|
T-Mobile: Columbus MSC
|
T-Mobile runs a mobile switching center on Alta View Boulevard in north Columbus, Ohio.
|
|
9.89 miles
|
Cologix Columbus COL1, COL2
|
COL1 (32,000sqft) and COL2 (20,000sqft) represent 2 phases of buildout in the same building.
Cologix entered the Columbus market in February of 2014 through an acquisition of DataCenter.BZ
|
|
9.92 miles
|
Cogent: Columbus 3 Edge
|
Cogent operates a small edge data center at 6520 Proprietors Road in Worthington, north of Columbus, Ohio.
|
|
9.99 miles
|
Government Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
10.31 miles
|
Hub PrimeInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
10.59 miles
|
StationInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
10.62 miles
|
AT&T: Worthington (WOTNOH88)
|
AT&T's Worthington central office on North High Street is a telephone exchange and tandem switching hub serving the northern Columbus suburbs.
|
|
11.00 miles
|
Expedient: Lewis Center (CMH3)
|
Expedient's CMH3 is a Tier III data center in a former Nationwide facility at 281 East Powell Road in Lewis Center, north of Columbus, Ohio.
|
|
11.18 miles
|
Centersquare: Columbus CMH1
|
Centersquare's CMH1 is a single-story colocation data center in Lewis Center, north of Columbus, Ohio, that Centersquare took over with Cyxtera in 2024.
|
|
11.83 miles
|
Cologix: COL6
|
This planned facility is part of Cologix COL5 campus in Columbus.
|
|
11.87 miles
|
Cologix: COL5
|
Cologix is constructing a 60,000-square-foot, AI-ready facility, COL5, in Columbus, Ohio.
|
|
13.30 miles
|
Cogent: Columbus 2 (161 E Goodale)
|
Cogent operates a small data center at 161 East Goodale Street in Columbus, Ohio, in a former Sprint network building.
|
|
13.38 miles
|
Verizon Wireless: Columbus MSC
|
Verizon Wireless runs a mobile switching center at 289 East Naghten Street in downtown Columbus, Ohio.
|
|
13.42 miles
|
Racksquared 325 E Spring St
|
|
|
13.44 miles
|
CityNet Columbus
|
|
|
13.46 miles
|
Lumen: 266 North 5th
|
|
|
13.47 miles
|
Cogent: 240 North 5th
|
|
|
13.48 miles
|
WOW! 226 N 5th
|
WOW!'s Columbus datacenter was acquired in 2013 from Bluemile assets. The site offers 26,00sqft and can expand to 52,00 sqft.
|
|
13.48 miles
|
Lumen: 226 North Fifth
|
|
|
13.63 miles
|
Bresco Broadband: 423 E Town St
|
Bresco Broadband runs a data center in its downtown Columbus headquarters building at 423 East Town Street, Ohio.
|
|
13.68 miles
|
AT&T: Columbus Downtown (CLMBOH11)
|
AT&T's Columbus Downtown central office at 111 North Fourth Street is the main telephone switching hub and access tandem for the Columbus area.
|
|
13.73 miles
|
US Signal Columbus
|
DC power w/battery backup available
Multiple diverse power feeds from utility grids
|
|
13.73 miles
|
CENTRA: 180 East Broad (CMH01)
|
|
|
13.97 miles
|
Zayo: 101 E Town St
|
Zayo operates a colocation data center on the third floor of 101 East Town Street in downtown Columbus, Ohio, a facility founded as Datacenter101.
|
|
14.06 miles
|
Ohio DAS: State of Ohio Computer Center
|
The State of Ohio Computer Center is the state government's main data center, on the west edge of The Ohio State University campus in Columbus.
|
|
14.34 miles
|
R+L Carriers: Delaware, OH
|
R+L Carriers operates an enterprise data center on Greif Parkway in Delaware, Ohio, which a Roberts family company bought and updated in 2018 and 2019.
|
|
14.35 miles
|
Expedient Upper Arlington
|
|
|
14.65 miles
|
Citi: Midwest Data Center
|
Citi's Midwest Data Center is an enterprise data center Citigroup built at the Park at Greif in Liberty Township, Delaware County, north of Columbus, Ohio.
|
|
15.95 miles
|
AEP: Groveport
|
American Electric Power's Groveport data center is a backup and disaster-recovery facility on South Hamilton Road, linked to AEP's primary data center in New Albany, Ohio.
|
|
16.83 miles
|
DartPoints: Dublin, OH
|
The facility was previously operated by Metro Data Center LLC before being acquired by Dartpoints in October 2020.
|
|
16.88 miles
|
Connect Data Centers: Hilliard, OH
|
US involvement from Oppidan's Hilliard data center spans 89,954 sqft. Oppidan lists Connect Data Centers as a subsidiary.
|
|
17.04 miles
|
TowerInterested in this information?Contact us
|
|
|
17.11 miles
|
LexisNexis: Hilliard
|
LexisNexis runs a hosted data center inside the former MCI office campus, now owned by Verizon, on Britton Parkway in Hilliard, west of Columbus, Ohio.
|
|
17.15 miles
|
TwoInterested in this information?Contact us
|
|
|
17.16 miles
|
South PointInterested in this information?Contact us
|
|
|
17.16 miles
|
Center GammaInterested in this information?Contact us
|
|
|
17.18 miles
|
MetroInterested in this information?Contact us
|
|
|
17.27 miles
|
Hub ProInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
17.30 miles
|
ValleyInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
17.34 miles
|
West CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
17.36 miles
|
Expedient Dublin (CMH2)
|
Offering 29,000 square foot of total floor space, Expedient’s Dublin data center is powered by redundant electric utility power feeds and 4 auto-cutover diesel generators
|
|
17.43 miles
|
Central ParkInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
17.43 miles
|
Hub MaxInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
17.49 miles
|
UltraInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
17.53 miles
|
Prime HubInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
18.20 miles
|
Resilience CMH II
|
Overwatch Capital and Japanese energy leader Idemitsu have launched a strategic partnership to develop 1 GW of data center capacity across the United States.
|
|
18.38 miles
|
Hub AlphaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
18.81 miles
|
Kyndryl: Columbus
|
|
|
19.12 miles
|
Point AlphaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
19.40 miles
|
ValleyInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
19.41 miles
|
PrimeInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
19.41 miles
|
CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
19.42 miles
|
Core PlazaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
19.56 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
19.65 miles
|
Core ValleyInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
19.66 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
19.93 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
19.95 miles
|
Campus GammaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
19.97 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|