|
4.10 miles
|
Kyndryl: Columbus
|
|
|
5.12 miles
|
ParkInterested in this information?Contact us
|
Amazon is constructing its third data center campus in Hilliard at the intersection of Scioto Darby Road and the Interstate 270 overpass.
|
|
5.13 miles
|
Central TowerInterested in this information?Contact us
|
Amazon is constructing its third data center campus in Hilliard at the intersection of Scioto Darby Road and the Interstate 270 overpass.
|
|
5.40 miles
|
WestInterested in this information?Contact us
|
The complex will comprise seven buildings for data center operations and an additional structure for security and utilities.
|
|
5.41 miles
|
Prime StationInterested in this information?Contact us
|
Amazon is constructing its third data center campus in Hilliard at the intersection of Scioto Darby Road and the Interstate 270 overpass.
|
|
5.43 miles
|
Station UltraInterested in this information?Contact us
|
Amazon is constructing its third data center campus in Hilliard at the intersection of Scioto Darby Road and the Interstate 270 overpass.
|
|
5.48 miles
|
ValleyInterested in this information?Contact us
|
Amazon is constructing its third data center campus in Hilliard at the intersection of Scioto Darby Road and the Interstate 270 overpass.
|
|
6.05 miles
|
Tower OneInterested in this information?Contact us
|
Amazon's second data center campus in Hilliard, Ohio, is situated on a 104-acre site between Cosgray and Leppert roads.
|
|
6.13 miles
|
North HubInterested in this information?Contact us
|
This data center is a part of amazon's Cosgray Road Campus in Hilliard, Ohio.
|
|
6.19 miles
|
Center AlphaInterested in this information?Contact us
|
This data center is a part of amazon's Cosgray Road Campus in Hilliard, Ohio.
|
|
6.27 miles
|
Plaza TwoInterested in this information?Contact us
|
This data center is a part of amazon's Cosgray Road Campus in Hilliard, Ohio.
|
|
7.16 miles
|
Connect Data Centers: Hilliard, OH
|
US involvement from Oppidan's Hilliard data center spans 89,954 sqft. Oppidan lists Connect Data Centers as a subsidiary.
|
|
7.34 miles
|
South TowerInterested in this information?Contact us
|
|
|
7.39 miles
|
Campus GammaInterested in this information?Contact us
|
|
|
7.40 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
|
|
7.43 miles
|
PointInterested in this information?Contact us
|
|
|
7.51 miles
|
Point TwoInterested in this information?Contact us
|
|
|
7.55 miles
|
Global TowerInterested in this information?Contact us
|
|
|
8.88 miles
|
Expedient Upper Arlington
|
|
|
9.36 miles
|
Expedient Dublin (CMH2)
|
Offering 29,000 square foot of total floor space, Expedient’s Dublin data center is powered by redundant electric utility power feeds and 4 auto-cutover diesel generators
|
|
9.58 miles
|
ParkInterested in this information?Contact us
|
Amazon is building a five-building data center campus in New Albany, Ohio. Amazon 6645 Crosby Ct facility would be the fourth building of the campus with an area of 152,945 sqft.
|
|
9.64 miles
|
ParkInterested in this information?Contact us
|
Amazon is building a five-building data center campus in New Albany, Ohio. Amazon 6655 Crosby Ct facility is the fourth building of the campus with an area of 152,945 sqft.
|
|
9.72 miles
|
Ridge ThreeInterested in this information?Contact us
|
Amazon is building a five-building data center campus in New Albany, Ohio. Amazon 6665 Crosby Ct facility is the third building of the campus with an area of 152945 sqft.
|
|
9.77 miles
|
Ridge PlusInterested in this information?Contact us
|
Amazon is building a five-building data center campus in New Albany, Ohio. Amazon 6675 Crosby Ct facility is the second building of the campus with an area of 152945 sqft.
|
|
9.83 miles
|
Central RidgeInterested in this information?Contact us
|
Amazon is building a five-building data center campus in New Albany, Ohio.
|
|
9.85 miles
|
DartPoints: Dublin, OH
|
The facility was previously operated by Metro Data Center LLC before being acquired by Dartpoints in October 2020.
|
|
9.94 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
|
|
10.27 miles
|
Lumen: 580 North 4th
|
|
|
10.28 miles
|
Crown Castle 101 E Town
|
Crown Castle acquired Lightower in 2017
|
|
10.32 miles
|
CENTRA: 180 East Broad (CMH01)
|
|
|
10.32 miles
|
US Signal Columbus
|
DC power w/battery backup available
Multiple diverse power feeds from utility grids
|
|
10.34 miles
|
Lumen: 266 North 5th
|
|
|
10.36 miles
|
Cogent: 240 North 5th
|
|
|
10.36 miles
|
Lumen: 226 North Fifth
|
|
|
10.36 miles
|
WOW! 226 N 5th
|
WOW!'s Columbus datacenter was acquired in 2013 from Bluemile assets. The site offers 26,00sqft and can expand to 52,00 sqft.
|
|
10.39 miles
|
CityNet Columbus
|
|
|
10.51 miles
|
Racksquared 325 E Spring St
|
|
|
10.72 miles
|
East CampusInterested in this information?Contact us
|
Amazon's $200 million data center campus is situated on 111 acres at the southwest corner of Warner Road and Industrial Parkway.
|
|
10.80 miles
|
Metro ParkInterested in this information?Contact us
|
Amazon's $200 million data center campus is situated on 111 acres at the southwest corner of Warner Road and Industrial Parkway.
|
|
10.86 miles
|
Point TwoInterested in this information?Contact us
|
Amazon's $200 million data center campus is situated on 111 acres at the southwest corner of Warner Road and Industrial Parkway.
|
|
10.93 miles
|
ValleyInterested in this information?Contact us
|
Amazon's $200 million data center campus is situated on 111 acres at the southwest corner of Warner Road and Industrial Parkway.
|
|
10.98 miles
|
Cloud ParkInterested in this information?Contact us
|
|
|
11.07 miles
|
MicroLink: Mansfield Campus
|
MicroLink is planning to build a data center in Columbus, Ohio.
|
|
11.94 miles
|
BetaInterested in this information?Contact us
|
Amazon's Industrial Parkway Campus is situated on 98 acres at 8619 Industrial Parkway in Union County’s Jerome Township.
|
|
12.02 miles
|
CentralInterested in this information?Contact us
|
Amazon's Industrial Parkway Campus is situated on 98 acres at 8619 Industrial Parkway in Union County’s Jerome Township.
|
|
12.04 miles
|
ThreeInterested in this information?Contact us
|
Amazon's Industrial Parkway Campus is situated on 98 acres at 8619 Industrial Parkway in Union County’s Jerome Township.
|
|
12.11 miles
|
Metro ParkInterested in this information?Contact us
|
Amazon's Industrial Parkway Campus is situated on 98 acres at 8619 Industrial Parkway in Union County’s Jerome Township.
|
|
12.61 miles
|
TwoInterested in this information?Contact us
|
This data center is part of Google's Lockbourne Campus in Ohio.
|
|
12.76 miles
|
CentralInterested in this information?Contact us
|
This data center is part of Google's Lockbourne Campus in Ohio.
|
|
12.84 miles
|
PlazaInterested in this information?Contact us
|
In March 2021, Columbus City Council approved $54.3 million in tax incentives to develop a data center on the former Hartman Farm site.
|
|
12.90 miles
|
Cloud PointInterested in this information?Contact us
|
This data center is a part of Google's Lockbourne Campus in Ohio.
|
|
13.07 miles
|
East HubInterested in this information?Contact us
|
This data center is a part of Google's Lockbourne Campus in Ohio.
|
|
13.95 miles
|
Racksquared 2560 Value Way
|
|
|
14.57 miles
|
GlobalInterested in this information?Contact us
|
The Amazon.com subsidiary bought 234 acres at 9905 State Route 104 in Pickaway County, which is about 9 miles away from Rickenbacker International Airport.
|
|
14.65 miles
|
Cologix COL3
|
|
|
14.66 miles
|
Cologix Columbus COL1, COL2
|
COL1 (32,000sqft) and COL2 (20,000sqft) represent 2 phases of buildout in the same building.
Cologix entered the Columbus market in February of 2014 through an acquisition of DataCenter.BZ
|
|
14.83 miles
|
Cologix Columbus COL4
|
Cologix is building COL4, a 256,000 square foot data center on 9 acres along Alta View and Worthington Woods boulevards in Ohio. This facility will offer 27 MW of capacity.
|
|
15.31 miles
|
DataCanopy: Columbus
|
|
|
15.79 miles
|
eNET Columbus
|
|
|
16.30 miles
|
Expedient: Lewis Center (CMH3)
|
Expedient data center Located at 281 E. Powell Road in Lewis Center township with The 102,000 sq ft (9,475 sqm) facility offers 3MW of initial power capacity that will be increased to 7.5 MW in the future.
|
|
17.21 miles
|
Centersquare: Columbus CMH1
|
DCI Technology Holdings owns the building and is CenturyLink's landlord.
|
|
17.21 miles
|
WeConnect Westerville
|
|
|
17.25 miles
|
Compass Groveport AEP II
|
American Electric Power invested approximately $125 million into the data center on Hamilton Road
|
|
17.96 miles
|
CeraNet Columbus
|
|
|
18.45 miles
|
Cologix: Columbus COL5
|
Cologix is constructing a 60,000-square-foot, AI-ready facility, COL5, in Columbus, Ohio.
|
|
18.51 miles
|
Cologix: COL6
|
This planned facility is part of Cologix COL5 campus in Columbus.
|
|
19.18 miles
|
EdgeConneX: Ashville, Ohio
|
The proposed EdgeConneX data center project in Pickaway County, Ohio, involves the development of 680 acres of farmland in the village of Ashville.
|
|
19.19 miles
|
Point BetaInterested in this information?Contact us
|
Amazon is constructing a two building data center campus in Marysville, Ohio, potentially spanning 500,000 square feet.
|
|
19.25 miles
|
Point PrimeInterested in this information?Contact us
|
This facility is part of Amazon's Marysville Campus in Ohio.
|
|
19.69 miles
|
EdgeConneX: Ashville 2
|
Local officials in Ashville, Ohio, blocked the expansion of a proposed EdgeConneX data center in February 2026. Although the company owns an initial 200-acre plot, their request to annex an additional 490 acres was denied.
|