Lambda: Columbus COL4

Latest Podcast 7500 Alta View Blvd
Operational
Fully operational facility
Operated by:

Lambda: Columbus COL4

Year Built: 2025
Ownership: Lambda leases space in cologix columbus col4 (#3800); cologix owns the site. the building.
This site is leased from Cologix in the Cologix Columbus COL4 building
░░░ Request Dataset MW
Operational Power

Lambda runs GPU cloud clusters in Cologix's COL4 data center on Alta View Boulevard in north Columbus. The two companies announced the deployment in June 2025.

Site History

  • In June 2025, Lambda and Cologix announced Lambda's GPU clusters at COL4.

Map and Nearby Locations

7500 Alta View Blvd
Lambda Sites
Nearby Facilities

Lambda: Columbus COL4 Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Lambda: Columbus COL4

Distance Site About
0.01 miles Cologix Columbus COL4
COL4 is a three-hall colocation data center that Cologix completed in May 2024 on Alta View Boulevard in north Columbus, Ohio, next to its COL1-3 facilities.
0.12 miles T-Mobile: Columbus MSC
T-Mobile runs a mobile switching center on Alta View Boulevard in north Columbus, Ohio.
0.21 miles Cologix COL3
0.25 miles Cologix Columbus COL1, COL2
COL1 (32,000sqft) and COL2 (20,000sqft) represent 2 phases of buildout in the same building. Cologix entered the Columbus market in February of 2014 through an acquisition of DataCenter.BZ
1.39 miles Cogent: Columbus 3 Edge
Cogent operates a small edge data center at 6520 Proprietors Road in Worthington, north of Columbus, Ohio.
1.62 miles AT&T: Worthington (WOTNOH88)
AT&T's Worthington central office on North High Street is a telephone exchange and tandem switching hub serving the northern Columbus suburbs.
2.62 miles Expedient: Lewis Center (CMH3)
Expedient's CMH3 is a Tier III data center in a former Nationwide facility at 281 East Powell Road in Lewis Center, north of Columbus, Ohio.
2.87 miles WeConnect Westerville
3.54 miles Centersquare: Columbus CMH1
Centersquare's CMH1 is a single-story colocation data center in Lewis Center, north of Columbus, Ohio, that Centersquare took over with Cyxtera in 2024.
4.03 miles eNET Columbus
5.02 miles Cologix: COL5
Cologix is constructing a 60,000-square-foot, AI-ready facility, COL5, in Columbus, Ohio.
5.04 miles Cologix: COL6
This planned facility is part of Cologix COL5 campus in Columbus.
5.62 miles Racksquared 2560 Value Way
5.97 miles Expedient Upper Arlington
7.31 miles DartPoints: Dublin, OH
The facility was previously operated by Metro Data Center LLC before being acquired by Dartpoints in October 2020.
7.50 miles R+L Carriers: Delaware, OH
R+L Carriers operates an enterprise data center on Greif Parkway in Delaware, Ohio, which a Roberts family company bought and updated in 2018 and 2019.
7.74 miles Citi: Midwest Data Center
Citi's Midwest Data Center is an enterprise data center Citigroup built at the Park at Greif in Liberty Township, Delaware County, north of Columbus, Ohio.
7.85 miles Expedient Dublin (CMH2)
Offering 29,000 square foot of total floor space, Expedient’s Dublin data center is powered by redundant electric utility power feeds and 4 auto-cutover diesel generators
8.09 miles Valley AlphaInterested in this information?Contact us
8.15 miles Connect Data Centers: Hilliard, OH
US involvement from Oppidan's Hilliard data center spans 89,954 sqft. Oppidan lists Connect Data Centers as a subsidiary.
8.19 miles Station OneInterested in this information?Contact us
8.21 miles Ohio DAS: State of Ohio Computer Center
The State of Ohio Computer Center is the state government's main data center, on the west edge of The Ohio State University campus in Columbus.
8.23 miles Metro RidgeInterested in this information?Contact us
8.24 miles Park TwoInterested in this information?Contact us
8.25 miles Edge TowerInterested in this information?Contact us
8.29 miles LexisNexis: Hilliard
LexisNexis runs a hosted data center inside the former MCI office campus, now owned by Verizon, on Britton Parkway in Hilliard, west of Columbus, Ohio.
9.37 miles NorthInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.43 miles SouthInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.46 miles Metro CampusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.50 miles UltraInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.51 miles Centra: New Albany (CMH1)
CENTRA is building CMH1, a two-story data center on a 15.8-acre site on Central College Road in the New Albany International Business Park, Ohio.
9.54 miles Core CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.72 miles North RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.73 miles West PointInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.73 miles Edged Energy: Columbus CMH01
Edged Energy data center spans 206,000 sq ft on a 15-acre parcel at 6385 New Albany Road East.
9.85 miles Discover Financial Services New Albany
9.98 miles Cogent: Columbus 2 (161 E Goodale)
Cogent operates a small data center at 161 East Goodale Street in Columbus, Ohio, in a former Sprint network building.
10.02 miles TJX Corporate Techno
10.11 miles AEP: New Albany
AEP (American Electric Power) operates this data center in the New Albany International Business Park, Ohio. Compass Datacenters built the single-story facility for AEP in 2015.
10.31 miles Compugen New Albany
10.36 miles Stack: NAL01B
NAL01B is STACK's new building on its NAL01 campus on Souder Road, New Albany, Ohio.
10.36 miles Verizon Wireless: Columbus MSC
Verizon Wireless runs a mobile switching center at 289 East Naghten Street in downtown Columbus, Ohio.
10.37 miles Lumen: 266 North 5th
10.38 miles Cogent: 240 North 5th
10.38 miles CityNet Columbus
10.41 miles WOW! 226 N 5th
WOW!'s Columbus datacenter was acquired in 2013 from Bluemile assets. The site offers 26,00sqft and can expand to 52,00 sqft.
10.41 miles Core PointInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
10.42 miles Lumen: 226 North Fifth
10.44 miles Global CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
10.46 miles Prime CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
10.47 miles Racksquared 325 E Spring St
10.49 miles CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
10.52 miles Stack: NAL01A
STACK acquired the facility in October 2019 from Nationwide Insurance. Nationwide initially built the facility in 2008 for a cost of $96 million.
10.56 miles Core CampusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
10.57 miles ParkInterested in this information?Contact us
10.60 miles AT&T: Columbus Downtown (CLMBOH11)
AT&T's Columbus Downtown central office at 111 North Fourth Street is the main telephone switching hub and access tandem for the Columbus area.
10.63 miles PrimeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
10.63 miles Core HubInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
10.63 miles Tower TwoInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
10.63 miles TowerInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
10.65 miles Hub AlphaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
10.68 miles GlobalInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
10.71 miles Hub TwoInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
10.72 miles CENTRA: 180 East Broad (CMH01)
10.72 miles US Signal Columbus
DC power w/battery backup available
Multiple diverse power feeds from utility grids
10.72 miles Government Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
10.74 miles ThreeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
10.77 miles Core ValleyInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
10.97 miles Bresco Broadband: 423 E Town St
Bresco Broadband runs a data center in its downtown Columbus headquarters building at 423 East Town Street, Ohio.
11.02 miles Zayo: 101 E Town St
Zayo operates a colocation data center on the third floor of 101 East Town Street in downtown Columbus, Ohio, a facility founded as Datacenter101.
11.27 miles AlphaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
11.34 miles Tower BetaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
11.43 miles CeraNet Columbus
11.43 miles Metro ValleyInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
11.50 miles Central CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
12.31 miles Kyndryl: Columbus
12.47 miles QTS: Babbitt Rd, New Albany
QTS Data Centers wants to build eight additional facilities spanning 3.2 million square feet on 240 acres on Babbitt and Miller roads. It will invest nearly $3 billion in those projects.
12.64 miles Point BetaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
12.70 miles BetaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
12.75 miles Center BetaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
12.77 miles East RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
12.82 miles Ridge GammaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
12.83 miles Global ParkInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
12.83 miles North HubInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
12.83 miles Center TwoInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
12.83 miles Core ParkInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.00 miles Central ParkInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.03 miles Prime StationInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.05 miles Ridge OneInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.05 miles Prime CampusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.11 miles EastInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.11 miles Valley ThreeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.12 miles MaxInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.15 miles Park OneInterested in this information?Contact us
13.16 miles Global RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.17 miles NorthInterested in this information?Contact us
13.17 miles SouthInterested in this information?Contact us
13.19 miles Karis Critical: New Albany, OH
Data center developer Karis Critical has purchased 115 acres of land in New Albany, Ohio.
13.20 miles Hyperscale Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.20 miles Prime TowerInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.21 miles Central RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.22 miles Hyperscale Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.27 miles QTS: New Albany 1 DC1
QTS New Albany 1 is a two-building data center campus in New Albany, Ohio. The first building of the campus is located at 1225 Beech Rd SW, New Albany, OH.
13.27 miles Hyperscale Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.28 miles QTS: New Albany 1 DC2
QTS New Albany 1 is a two-building data center campus in New Albany, Ohio. The second building, New Albany 1 DC2, of the campus is located at 1275 Beech Rd SW, New Albany, OH.
13.28 miles Hyperscale Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.36 miles Hyperscale Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.37 miles Vantage: OH11
Vantage has started work on its OH1 data center campus at 3475 Horizon Ct., which is inside the Silicon Heartland Innovation Park.
13.37 miles Vantage: OH13
This facility is a part of Vantage's New Albany data center campus in Ohio.
13.37 miles Hyperscale Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.38 miles Vantage: OH12
This facility is a part of Vantage's New Albany data center campus in Ohio.
13.40 miles Lincoln Rackhouse: Silicon Heartland Innovation Park
13.41 miles PointInterested in this information?Contact us
13.44 miles PrimeInterested in this information?Contact us
13.55 miles QTS: New Albany 2 DC1
New Albany 2 DC1 is the first of two buildings on the QTS New Albany 2 campus, at 785 Beech Rd SW, Pataskala (Etna Township), Ohio.
13.58 miles ParkInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.59 miles QTS: New Albany 2 DC2
QTS New Albany 2 is a two-building data center campus in New Albany, Ohio. New Albany 2 DC2 is located at 675 Beech Rd SW, Etna, OH.
13.63 miles Center UltraInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.67 miles QTS: Miller Road, New Albany
QTS Data Centers wants to build eight additional facilities spanning 3.2 million square feet on 240 acres on Babbitt and Miller roads. It will invest nearly $3 billion in those projects.
13.69 miles Point MaxInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.71 miles Point MaxInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.71 miles WestInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.73 miles GammaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.74 miles AlphaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.75 miles Ridge MaxInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.79 miles Prime ValleyInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.82 miles Hub TwoInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.83 miles EdgeConneX: Piper Farms
EdgeConneX bought about 136 acres on Johnstown-Utica Road and Green Chapel Road in Monroe Township, Licking County, Ohio, in November 2025 for future data center development.
13.84 miles CampusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.89 miles Hub PlusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.00 miles Center UltraInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.13 miles Cloud CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.21 miles Valley ProInterested in this information?Contact us
14.21 miles NorthInterested in this information?Contact us
14.22 miles Park OneInterested in this information?Contact us
14.23 miles Point UltraInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.24 miles DBT Data: 2214 Harrison Rd
DBT-Data bought 44 acres on Harrison Road SW in Jersey Township in March 2022 for a data center project. The land was sold in 2025 for a natural gas power plant.
14.36 miles Core PointInterested in this information?Contact us
14.40 miles Edge CampusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.48 miles Cloud PlazaInterested in this information?Contact us
14.77 miles EdgeConnex: Johnstown South 1
EdgeConneX, a US data center operator, invested $137.2 million to acquire nearly 270 acres across multiple sites in Licking County.
14.85 miles Karis: Galloway, Ohio
Karis Critical's proposed data center project on 127 acres in Prairie Township, Ohio, remains strictly in a "land-banked" planning phase, with no formal development or construction application submitted to local authorities.
14.87 miles EdgeConnex: Johnstown North Campus
EdgeConnex acquired a 170.29-acre parcel of land for roughly $62.2 million, or about $365,017 per acre.
14.87 miles EdgeConnex: Johnstown South 2
Phase II of EdgeConneX's Johnstown South Campus will see the construction of a new two-story 700,000 sq ft (65,030 sqm) building.
14.89 miles CyrusOne: New Albany COL-1
CyrusOne has broken ground on a $150 million data center development in New Albany, Ohio.
14.93 miles Cologix: Johnstown Expansion
15.02 miles Cologix: COL7
Cologix has acquired approximately 154 acres of land in Johnstown, Ohio, to develop a new, AI-ready data center campus.
15.17 miles Cologix: COL8
COL8 is a single-story, liquid-cooled data center under construction on Cologix's Johnstown campus in Licking County, Ohio.
15.26 miles Edge ParkInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.45 miles North TowerInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.88 miles Aligned: Pataskala
Aligned Data Centers, is targeting Pataskala for its second development in the Buckeye State.
17.54 miles AEP: Groveport
American Electric Power's Groveport data center is a backup and disaster-recovery facility on South Hamilton Road, linked to AEP's primary data center in New Albany, Ohio.
17.85 miles Station OneInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.99 miles South CampusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.26 miles Ridge AlphaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.31 miles Carrier-Neutral Data CenterInterested in this information?Contact us
18.40 miles Metro RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.40 miles Tower PlusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.49 miles Valley GammaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.60 miles East ValleyInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.61 miles CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.77 miles Center MaxInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.80 miles MetroInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.23 miles Hyperscale Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us

Operating Company

Operated by:
0
Facilities
0
Markets

News See all

Read Lambda To Anchor $33.1B Project Red Clay Campus In Alabama
[Lambda](https://baxtel.com/data-centers/lambda) will anchor Project Red Clay, a 1GW data center campus in Lowndes County, Alabama. The AI cloud provider [said on November 4](https://lambda.ai/blog...

Lambda To Anchor $33.1B Project Red Clay Campus In Alabama

November 05, 2026 Lambda

Lambda will anchor Project Red Clay, a 1GW data center campus in Lowndes County, Alabama. The AI cloud provider said on November 4 that it will serve as the end user for the site, which Cloverleaf Infrastructure readied for development, and estimates the project represents a $33.1 billion...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.