Cogent: Columbus 3 Edge

Latest Podcast 6520 Proprietors Rd
Operational
Fully operational facility
Operated by:

Cogent: Columbus 3 Edge

Year Built: 2025
Ownership: Cogent Communications owns the building.
░░░░ Request Dataset MW
Operational Power

Cogent's Columbus 3 Edge data center is a small facility on Proprietors Road in Worthington, north of Columbus.

Map and Nearby Locations

6520 Proprietors Rd
Cogent Communications Sites
Nearby Facilities

Cogent: Columbus 3 Edge Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Cogent: Columbus 3 Edge

Distance Site About
0.70 miles AT&T: Worthington (WOTNOH88)
AT&T's Worthington central office on North High Street is a telephone exchange and tandem switching hub serving the northern Columbus suburbs.
1.19 miles Cologix Columbus COL1, COL2
COL1 (32,000sqft) and COL2 (20,000sqft) represent 2 phases of buildout in the same building. Cologix entered the Columbus market in February of 2014 through an acquisition of DataCenter.BZ
1.19 miles Cologix COL3
1.33 miles T-Mobile: Columbus MSC
T-Mobile runs a mobile switching center on Alta View Boulevard in north Columbus, Ohio.
1.38 miles Cologix Columbus COL4
COL4 is a three-hall colocation data center that Cologix completed in May 2024 on Alta View Boulevard in north Columbus, Ohio, next to its COL1-3 facilities.
1.39 miles Lambda: Columbus COL4
Lambda runs GPU clusters in Cologix's COL4 data center in north Columbus, Ohio.
3.51 miles WeConnect Westerville
3.58 miles eNET Columbus
3.92 miles Expedient: Lewis Center (CMH3)
Expedient's CMH3 is a Tier III data center in a former Nationwide facility at 281 East Powell Road in Lewis Center, north of Columbus, Ohio.
4.56 miles Racksquared 2560 Value Way
4.87 miles Centersquare: Columbus CMH1
Centersquare's CMH1 is a single-story colocation data center in Lewis Center, north of Columbus, Ohio, that Centersquare took over with Cyxtera in 2024.
4.94 miles Expedient Upper Arlington
6.37 miles Cologix: COL5
Cologix is constructing a 60,000-square-foot, AI-ready facility, COL5, in Columbus, Ohio.
6.39 miles Cologix: COL6
This planned facility is part of Cologix COL5 campus in Columbus.
6.85 miles Ohio DAS: State of Ohio Computer Center
The State of Ohio Computer Center is the state government's main data center, on the west edge of The Ohio State University campus in Columbus.
6.91 miles DartPoints: Dublin, OH
The facility was previously operated by Metro Data Center LLC before being acquired by Dartpoints in October 2020.
7.29 miles Connect Data Centers: Hilliard, OH
US involvement from Oppidan's Hilliard data center spans 89,954 sqft. Oppidan lists Connect Data Centers as a subsidiary.
7.32 miles Tower ProInterested in this information?Contact us
7.43 miles OneInterested in this information?Contact us
7.44 miles Expedient Dublin (CMH2)
Offering 29,000 square foot of total floor space, Expedient’s Dublin data center is powered by redundant electric utility power feeds and 4 auto-cutover diesel generators
7.46 miles ThreeInterested in this information?Contact us
7.46 miles Hub MaxInterested in this information?Contact us
7.46 miles Valley BetaInterested in this information?Contact us
7.47 miles LexisNexis: Hilliard
LexisNexis runs a hosted data center inside the former MCI office campus, now owned by Verizon, on Britton Parkway in Hilliard, west of Columbus, Ohio.
8.29 miles Valley MaxInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
8.35 miles Center MaxInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
8.36 miles UltraInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
8.42 miles Valley UltraInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
8.46 miles BetaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
8.61 miles Cogent: Columbus 2 (161 E Goodale)
Cogent operates a small data center at 161 East Goodale Street in Columbus, Ohio, in a former Sprint network building.
8.62 miles HubInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
8.62 miles MaxInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
8.78 miles R+L Carriers: Delaware, OH
R+L Carriers operates an enterprise data center on Greif Parkway in Delaware, Ohio, which a Roberts family company bought and updated in 2018 and 2019.
8.99 miles Citi: Midwest Data Center
Citi's Midwest Data Center is an enterprise data center Citigroup built at the Park at Greif in Liberty Township, Delaware County, north of Columbus, Ohio.
9.00 miles Verizon Wireless: Columbus MSC
Verizon Wireless runs a mobile switching center at 289 East Naghten Street in downtown Columbus, Ohio.
9.00 miles Lumen: 266 North 5th
9.02 miles Cogent: 240 North 5th
9.02 miles CityNet Columbus
9.04 miles WOW! 226 N 5th
WOW!'s Columbus datacenter was acquired in 2013 from Bluemile assets. The site offers 26,00sqft and can expand to 52,00 sqft.
9.05 miles Lumen: 226 North Fifth
9.11 miles Racksquared 325 E Spring St
9.23 miles AT&T: Columbus Downtown (CLMBOH11)
AT&T's Columbus Downtown central office at 111 North Fourth Street is the main telephone switching hub and access tandem for the Columbus area.
9.36 miles CENTRA: 180 East Broad (CMH01)
9.36 miles US Signal Columbus
DC power w/battery backup available
Multiple diverse power feeds from utility grids
9.62 miles Bresco Broadband: 423 E Town St
Bresco Broadband runs a data center in its downtown Columbus headquarters building at 423 East Town Street, Ohio.
9.63 miles Government Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.63 miles Centra: New Albany (CMH1)
CENTRA is building CMH1, a two-story data center on a 15.8-acre site on Central College Road in the New Albany International Business Park, Ohio.
9.65 miles Zayo: 101 E Town St
Zayo operates a colocation data center on the third floor of 101 East Town Street in downtown Columbus, Ohio, a facility founded as Datacenter101.
9.69 miles East CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.71 miles Core HubInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.72 miles Park PrimeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.74 miles Cloud RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.92 miles Edged Energy: Columbus CMH01
Edged Energy data center spans 206,000 sq ft on a 15-acre parcel at 6385 New Albany Road East.
10.01 miles Discover Financial Services New Albany
10.18 miles TJX Corporate Techno
10.27 miles AEP: New Albany
AEP (American Electric Power) operates this data center in the New Albany International Business Park, Ohio. Compass Datacenters built the single-story facility for AEP in 2015.
10.35 miles CampusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
10.36 miles Plaza AlphaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
10.37 miles TowerInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
10.37 miles Central StationInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
10.40 miles ProInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
10.47 miles EastInterested in this information?Contact us
10.48 miles Compugen New Albany
10.55 miles North CampusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
10.55 miles Stack: NAL01B
NAL01B is STACK's new building on its NAL01 campus on Souder Road, New Albany, Ohio.
10.59 miles Metro PointInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
10.61 miles CeraNet Columbus
10.63 miles ValleyInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
10.66 miles Valley TwoInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
10.71 miles Stack: NAL01A
STACK acquired the facility in October 2019 from Nationwide Insurance. Nationwide initially built the facility in 2008 for a cost of $96 million.
11.05 miles Kyndryl: Columbus
11.29 miles StationInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
11.37 miles PlazaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
11.44 miles Ridge PrimeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
11.51 miles Ridge AlphaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
11.64 miles CentralInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
12.41 miles QTS: Babbitt Rd, New Albany
QTS Data Centers wants to build eight additional facilities spanning 3.2 million square feet on 240 acres on Babbitt and Miller roads. It will invest nearly $3 billion in those projects.
12.53 miles Hub BetaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
12.56 miles Point GammaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
12.80 miles Prime RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
12.88 miles TwoInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
12.88 miles Core CampusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
12.90 miles Prime CampusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
12.90 miles Valley ProInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
12.94 miles West ValleyInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
12.96 miles Plaza MaxInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.06 miles Valley BetaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.07 miles Plaza AlphaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.08 miles EdgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.09 miles Plaza AlphaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.10 miles ParkInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.16 miles QTS: New Albany 1 DC1
QTS New Albany 1 is a two-building data center campus in New Albany, Ohio. The first building of the campus is located at 1225 Beech Rd SW, New Albany, OH.
13.16 miles QTS: New Albany 1 DC2
QTS New Albany 1 is a two-building data center campus in New Albany, Ohio. The second building, New Albany 1 DC2, of the campus is located at 1275 Beech Rd SW, New Albany, OH.
13.27 miles PointInterested in this information?Contact us
13.27 miles Prime PlazaInterested in this information?Contact us
13.28 miles Center AlphaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.28 miles Central CenterInterested in this information?Contact us
13.28 miles Tower GammaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.30 miles Park TwoInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.38 miles Prime RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.38 miles QTS: New Albany 2 DC1
New Albany 2 DC1 is the first of two buildings on the QTS New Albany 2 campus, at 785 Beech Rd SW, Pataskala (Etna Township), Ohio.
13.39 miles CloudInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.40 miles QTS: New Albany 2 DC2
QTS New Albany 2 is a two-building data center campus in New Albany, Ohio. New Albany 2 DC2 is located at 675 Beech Rd SW, Etna, OH.
13.47 miles Hyperscale Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.49 miles Karis Critical: New Albany, OH
Data center developer Karis Critical has purchased 115 acres of land in New Albany, Ohio.
13.49 miles Hyperscale Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.51 miles PlusInterested in this information?Contact us
13.51 miles Cloud RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.51 miles Vantage: OH13
This facility is a part of Vantage's New Albany data center campus in Ohio.
13.52 miles Core PointInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.52 miles Hyperscale Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.53 miles Vantage: OH12
This facility is a part of Vantage's New Albany data center campus in Ohio.
13.54 miles Vantage: OH11
Vantage has started work on its OH1 data center campus at 3475 Horizon Ct., which is inside the Silicon Heartland Innovation Park.
13.54 miles Lincoln Rackhouse: Silicon Heartland Innovation Park
13.54 miles South ValleyInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.55 miles Hyperscale Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.55 miles Plaza OneInterested in this information?Contact us
13.57 miles West StationInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.58 miles Plaza ThreeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.59 miles Central ValleyInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.62 miles PrimeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.62 miles SouthInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.63 miles Hyperscale Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.63 miles CentralInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.65 miles Hyperscale Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.67 miles AlphaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.71 miles PlazaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.73 miles Karis: Galloway, Ohio
Karis Critical's proposed data center project on 127 acres in Prairie Township, Ohio, remains strictly in a "land-banked" planning phase, with no formal development or construction application submitted to local authorities.
13.92 miles QTS: Miller Road, New Albany
QTS Data Centers wants to build eight additional facilities spanning 3.2 million square feet on 240 acres on Babbitt and Miller roads. It will invest nearly $3 billion in those projects.
14.04 miles Plaza ThreeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.09 miles Cloud ParkInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.10 miles DBT Data: 2214 Harrison Rd
DBT-Data bought 44 acres on Harrison Road SW in Jersey Township in March 2022 for a data center project. The land was sold in 2025 for a natural gas power plant.
14.11 miles Valley BetaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.12 miles Prime PointInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.16 miles EdgeConneX: Piper Farms
EdgeConneX bought about 136 acres on Johnstown-Utica Road and Green Chapel Road in Monroe Township, Licking County, Ohio, in November 2025 for future data center development.
14.32 miles Park ProInterested in this information?Contact us
14.32 miles Plaza MaxInterested in this information?Contact us
14.33 miles PlazaInterested in this information?Contact us
14.48 miles Metro PointInterested in this information?Contact us
14.58 miles BetaInterested in this information?Contact us
14.67 miles North CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.84 miles EdgeConnex: Johnstown South 1
EdgeConneX, a US data center operator, invested $137.2 million to acquire nearly 270 acres across multiple sites in Licking County.
14.96 miles EdgeConnex: Johnstown South 2
Phase II of EdgeConneX's Johnstown South Campus will see the construction of a new two-story 700,000 sq ft (65,030 sqm) building.
14.99 miles CyrusOne: New Albany COL-1
CyrusOne has broken ground on a $150 million data center development in New Albany, Ohio.
15.05 miles EdgeConnex: Johnstown North Campus
EdgeConnex acquired a 170.29-acre parcel of land for roughly $62.2 million, or about $365,017 per acre.
15.27 miles Cologix: Johnstown Expansion
15.38 miles Cologix: COL7
Cologix has acquired approximately 154 acres of land in Johnstown, Ohio, to develop a new, AI-ready data center campus.
15.53 miles PrimeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.54 miles Cologix: COL8
COL8 is a single-story, liquid-cooled data center under construction on Cologix's Johnstown campus in Licking County, Ohio.
15.55 miles Cloud HubInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.34 miles AEP: Groveport
American Electric Power's Groveport data center is a backup and disaster-recovery facility on South Hamilton Road, linked to AEP's primary data center in New Albany, Ohio.
16.39 miles Aligned: Pataskala
Aligned Data Centers, is targeting Pataskala for its second development in the Buckeye State.
16.62 miles Park UltraInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.96 miles Carrier-Neutral Data CenterInterested in this information?Contact us
17.03 miles West CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.03 miles Core PlazaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.24 miles Campus MaxInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.33 miles Ridge MaxInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.41 miles Hub AlphaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.43 miles ValleyInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.75 miles Edge PointInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.87 miles ValleyInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.95 miles DataCanopy: Columbus
18.98 miles Point MaxInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.55 miles Hyperscale Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us

Operating Company

Operated by:

Quick Facts:


  • Founded in 1999; publicly traded company (NASDAQ: CCOI).
  • Headquartered in Washington, DC.
  • Serves 190 markets in North America, Europe and Asia
  • Provides Internet access, Ethernet transport and colocation services.

Cogent Network


  • 2,125 On-Net buildings
    • 69% multi-tenant office buildings
    • 31% carrier neutral and Cogent data centers
  • 50 Cogent data centers with 550,000+ square feet
  • 610+ metro networks; 27,200+ metro fiber miles
  • 59,000+ intercity fiber route miles
  • Long-haul capacity up to 580 Gbps
  • Transatlantic capacity over 800 Gbps across multiple cables/routes Interconnected with 5,270+ different networks

Acquisition History

Although debuting at the height of the telecom industry, Cogent soon found vast market wealth eradicated and many other ISPs thrown into a state of turmoil. In a survival of the fittest competition, Cogent became the consolidator in a consolidating market. Over three brief years, Cogent completed 13 acquisitions of other flailing providers. Whether it was an entire company or just select assets, Cogent was able to acquire valuable network assets, customers, peering relationships and building access agreements for pennies on the dollar.

Among Cogent's 13 acquisitions to date include three of the original generation Internet Service Providers who were pioneers in the late 1980s and early 1990s. These companies—PSINet (originally Performance Systems International), NetRail and Aleron (originally AGIS/Net99)—were the earliest providers of commercial Internet service.

Other strategic acquisitions include assets from: Allied Riser, OnSite Access, Fiber City, Fiber Network Solutions, Applied Theory, LambdaNet France and Spain, Carrier1, Unlimited Fiber Optics, Global Access, Aleron, NTT/Verio.

0
Facilities
0
Markets
0MW
Megawatts

News See all

Read 45 Sprint switch facilities to be converted into colo data centers by Cogent
45 Sprint switch facilities to be converted into colo data centers by Cogent

45 Sprint switch facilities to be converted into colo data centers by Cogent

August 22, 2023 Cogent Communications

Cogent Communications intends to transform the former Sprint switching plant real estate footprint acquired from T-Mobile into a substantial colocation data center portfolio. T-Mobile announced in September 2022 that it had agreed to sell its Wireline business to Cogent for a symbolic $1, with...

Read more
Read T-Mobile Sells Data Center and Wireline Business to Cogent for $1
T-Mobile Sells Data Center and Wireline Business to Cogent for $1

T-Mobile Sells Data Center and Wireline Business to Cogent for $1

September 26, 2022 Cogent Communications

Cogent Communications Holdings has acquired T-Mobile’s wireline business for $1 billion. In addition, T-Mobile expects to have a pre-tax charge of $1 billion from selling the unit to Cogent. T-Mobile will also pay Cogent $350m in the first 1 year of closing the deal and another $350m over the...

Read more
Read Triple Double and Stonerock Capital Partners Acquire Two Properties in Miami Including a Cogent-occupied Facility
Baxtel

Triple Double and Stonerock Capital Partners Acquire Two Properties in Miami Including a Cogent-occupied Facility

May 09, 2022 Miami

Stonerock Capital Partners and Triple Double have completed the acquisition of two properties in downtown Miami. The properties are located at 200 SE 1st Street and 44 W. Flagler Street. They paid $56.7 million for both properties. The 200 SE 1st property is a 12-story, 13,200 square meter...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.