Centersquare: Columbus CMH1

Latest Podcast 8180 Green Meadows Drive
Operational
Fully operational facility
Operated by:

Centersquare: Columbus CMH1

Short Code: CMH1
Ownership: Csquare does not own the building.
░░░░░░ Login to view SqFt
Total Building Size
░░░ Request Dataset MW
Total Power
░░░░░░ Login to view SqFt
Gross Colocation Size

This facility was previously operated by Cyxtera. Centersquare completed the successful acquisition of Cyxtera and Evoque Data Center Solutions in early 2024.

Cyxtera's CHM1 site in Columbus was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink. The transaction which closed in May 2017 created Cyxtera Technologies.

The site's short code was formerly "Cyxtera CL1"

DCI Technology Holdings owns the building and is CenturyLink's landlord.

Quick Facts:


  • 1 story building
  • Raised Floor: 24"
  • Utility Provider: American Electric

Network Providers:


CenturyLink
AT&T - MW (OH)
Level 3 Communications
TW Telecom
XO Communications

Map and Nearby Locations

8180 Green Meadows Drive
Csquare Sites
Nearby Facilities

Sites within 15 miles of Centersquare: Columbus CMH1

Distance Site About
1.00 miles Expedient: Lewis Center (CMH3)
Expedient data center Located at 281 E. Powell Road in Lewis Center township with The 102,000 sq ft (9,475 sqm) facility offers 3MW of initial power capacity that will be increased to 7.5 MW in the future.
1.49 miles Cologix: Columbus COL5
Cologix is constructing a 60,000-square-foot, AI-ready facility, COL5, in Columbus, Ohio.
1.52 miles Cologix: COL6
This planned facility is part of Cologix COL5 campus in Columbus.
3.53 miles Cologix Columbus COL4
Cologix is building COL4, a 256,000 square foot data center on 9 acres along Alta View and Worthington Woods boulevards in Ohio. This facility will offer 27 MW of capacity.
3.64 miles Cologix Columbus COL1, COL2
COL1 (32,000sqft) and COL2 (20,000sqft) represent 2 phases of buildout in the same building. Cologix entered the Columbus market in February of 2014 through an acquisition of DataCenter.BZ
3.70 miles Cologix COL3
4.71 miles WeConnect Westerville
7.05 miles eNET Columbus
8.07 miles DartPoints: Dublin, OH
The facility was previously operated by Metro Data Center LLC before being acquired by Dartpoints in October 2020.
8.50 miles Expedient Upper Arlington
8.81 miles Expedient Dublin (CMH2)
Offering 29,000 square foot of total floor space, Expedient’s Dublin data center is powered by redundant electric utility power feeds and 4 auto-cutover diesel generators
9.07 miles Racksquared 2560 Value Way
9.25 miles WestInterested in this information?Contact us
Construction of the first 450,000 square foot (41,800 sq m) building is expected to begin in January 2028 and be completed by December 2034.
9.85 miles Central TowerInterested in this information?Contact us
9.92 miles Metro CenterInterested in this information?Contact us
9.98 miles Central ValleyInterested in this information?Contact us
10.01 miles UltraInterested in this information?Contact us
10.04 miles Edge ValleyInterested in this information?Contact us
10.12 miles Connect Data Centers: Hilliard, OH
US involvement from Oppidan's Hilliard data center spans 89,954 sqft. Oppidan lists Connect Data Centers as a subsidiary.
10.51 miles Park GammaInterested in this information?Contact us
10.70 miles Core PlazaInterested in this information?Contact us
Amazon's $200 million data center campus is situated on 111 acres at the southwest corner of Warner Road and Industrial Parkway.
10.71 miles East CampusInterested in this information?Contact us
Amazon's $200 million data center campus is situated on 111 acres at the southwest corner of Warner Road and Industrial Parkway.
10.72 miles Tower GammaInterested in this information?Contact us
Amazon's $200 million data center campus is situated on 111 acres at the southwest corner of Warner Road and Industrial Parkway.
10.72 miles Station PlusInterested in this information?Contact us
Amazon's $200 million data center campus is situated on 111 acres at the southwest corner of Warner Road and Industrial Parkway.
10.85 miles BetaInterested in this information?Contact us
Amazon's Industrial Parkway Campus is situated on 98 acres at 8619 Industrial Parkway in Union County’s Jerome Township.
10.90 miles Ridge BetaInterested in this information?Contact us
Amazon's Industrial Parkway Campus is situated on 98 acres at 8619 Industrial Parkway in Union County’s Jerome Township.
10.96 miles TwoInterested in this information?Contact us
Amazon is building a five-building data center campus in New Albany, Ohio.
10.96 miles PrimeInterested in this information?Contact us
Amazon is building a five-building data center campus in New Albany, Ohio. Amazon 6675 Crosby Ct facility is the second building of the campus with an area of 152945 sqft.
10.98 miles West CampusInterested in this information?Contact us
Amazon is building a five-building data center campus in New Albany, Ohio. Amazon 6665 Crosby Ct facility is the third building of the campus with an area of 152945 sqft.
11.01 miles PointInterested in this information?Contact us
Amazon is building a five-building data center campus in New Albany, Ohio. Amazon 6655 Crosby Ct facility is the fourth building of the campus with an area of 152,945 sqft.
11.03 miles Campus PlusInterested in this information?Contact us
Amazon is building a five-building data center campus in New Albany, Ohio. Amazon 6645 Crosby Ct facility would be the fourth building of the campus with an area of 152,945 sqft.
11.05 miles Core ValleyInterested in this information?Contact us
Amazon's Industrial Parkway Campus is situated on 98 acres at 8619 Industrial Parkway in Union County’s Jerome Township.
11.09 miles Central ValleyInterested in this information?Contact us
Amazon's Industrial Parkway Campus is situated on 98 acres at 8619 Industrial Parkway in Union County’s Jerome Township.
11.21 miles Edged Energy: Columbus CMH01
Edged Energy data center spans 206,000 sq ft on a 15-acre parcel at 6385 New Albany Road East.
11.30 miles Discover Financial Services New Albany
11.52 miles TJX Corporate Techno
11.61 miles Compass New Albany
11.69 miles Compugen New Albany
11.75 miles Stack: NAL01B
STACK INFRASTRUCTURE is expanding it's NAL01 campus, located at Souder Road, New Albany, OH.
11.80 miles Hub AlphaInterested in this information?Contact us
Amazon is constructing its third data center campus in Hilliard at the intersection of Scioto Darby Road and the Interstate 270 overpass.
11.84 miles Central PlazaInterested in this information?Contact us
Amazon is constructing its third data center campus in Hilliard at the intersection of Scioto Darby Road and the Interstate 270 overpass.
11.84 miles NorthInterested in this information?Contact us
Amazon is constructing its third data center campus in Hilliard at the intersection of Scioto Darby Road and the Interstate 270 overpass.
11.90 miles PlazaInterested in this information?Contact us
The complex will comprise seven buildings for data center operations and an additional structure for security and utilities.
11.91 miles STACK New Albany NAL01
STACK acquired the facility in October 2019 from Nationwide Insurance. Nationwide initially built the facility in 2008 for a cost of $96 million.
11.91 miles Edge HubInterested in this information?Contact us
This data center is a part of amazon's Cosgray Road Campus in Hilliard, Ohio.
11.96 miles MaxInterested in this information?Contact us
This data center is a part of amazon's Cosgray Road Campus in Hilliard, Ohio.
12.00 miles EdgeInterested in this information?Contact us
This data center is a part of amazon's Cosgray Road Campus in Hilliard, Ohio.
12.05 miles Hub PrimeInterested in this information?Contact us
Amazon's second data center campus in Hilliard, Ohio, is situated on a 104-acre site between Cosgray and Leppert roads.
12.16 miles Station PrimeInterested in this information?Contact us
Amazon is constructing its third data center campus in Hilliard at the intersection of Scioto Darby Road and the Interstate 270 overpass.
12.20 miles GammaInterested in this information?Contact us
Amazon is constructing its third data center campus in Hilliard at the intersection of Scioto Darby Road and the Interstate 270 overpass.
13.42 miles Lumen: 580 North 4th
13.87 miles Lumen: 266 North 5th
13.89 miles Cogent: 240 North 5th
13.89 miles CityNet Columbus
13.92 miles Lumen: 226 North Fifth
13.92 miles WOW! 226 N 5th
WOW!'s Columbus datacenter was acquired in 2013 from Bluemile assets. The site offers 26,00sqft and can expand to 52,00 sqft.
13.99 miles Racksquared 325 E Spring St
14.05 miles Metro StationInterested in this information?Contact us
Microsoft purchased 183 acres of land on Beech Road in New Albany in 2023.
14.16 miles Karis Critical: New Albany, OH
Data center developer Karis Critical has purchased 115 acres of land in New Albany, Ohio.
14.23 miles CENTRA: 180 East Broad (CMH01)
14.23 miles US Signal Columbus
DC power w/battery backup available
Multiple diverse power feeds from utility grids
14.25 miles Hyperscale Data CenterInterested in this information?Contact us
This facility will be part of Amazon's new data center campus along Beech and Miller roads in New Albany.
14.26 miles Carrier-Neutral Data CenterInterested in this information?Contact us
14.26 miles Hyperscale Data CenterInterested in this information?Contact us
This facility will be part of Amazon's new data center campus along Beech and Miller roads in New Albany.
14.27 miles QTS: Babbitt Rd, New Albany
QTS Data Centers wants to build eight additional facilities spanning 3.2 million square feet on 240 acres on Babbitt and Miller roads. It will invest nearly $3 billion in those projects.
14.35 miles Central ValleyInterested in this information?Contact us
This facility is part of Amazon's 3180 Beech Road Campus in New Albany.
14.36 miles Hyperscale Data CenterInterested in this information?Contact us
This facility will be part of Amazon's new data center campus along Beech and Miller roads in New Albany.
14.40 miles Cloud RidgeInterested in this information?Contact us
This facility is part of Amazon's 3180 Beech Road Campus in New Albany.
14.41 miles Hyperscale Data CenterInterested in this information?Contact us
This facility will be part of Amazon's new data center campus along Beech and Miller roads in New Albany.
14.42 miles Hyperscale Data CenterInterested in this information?Contact us
Amazon is building five data centers and related buildings totaling 1.25 million square feet on 85 of the 439 acres the company bought along Beech and Miller roads in early 2023.
14.43 miles Tower ProInterested in this information?Contact us
This facility is part of Amazon's 3180 Beech Road Campus in New Albany.
14.45 miles Tower PlusInterested in this information?Contact us
This facility is part of Amazon's 3180 Beech Road Campus in New Albany.
14.51 miles Metro ValleyInterested in this information?Contact us
This facility is part of Amazon's 3180 Beech Road Campus in New Albany.
14.52 miles Crown Castle 101 E Town
Crown Castle acquired Lightower in 2017
14.55 miles Valley GammaInterested in this information?Contact us
14.55 miles CeraNet Columbus
14.60 miles Global ParkInterested in this information?Contact us
14.62 miles Central TowerInterested in this information?Contact us
14.66 miles Vantage: New Albany (OH1)
Vantage has started work on its OH1 data center campus at 3475 Horizon Ct., which is inside the Silicon Heartland Innovation Park.
14.70 miles PrimeInterested in this information?Contact us
This facility is part of Google's New Albany campus in Ohio.
14.70 miles Vantage: OH12
This facility is a part of Vantage's New Albany data center campus in Ohio.
14.73 miles Vantage: OH13
This facility is a part of Vantage's New Albany data center campus in Ohio.
14.74 miles Lincoln Rackhouse: Silicon Heartland Innovation Park
14.77 miles QTS: Miller Road, New Albany
QTS Data Centers wants to build eight additional facilities spanning 3.2 million square feet on 240 acres on Babbitt and Miller roads. It will invest nearly $3 billion in those projects.
14.78 miles CampusInterested in this information?Contact us
This facility is part of Google's New Albany campus in Ohio.
14.85 miles PlusInterested in this information?Contact us
14.87 miles ProInterested in this information?Contact us
14.99 miles West CampusInterested in this information?Contact us
The campus is located on a 447-acre site on the west side of Beech Road, south of the state Route 161 interchange.
15.04 miles Center OneInterested in this information?Contact us
This facility is part of Google's New Albany campus in Ohio.
15.06 miles Core StationInterested in this information?Contact us
This facility is part of Google's New Albany campus in Ohio.
15.08 miles Station ProInterested in this information?Contact us
This facility is part of Google's New Albany campus in Ohio.
15.15 miles QTS: New Albany 1 DC1
QTS New Albany 1 is a two-building data center campus in New Albany, Ohio. The first building of the campus is located at 1225 Beech Rd SW, New Albany, OH.
15.18 miles QTS: New Albany 1 DC2
QTS New Albany 1 is a two-building data center campus in New Albany, Ohio. The second building, New Albany 1 DC2, of the campus is located at 1275 Beech Rd SW, New Albany, OH.
15.22 miles Cloud PointInterested in this information?Contact us
This facility is part of Google's New Albany campus in Ohio.
15.38 miles Point UltraInterested in this information?Contact us
Meta operates a data center campus in New Albany, Ohio, located at 1 Community Circle. The New Albany site consists of five data centers, spanning a total of 2.5 million square feet.
15.39 miles MicroLink: Mansfield Campus
MicroLink is planning to build a data center in Columbus, Ohio.
15.40 miles Edge CenterInterested in this information?Contact us
Google recently expanded its footprint in Ohio, acquiring nearly 85 acres of land in New Albany, outside Columbus, for $63 million.
15.44 miles Park BetaInterested in this information?Contact us
This data center is a part of Meta's New Albany Campus in Ohio.
15.51 miles Kyndryl: Columbus
15.52 miles Plaza GammaInterested in this information?Contact us
Meta’s $42 million acquisition of the Clover Valley Road parcel through its subsidiary Sidecat LLC marks a strategic expansion of the Prometheus AI Supercluster in New Albany, Ohio.
15.55 miles StationInterested in this information?Contact us
This data center is a part of Meta's New Albany Campus in Ohio.
15.55 miles QTS: New Albany 2 DC1
QTS New Albany 2 is a two-building data center campus in New Albany, Ohio. New Albany 2 DC1 is located at 785 Beech Rd SW, Pataskala, OH.
15.57 miles ParkInterested in this information?Contact us
15.57 miles Cologix: Johnstown COL8
15.59 miles Valley PrimeInterested in this information?Contact us
15.61 miles OneInterested in this information?Contact us
15.63 miles Tower PlusInterested in this information?Contact us
This data center is a part of Meta's New Albany Campus in Ohio.
15.63 miles QTS: New Albany 2 DC2
QTS New Albany 2 is a two-building data center campus in New Albany, Ohio. New Albany 2 DC2 is located at 675 Beech Rd SW, Etna, OH.
15.63 miles EdgeInterested in this information?Contact us
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
15.65 miles Metro RidgeInterested in this information?Contact us
This data center is a part of Meta's New Albany Campus in Ohio.
15.70 miles TowerInterested in this information?Contact us
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
15.74 miles North StationInterested in this information?Contact us
15.75 miles TowerInterested in this information?Contact us
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
15.78 miles Cologix: Johnstown COL7
Cologix has acquired approximately 154 acres of land in Johnstown, Ohio, to develop a new, AI-ready data center campus.
15.79 miles ThreeInterested in this information?Contact us
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
15.83 miles Cologix: Johnstown Expansion
15.84 miles East PlazaInterested in this information?Contact us
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
15.88 miles Station BetaInterested in this information?Contact us
15.89 miles Station PlusInterested in this information?Contact us
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
15.94 miles OneInterested in this information?Contact us
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
16.08 miles EdgeConnex: Johnstown North Campus
EdgeConnex acquired a 170.29-acre parcel of land for roughly $62.2 million, or about $365,017 per acre.
16.10 miles EdgeConnex: Johnstown South 2
Phase II of EdgeConneX's Johnstown South Campus will see the construction of a new two-story 700,000 sq ft (65,030 sqm) building.
16.10 miles Center PrimeInterested in this information?Contact us
The Prometheus data center campus in New Albany, Ohio, serves as a primary hub for Meta's AI training infrastructure.
16.21 miles EdgeConnex: Johnstown South Campus
EdgeConneX, a US data center operator, invested $137.2 million to acquire nearly 270 acres across multiple sites in Licking County.
16.28 miles DBT Data: Jug & Mink Project
Washington DC-based DBT-Data plans to develop a data center at the New Albany International Business Park, close to Intel's upcoming chip fab site.
16.28 miles CyrusOne: New Albany COL-1
CyrusOne has broken ground on a $150 million data center development in New Albany, Ohio.
16.45 miles DBT Data: 2214 Harrison Rd
DBT Data acquired 44 acres of land in March 2022 with the intention of developing a data center project on the site.
16.87 miles Prime RidgeInterested in this information?Contact us
Amazon is constructing a two building data center campus in Marysville, Ohio, potentially spanning 500,000 square feet.
17.00 miles HubInterested in this information?Contact us
This facility is part of Amazon's Marysville Campus in Ohio.
17.21 miles Karis: Galloway, Ohio
Karis Critical's proposed data center project on 127 acres in Prairie Township, Ohio, remains strictly in a "land-banked" planning phase, with no formal development or construction application submitted to local authorities.
18.01 miles South PlazaInterested in this information?Contact us
Cryptoasset technology firm Bit Mining's Ohio data center has 40,000 square meters of floor space and can host up to 30,000 Bitcoin mining machines.
19.19 miles Aligned: Pataskala
Aligned Data Centers, is targeting Pataskala for its second development in the Buckeye State.

Centersquare: Columbus CMH1 Data Center Photos See all

Exterior of Cyxtera CMH1
Source: Baxtel
Cyxtera's Facility at 8180 Green Meadows Drive in Columbus
Source: Google Maps

Operating Company

Operated by:

Csquare is a preeminent colocation provider with a proven track record of providing highly reliable data center services. Prioritizing security, reliability and superior customer service, Csquare offers flexible data center solutions backed by a 100% uptime guarantee.

With 80 data center locations in 30 critical markets and a host of on-prem, hybrid and on-demand solutions, Csquare is a trusted expert for thousands of diverse organizations across all industries.

Centersquare is a colocation and interconnection provider formed in 2024 when Brookfield Infrastructure combined Evoque Data Center Solutions and the acquired assets of Cyxtera Technologies.

Centersquare History:

  • April 2024: Rebranded from Evoque and Cyxtera to Centersquare.
  • January 2024: Founded as Centersquare when Evoque closed the acquisition of Cyxtera’s data center portfolio to create a combined platform.

Evoque Data Center Solutions History:

Evoque Data Center Solutions is a data center operator created in 2019 after Brookfield Infrastructure Partners acquired AT&T’s colocation assets.

  • April 2024: Rebranded from Evoque Data Center Solutions and Cyxtera to Centersquare.
  • 2024: Closed acquisition of Cyxtera’s data center portfolio.
  • 2022: Exited international data centers to concentrate on U.S. sites.
  • 2019: Launched following Brookfield Infrastructure Partners’ acquisition of AT&T’s colocation assets.

Cyxtera:

Cyxtera Technologies was a data center operator formed in 2017 when funds advised by BC Partners and Medina Capital acquired CenturyLink’s data centers and colocation business and combined it with Medina Capital’s security and analytics portfolio.

Cyxtera Technologies History:

  • April 2024: Rebranded from Cyxtera Technologies to Centersquare together with Evoque.
  • November 2023: Entered an asset purchase agreement for Brookfield affiliates to acquire substantially all assets, including related real estate transactions.
  • June 2023: Filed for Chapter 11 to implement a restructuring support agreement and obtain debtor-in-possession financing.
  • February 2021: Agreed to merge with Starboard Value Acquisition Corp. to become a publicly traded company.
  • May 2017: Launched following the sale of CenturyLink’s data centers and colocation business to a consortium led by BC Partners and Medina Capital, combined with Medina Capital’s security and analytics portfolio.
56
Facilities
22
Markets
434MW
Megawatts

News See all

Read Evoque To Develop a 100MW Facility in Nashville
Evoque To Develop a 100MW Facility in Nashville

Evoque To Develop a 100MW Facility in Nashville

May 13, 2022 Csquare

Evoque has announced that it is developing a data center campus outside Nashville in Gallatin, Tennessee. Evoque is working with Archer Datacenters to provide data center capacity at an existing data center while expanding the site further. The 28.5-acre site is located at 1398 Gateway Drive. It...

Read more
Read Evoque Starts Offering Build-to-Suit Data Center Services
Evoque Starts Offering Build-to-Suit Data Center Services

Evoque Starts Offering Build-to-Suit Data Center Services

April 19, 2022 Csquare

Evoque has announced that it is moving beyond a colocation provider to offering build-to-suit data center services. The company's senior director of communications, Kevin Fleming, revealed that it is pioneering a new development with its build-to-suit solutions for government, hyperscale, and...

Read more
Read Evoque Data Centers acquires Foghorn Consulting
Evoque Data Centers acquires Foghorn Consulting

Evoque Data Centers acquires Foghorn Consulting

July 06, 2021 Csquare

Evoque Data Center Solutions has completed the acquisitions of Foghorn Consulting, a cloud consulting and engineering services company based in Silicon Valley. Evoque said acquiring Foghorn will help it serve its customers’ cloud needs better. With the acquisition, Evoque has expanded its...

Read more
Read Evoque Data Center Solutions partners with four additional network service providers
Evoque Data Center Solutions partners with four additional network service providers

Evoque Data Center Solutions partners with four additional network service providers

June 07, 2021 Csquare

Evoque Data Center Solutions has announced partnerships with four Network Service Providers (NSPs). It looks to use the partnership to expand its vendor-neutral approach to offering state-of-the-art connectivity to its customers. The new NSPs include Bandwith IG, Everstream, United Private...

Read more
Read Tom Marx joins Evoque as Chief Revenue Officer
Tom Marx joins Evoque as Chief Revenue Officer

Tom Marx joins Evoque as Chief Revenue Officer

September 28, 2020 Csquare

Tom Marx will join Evoque as Chief Revenue Officer. Marx, who is based in Denver, spent the majority of his career at tw telecom subsequently Level3/CenturyLink via acquisition. Evoque Press Release on Sept 28, 2020:DALLAS – Evoque Data Center Solutions™, one of the world’s 20 largest data center...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?