Racksquared 325 E Spring St

Latest Podcast 325 E Spring St
Operational
Fully operational facility
Operated by:

Racksquared 325 E Spring St

░░░ Request Dataset MW
Total Power

Map and Nearby Locations

325 E Spring St
Racksquared Data Centers, LLC Sites
Nearby Facilities

Sites within 15 miles of Racksquared 325 E Spring St

Distance Site About
0.15 miles CityNet Columbus
0.16 miles Lumen: 226 North Fifth
0.16 miles WOW! 226 N 5th
WOW!'s Columbus datacenter was acquired in 2013 from Bluemile assets. The site offers 26,00sqft and can expand to 52,00 sqft.
0.18 miles Cogent: 240 North 5th
0.20 miles Lumen: 266 North 5th
0.31 miles CENTRA: 180 East Broad (CMH01)
0.31 miles US Signal Columbus
DC power w/battery backup available
Multiple diverse power feeds from utility grids
0.60 miles Crown Castle 101 E Town
Crown Castle acquired Lightower in 2017
0.61 miles Lumen: 580 North 4th
0.64 miles Carrier-Neutral Data CenterInterested in this information?Contact us
1.46 miles MicroLink: Mansfield Campus
MicroLink is planning to build a data center in Columbus, Ohio.
5.86 miles Racksquared 2560 Value Way
6.43 miles Kyndryl: Columbus
7.56 miles CeraNet Columbus
7.74 miles Campus MaxInterested in this information?Contact us
Amazon is constructing its third data center campus in Hilliard at the intersection of Scioto Darby Road and the Interstate 270 overpass.
7.78 miles Campus OneInterested in this information?Contact us
The complex will comprise seven buildings for data center operations and an additional structure for security and utilities.
7.78 miles Expedient Upper Arlington
7.84 miles Tower PlusInterested in this information?Contact us
Amazon is constructing its third data center campus in Hilliard at the intersection of Scioto Darby Road and the Interstate 270 overpass.
7.85 miles Park PlusInterested in this information?Contact us
Amazon is constructing its third data center campus in Hilliard at the intersection of Scioto Darby Road and the Interstate 270 overpass.
7.91 miles ParkInterested in this information?Contact us
Amazon is constructing its third data center campus in Hilliard at the intersection of Scioto Darby Road and the Interstate 270 overpass.
7.93 miles Park UltraInterested in this information?Contact us
In March 2021, Columbus City Council approved $54.3 million in tax incentives to develop a data center on the former Hartman Farm site.
7.93 miles SouthInterested in this information?Contact us
This data center is part of Google's Lockbourne Campus in Ohio.
8.02 miles ThreeInterested in this information?Contact us
Amazon is constructing its third data center campus in Hilliard at the intersection of Scioto Darby Road and the Interstate 270 overpass.
8.15 miles Plaza ProInterested in this information?Contact us
This data center is part of Google's Lockbourne Campus in Ohio.
8.30 miles Compass Groveport AEP II
American Electric Power invested approximately $125 million into the data center on Hamilton Road
8.31 miles TwoInterested in this information?Contact us
This data center is a part of Google's Lockbourne Campus in Ohio.
8.34 miles West RidgeInterested in this information?Contact us
This data center is a part of Google's Lockbourne Campus in Ohio.
8.52 miles eNET Columbus
9.28 miles Connect Data Centers: Hilliard, OH
US involvement from Oppidan's Hilliard data center spans 89,954 sqft. Oppidan lists Connect Data Centers as a subsidiary.
9.48 miles Carrier-Neutral Data CenterInterested in this information?Contact us
9.80 miles Point MaxInterested in this information?Contact us
9.85 miles Prime ValleyInterested in this information?Contact us
9.86 miles DataCanopy: Columbus
9.87 miles Campus PlusInterested in this information?Contact us
9.92 miles CampusInterested in this information?Contact us
9.96 miles Central CenterInterested in this information?Contact us
10.30 miles Cologix COL3
10.35 miles Cologix Columbus COL1, COL2
COL1 (32,000sqft) and COL2 (20,000sqft) represent 2 phases of buildout in the same building. Cologix entered the Columbus market in February of 2014 through an acquisition of DataCenter.BZ
10.48 miles Cologix Columbus COL4
Cologix is building COL4, a 256,000 square foot data center on 9 acres along Alta View and Worthington Woods boulevards in Ohio. This facility will offer 27 MW of capacity.
10.51 miles Karis: Galloway, Ohio
Karis Critical's proposed data center project on 127 acres in Prairie Township, Ohio, remains strictly in a "land-banked" planning phase, with no formal development or construction application submitted to local authorities.
11.13 miles WeConnect Westerville
11.17 miles StationInterested in this information?Contact us
Amazon's second data center campus in Hilliard, Ohio, is situated on a 104-acre site between Cosgray and Leppert roads.
11.22 miles Ridge TwoInterested in this information?Contact us
This data center is a part of amazon's Cosgray Road Campus in Hilliard, Ohio.
11.26 miles Cloud HubInterested in this information?Contact us
This data center is a part of amazon's Cosgray Road Campus in Hilliard, Ohio.
11.31 miles Station MaxInterested in this information?Contact us
This data center is a part of amazon's Cosgray Road Campus in Hilliard, Ohio.
11.53 miles DartPoints: Dublin, OH
The facility was previously operated by Metro Data Center LLC before being acquired by Dartpoints in October 2020.
11.77 miles Expedient Dublin (CMH2)
Offering 29,000 square foot of total floor space, Expedient’s Dublin data center is powered by redundant electric utility power feeds and 4 auto-cutover diesel generators
12.24 miles Ridge AlphaInterested in this information?Contact us
The Amazon.com subsidiary bought 234 acres at 9905 State Route 104 in Pickaway County, which is about 9 miles away from Rickenbacker International Airport.
13.02 miles Expedient: Lewis Center (CMH3)
Expedient data center Located at 281 E. Powell Road in Lewis Center township with The 102,000 sq ft (9,475 sqm) facility offers 3MW of initial power capacity that will be increased to 7.5 MW in the future.
13.10 miles Resilience CMH II
Overwatch Capital and Japanese energy leader Idemitsu have launched a strategic partnership to develop 1 GW of data center capacity across the United States.
13.13 miles Point MaxInterested in this information?Contact us
This facility is part of Google's New Albany campus in Ohio.
13.26 miles Station ThreeInterested in this information?Contact us
This facility is part of Google's New Albany campus in Ohio.
13.31 miles Discover Financial Services New Albany
13.33 miles Station ThreeInterested in this information?Contact us
This facility is part of Google's New Albany campus in Ohio.
13.46 miles Edged Energy: Columbus CMH01
Edged Energy data center spans 206,000 sq ft on a 15-acre parcel at 6385 New Albany Road East.
13.46 miles PlazaInterested in this information?Contact us
This facility is part of Google's New Albany campus in Ohio.
13.56 miles Compass New Albany
13.57 miles West ValleyInterested in this information?Contact us
This facility is part of Google's New Albany campus in Ohio.
13.59 miles TJX Corporate Techno
13.67 miles East PointInterested in this information?Contact us
This facility is part of Google's New Albany campus in Ohio.
13.72 miles Compugen New Albany
13.73 miles South CampusInterested in this information?Contact us
The campus is located on a 447-acre site on the west side of Beech Road, south of the state Route 161 interchange.
13.82 miles QTS: New Albany 2 DC2
QTS New Albany 2 is a two-building data center campus in New Albany, Ohio. New Albany 2 DC2 is located at 675 Beech Rd SW, Etna, OH.
13.89 miles Stack: NAL01B
STACK INFRASTRUCTURE is expanding it's NAL01 campus, located at Souder Road, New Albany, OH.
13.91 miles QTS: Babbitt Rd, New Albany
QTS Data Centers wants to build eight additional facilities spanning 3.2 million square feet on 240 acres on Babbitt and Miller roads. It will invest nearly $3 billion in those projects.
13.94 miles QTS: New Albany 2 DC1
QTS New Albany 2 is a two-building data center campus in New Albany, Ohio. New Albany 2 DC1 is located at 785 Beech Rd SW, Pataskala, OH.
13.98 miles STACK New Albany NAL01
STACK acquired the facility in October 2019 from Nationwide Insurance. Nationwide initially built the facility in 2008 for a cost of $96 million.
13.99 miles Centersquare: Columbus CMH1
DCI Technology Holdings owns the building and is CenturyLink's landlord.
13.99 miles Core PlazaInterested in this information?Contact us
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
14.01 miles Aligned: Pataskala
Aligned Data Centers, is targeting Pataskala for its second development in the Buckeye State.
14.04 miles Park OneInterested in this information?Contact us
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
14.08 miles QTS: New Albany 1 DC2
QTS New Albany 1 is a two-building data center campus in New Albany, Ohio. The second building, New Albany 1 DC2, of the campus is located at 1275 Beech Rd SW, New Albany, OH.
14.09 miles Hub OneInterested in this information?Contact us
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
14.13 miles Prime TowerInterested in this information?Contact us
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
14.14 miles QTS: New Albany 1 DC1
QTS New Albany 1 is a two-building data center campus in New Albany, Ohio. The first building of the campus is located at 1225 Beech Rd SW, New Albany, OH.
14.16 miles GammaInterested in this information?Contact us
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
14.27 miles Park AlphaInterested in this information?Contact us
Amazon is building a five-building data center campus in New Albany, Ohio. Amazon 6645 Crosby Ct facility would be the fourth building of the campus with an area of 152,945 sqft.
14.30 miles West TowerInterested in this information?Contact us
This data center is a part of Meta's New Albany Campus in Ohio.
14.31 miles Valley PrimeInterested in this information?Contact us
Amazon is building a five-building data center campus in New Albany, Ohio. Amazon 6655 Crosby Ct facility is the fourth building of the campus with an area of 152,945 sqft.
14.34 miles TwoInterested in this information?Contact us
This data center is a part of Meta's New Albany Campus in Ohio.
14.37 miles PointInterested in this information?Contact us
Amazon is building a five-building data center campus in New Albany, Ohio. Amazon 6665 Crosby Ct facility is the third building of the campus with an area of 152945 sqft.
14.41 miles Ridge BetaInterested in this information?Contact us
Amazon is building a five-building data center campus in New Albany, Ohio. Amazon 6675 Crosby Ct facility is the second building of the campus with an area of 152945 sqft.
14.47 miles Ridge PlusInterested in this information?Contact us
Amazon is building a five-building data center campus in New Albany, Ohio.
14.57 miles East HubInterested in this information?Contact us
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
14.59 miles Valley PrimeInterested in this information?Contact us
This data center is a part of Meta's New Albany Campus in Ohio.
14.60 miles West RidgeInterested in this information?Contact us
This data center is a part of Meta's New Albany Campus in Ohio.
14.63 miles BetaInterested in this information?Contact us
Meta operates a data center campus in New Albany, Ohio, located at 1 Community Circle. The New Albany site consists of five data centers, spanning a total of 2.5 million square feet.
14.67 miles BetaInterested in this information?Contact us
Microsoft acquired 289 acres of land in Pataskala for $30.7 million.
14.85 miles PrimeInterested in this information?Contact us
The Prometheus data center campus in New Albany, Ohio, serves as a primary hub for Meta's AI training infrastructure.
14.89 miles DBT Data: 2214 Harrison Rd
DBT Data acquired 44 acres of land in March 2022 with the intention of developing a data center project on the site.
14.94 miles Center AlphaInterested in this information?Contact us
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
15.11 miles NorthInterested in this information?Contact us
Amazon's $200 million data center campus is situated on 111 acres at the southwest corner of Warner Road and Industrial Parkway.
15.13 miles Plaza MaxInterested in this information?Contact us
Microsoft expanded its Ohio footprint in 2024, purchasing an additional 43 acres in Pataskala for $11.44 million.
15.20 miles Point AlphaInterested in this information?Contact us
Amazon's $200 million data center campus is situated on 111 acres at the southwest corner of Warner Road and Industrial Parkway.
15.21 miles PlusInterested in this information?Contact us
15.25 miles EastInterested in this information?Contact us
Amazon's $200 million data center campus is situated on 111 acres at the southwest corner of Warner Road and Industrial Parkway.
15.32 miles Ridge TwoInterested in this information?Contact us
Amazon's $200 million data center campus is situated on 111 acres at the southwest corner of Warner Road and Industrial Parkway.
15.43 miles HubInterested in this information?Contact us
15.48 miles Cologix: Columbus COL5
Cologix is constructing a 60,000-square-foot, AI-ready facility, COL5, in Columbus, Ohio.
15.49 miles Plaza PrimeInterested in this information?Contact us
15.50 miles Cologix: COL6
This planned facility is part of Cologix COL5 campus in Columbus.
15.56 miles Prime HubInterested in this information?Contact us
15.61 miles Metro RidgeInterested in this information?Contact us
15.62 miles EdgeConneX: Ashville, Ohio
The proposed EdgeConneX data center project in Pickaway County, Ohio, involves the development of 680 acres of farmland in the village of Ashville.
15.63 miles ParkInterested in this information?Contact us
Microsoft purchased 183 acres of land on Beech Road in New Albany in 2023.
15.69 miles WestInterested in this information?Contact us
15.78 miles Edge CenterInterested in this information?Contact us
This facility is part of Amazon's 3180 Beech Road Campus in New Albany.
15.85 miles Vantage: OH13
This facility is a part of Vantage's New Albany data center campus in Ohio.
15.86 miles Cloud PointInterested in this information?Contact us
This facility is part of Amazon's 3180 Beech Road Campus in New Albany.
15.89 miles Hub BetaInterested in this information?Contact us
This facility is part of Amazon's 3180 Beech Road Campus in New Albany.
15.90 miles Lincoln Rackhouse: Silicon Heartland Innovation Park
15.93 miles Vantage: OH12
This facility is a part of Vantage's New Albany data center campus in Ohio.
15.99 miles GlobalInterested in this information?Contact us
This facility is part of Amazon's 3180 Beech Road Campus in New Albany.
16.02 miles Vantage: New Albany (OH1)
Vantage has started work on its OH1 data center campus at 3475 Horizon Ct., which is inside the Silicon Heartland Innovation Park.
16.03 miles ProInterested in this information?Contact us
This facility is part of Amazon's 3180 Beech Road Campus in New Albany.
16.17 miles East TowerInterested in this information?Contact us
Google recently expanded its footprint in Ohio, acquiring nearly 85 acres of land in New Albany, outside Columbus, for $63 million.
16.32 miles NorthInterested in this information?Contact us
16.35 miles EdgeConneX: Ashville 2
Local officials in Ashville, Ohio, blocked the expansion of a proposed EdgeConneX data center in February 2026. Although the company owns an initial 200-acre plot, their request to annex an additional 490 acres was denied.
16.36 miles North ValleyInterested in this information?Contact us
16.39 miles Ridge PlusInterested in this information?Contact us
16.39 miles Edge StationInterested in this information?Contact us
Amazon's Industrial Parkway Campus is situated on 98 acres at 8619 Industrial Parkway in Union County’s Jerome Township.
16.43 miles ProInterested in this information?Contact us
Amazon's Industrial Parkway Campus is situated on 98 acres at 8619 Industrial Parkway in Union County’s Jerome Township.
16.46 miles EdgeConnex: Johnstown South 2
Phase II of EdgeConneX's Johnstown South Campus will see the construction of a new two-story 700,000 sq ft (65,030 sqm) building.
16.48 miles Hub MaxInterested in this information?Contact us
16.48 miles Edge RidgeInterested in this information?Contact us
16.48 miles Edge RidgeInterested in this information?Contact us
Amazon's Industrial Parkway Campus is situated on 98 acres at 8619 Industrial Parkway in Union County’s Jerome Township.
16.52 miles Hyperscale Data CenterInterested in this information?Contact us
This facility will be part of Amazon's new data center campus along Beech and Miller roads in New Albany.
16.53 miles Prime CenterInterested in this information?Contact us
Amazon's Industrial Parkway Campus is situated on 98 acres at 8619 Industrial Parkway in Union County’s Jerome Township.
16.55 miles EdgeConnex: Johnstown South Campus
EdgeConneX, a US data center operator, invested $137.2 million to acquire nearly 270 acres across multiple sites in Licking County.
16.60 miles Hyperscale Data CenterInterested in this information?Contact us
This facility will be part of Amazon's new data center campus along Beech and Miller roads in New Albany.
16.64 miles Hyperscale Data CenterInterested in this information?Contact us
Amazon is building five data centers and related buildings totaling 1.25 million square feet on 85 of the 439 acres the company bought along Beech and Miller roads in early 2023.
16.71 miles Hyperscale Data CenterInterested in this information?Contact us
This facility will be part of Amazon's new data center campus along Beech and Miller roads in New Albany.
16.74 miles Hyperscale Data CenterInterested in this information?Contact us
This facility will be part of Amazon's new data center campus along Beech and Miller roads in New Albany.
16.75 miles Karis Critical: New Albany, OH
Data center developer Karis Critical has purchased 115 acres of land in New Albany, Ohio.
16.77 miles QTS: Miller Road, New Albany
QTS Data Centers wants to build eight additional facilities spanning 3.2 million square feet on 240 acres on Babbitt and Miller roads. It will invest nearly $3 billion in those projects.
17.02 miles DBT Data: Jug & Mink Project
Washington DC-based DBT-Data plans to develop a data center at the New Albany International Business Park, close to Intel's upcoming chip fab site.
17.02 miles CyrusOne: New Albany COL-1
CyrusOne has broken ground on a $150 million data center development in New Albany, Ohio.
17.09 miles Metro RidgeInterested in this information?Contact us
Meta’s $42 million acquisition of the Clover Valley Road parcel through its subsidiary Sidecat LLC marks a strategic expansion of the Prometheus AI Supercluster in New Albany, Ohio.
17.32 miles EdgeConnex: Johnstown North Campus
EdgeConnex acquired a 170.29-acre parcel of land for roughly $62.2 million, or about $365,017 per acre.
18.66 miles Cologix: Johnstown COL8
18.78 miles Cologix: Johnstown COL7
Cologix has acquired approximately 154 acres of land in Johnstown, Ohio, to develop a new, AI-ready data center campus.
18.79 miles Cologix: Johnstown Expansion
18.97 miles Park PlusInterested in this information?Contact us
Construction of the first 450,000 square foot (41,800 sq m) building is expected to begin in January 2028 and be completed by December 2034.

Racksquared 325 E Spring St Data Center Photos See all

Outside of the Racksquared Facility
Source: Baxtel

Operating Company

Operated by:
2
Facilities
1
Markets
1MW
Megawatts

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?