Evoque To Develop a 100MW Facility in Nashville
May 13, 2022
Csquare
This facility was previously operated by Cyxtera. Centersquare completed the successful acquisition of Cyxtera and Evoque Data Center Solutions in early 2024.
Cyxtera's CHM1 site in Columbus was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink. The transaction which closed in May 2017 created Cyxtera Technologies.
The site's short code was formerly "Cyxtera CL1"
DCI Technology Holdings owns the building and is CenturyLink's landlord.
CenturyLink
AT&T - MW (OH)
Level 3 Communications
TW Telecom
XO Communications
| Distance | Site | About |
|---|---|---|
| 1.00 miles | Expedient: Lewis Center |
Expedient data center Located at 281 E. Powell Road in Lewis Center township with The 102,000 sq ft (9,475 sqm) facility offers 3MW of initial power capacity that will be increased to 7.5 MW in the future.
|
| 1.49 miles | Cologix: Columbus COL5 |
Cologix is constructing a 60,000-square-foot, AI-ready facility, COL5, in Columbus, Ohio.
|
| 1.52 miles | Cologix: COL6 |
This planned facility is part of Cologix COL5 campus in Columbus.
|
| 3.53 miles | Cologix Columbus COL4 |
Cologix is building COL4, a 256,000 square foot data center on 9 acres along Alta View and Worthington Woods boulevards in Ohio. This facility will offer 27 MW of capacity.
|
| 3.64 miles | Cologix Columbus COL1, COL2 |
COL1 (32,000sqft) and COL2 (20,000sqft) represent 2 phases of buildout in the same building.
Cologix entered the Columbus market in February of 2014 through an acquisition of DataCenter.BZ
|
| 3.70 miles | Cologix COL3 | |
| 4.71 miles | WeConnect Westerville |
|
| 7.05 miles | eNET Columbus |
|
| 8.07 miles | DartPoints: Dublin, OH |
The facility was previously operated by Metro Data Center LLC before being acquired by Dartpoints in October 2020.
|
| 8.50 miles | Expedient Upper Arlington |
|
| 8.81 miles | Expedient Dublin |
Offering 29,000 square foot of total floor space, Expedient’s Dublin data center is powered by redundant electric utility power feeds and 4 auto-cutover diesel generators
|
| 9.07 miles | Racksquared 2560 Value Way | |
| 9.25 miles | Hyperscale Data Center Request Dataset |
Construction of the first 450,000 square foot (41,800 sq m) building is expected to begin in January 2028 and be completed by December 2034.
|
| 9.85 miles | Hyperscale Data Center Request Dataset | |
| 9.92 miles | Hyperscale Data Center Request Dataset |
|
| 9.98 miles | Hyperscale Data Center Request Dataset | |
| 10.01 miles | Hyperscale Data Center Request Dataset | |
| 10.04 miles | Hyperscale Data Center Request Dataset | |
| 10.12 miles | Connect Data Centers: Hilliard, OH |
US involvement from Oppidan's Hilliard data center spans 89,954 sqft. Oppidan lists Connect Data Centers as a subsidiary.
|
| 10.51 miles | Hyperscale Data Center Request Dataset | |
| 10.70 miles | Hyperscale Data Center Request Dataset |
Amazon's $200 million data center campus is situated on 111 acres at the southwest corner of Warner Road and Industrial Parkway.
|
| 10.71 miles | Hyperscale Data Center Request Dataset |
Amazon's $200 million data center campus is situated on 111 acres at the southwest corner of Warner Road and Industrial Parkway.
|
| 10.72 miles | Hyperscale Data Center Request Dataset |
Amazon's $200 million data center campus is situated on 111 acres at the southwest corner of Warner Road and Industrial Parkway.
|
| 10.72 miles | Hyperscale Data Center Request Dataset |
Amazon's $200 million data center campus is situated on 111 acres at the southwest corner of Warner Road and Industrial Parkway.
|
| 10.85 miles | Hyperscale Data Center Request Dataset |
Amazon's Industrial Parkway Campus is situated on 98 acres at 8619 Industrial Parkway in Union County’s Jerome Township.
|
| 10.90 miles | Hyperscale Data Center Request Dataset |
Amazon's Industrial Parkway Campus is situated on 98 acres at 8619 Industrial Parkway in Union County’s Jerome Township.
|
| 10.96 miles | Hyperscale Data Center Request Dataset |
Amazon is building a five-building data center campus in New Albany, Ohio.
|
| 10.96 miles | Hyperscale Data Center Request Dataset |
Amazon is building a five-building data center campus in New Albany, Ohio. Amazon 6675 Crosby Ct facility is the second building of the campus with an area of 152945 sqft.
|
| 10.98 miles | Hyperscale Data Center Request Dataset |
Amazon is building a five-building data center campus in New Albany, Ohio. Amazon 6665 Crosby Ct facility is the third building of the campus with an area of 152945 sqft.
|
| 11.01 miles | Hyperscale Data Center Request Dataset |
Amazon is building a five-building data center campus in New Albany, Ohio. Amazon 6655 Crosby Ct facility is the fourth building of the campus with an area of 152,945 sqft.
|
| 11.03 miles | Hyperscale Data Center Request Dataset |
Amazon is building a five-building data center campus in New Albany, Ohio. Amazon 6645 Crosby Ct facility would be the fourth building of the campus with an area of 152,945 sqft.
|
| 11.05 miles | Hyperscale Data Center Request Dataset |
Amazon's Industrial Parkway Campus is situated on 98 acres at 8619 Industrial Parkway in Union County’s Jerome Township.
|
| 11.09 miles | Hyperscale Data Center Request Dataset |
Amazon's Industrial Parkway Campus is situated on 98 acres at 8619 Industrial Parkway in Union County’s Jerome Township.
|
| 11.21 miles | Edged Energy: Columbus CMH01 |
Edged Energy data center spans 206,000 sq ft on a 15-acre parcel at 6385 New Albany Road East.
|
| 11.30 miles | Discover Financial Services New Albany |
|
| 11.52 miles | TJX Corporate Techno | |
| 11.61 miles | Compass New Albany | |
| 11.69 miles | Compugen New Albany |
|
| 11.75 miles | Stack: NAL01B |
STACK INFRASTRUCTURE is expanding it's NAL01 campus, located at Souder Road, New Albany, OH.
|
| 11.80 miles | Hyperscale Data Center Request Dataset |
Amazon is constructing its third data center campus in Hilliard at the intersection of Scioto Darby Road and the Interstate 270 overpass.
|
| 11.84 miles | Hyperscale Data Center Request Dataset |
Amazon is constructing its third data center campus in Hilliard at the intersection of Scioto Darby Road and the Interstate 270 overpass.
|
| 11.84 miles | Hyperscale Data Center Request Dataset |
Amazon is constructing its third data center campus in Hilliard at the intersection of Scioto Darby Road and the Interstate 270 overpass.
|
| 11.90 miles | Hyperscale Data Center Request Dataset |
The complex will comprise seven buildings for data center operations and an additional structure for security and utilities.
|
| 11.91 miles | STACK New Albany NAL01 |
STACK acquired the facility in October 2019 from Nationwide Insurance. Nationwide initially built the facility in 2008 for a cost of $96 million.
|
| 11.91 miles | Hyperscale Data Center Request Dataset |
This data center is a part of amazon's Cosgray Road Campus in Hilliard, Ohio.
|
| 11.96 miles | Hyperscale Data Center Request Dataset |
This data center is a part of amazon's Cosgray Road Campus in Hilliard, Ohio.
|
| 12.00 miles | Hyperscale Data Center Request Dataset |
This data center is a part of amazon's Cosgray Road Campus in Hilliard, Ohio.
|
| 12.05 miles | Hyperscale Data Center Request Dataset |
Amazon's second data center campus in Hilliard, Ohio, is situated on a 104-acre site between Cosgray and Leppert roads.
|
| 12.16 miles | Hyperscale Data Center Request Dataset |
Amazon is constructing its third data center campus in Hilliard at the intersection of Scioto Darby Road and the Interstate 270 overpass.
|
| 12.20 miles | Hyperscale Data Center Request Dataset |
Amazon is constructing its third data center campus in Hilliard at the intersection of Scioto Darby Road and the Interstate 270 overpass.
|
| 13.42 miles | Lumen: 580 North 4th | |
| 13.87 miles | Lumen: 266 North 5th | |
| 13.89 miles | Cogent: 240 North 5th | |
| 13.89 miles | CityNet Columbus | |
| 13.92 miles | Lumen: 226 North Fifth | |
| 13.92 miles | WOW! 226 N 5th |
WOW!'s Columbus datacenter was acquired in 2013 from Bluemile assets. The site offers 26,00sqft and can expand to 52,00 sqft.
|
| 13.99 miles | Racksquared 325 E Spring St | |
| 14.05 miles | Hyperscale Data Center Request Dataset |
Microsoft purchased 183 acres of land on Beech Road in New Albany in 2023.
|
| 14.16 miles | Karis Critical: New Albany, OH |
Data center developer Karis Critical has purchased 115 acres of land in New Albany, Ohio.
|
| 14.23 miles | CENTRA: 180 East Broad (CMH01) | |
| 14.23 miles | US Signal Columbus |
DC power w/battery backup available
Multiple diverse power feeds from utility grids |
| 14.25 miles | Hyperscale Data Center Request Dataset |
This facility will be part of Amazon's new data center campus along Beech and Miller roads in New Albany.
|
| 14.26 miles | Carrier-Neutral Data Center Request Dataset | |
| 14.26 miles | Hyperscale Data Center Request Dataset |
This facility will be part of Amazon's new data center campus along Beech and Miller roads in New Albany.
|
| 14.27 miles | QTS: Babbitt Rd, New Albany |
QTS Data Centers wants to build eight additional facilities spanning 3.2 million square feet on 240 acres on Babbitt and Miller roads. It will invest nearly $3 billion in those projects.
|
| 14.35 miles | Hyperscale Data Center Request Dataset |
This facility is part of Amazon's 3180 Beech Road Campus in New Albany.
|
| 14.36 miles | Hyperscale Data Center Request Dataset |
This facility will be part of Amazon's new data center campus along Beech and Miller roads in New Albany.
|
| 14.40 miles | Hyperscale Data Center Request Dataset |
This facility is part of Amazon's 3180 Beech Road Campus in New Albany.
|
| 14.41 miles | Hyperscale Data Center Request Dataset |
This facility will be part of Amazon's new data center campus along Beech and Miller roads in New Albany.
|
| 14.42 miles | Hyperscale Data Center Request Dataset |
Amazon is building five data centers and related buildings totaling 1.25 million square feet on 85 of the 439 acres the company bought along Beech and Miller roads in early 2023.
|
| 14.43 miles | Hyperscale Data Center Request Dataset |
This facility is part of Amazon's 3180 Beech Road Campus in New Albany.
|
| 14.45 miles | Hyperscale Data Center Request Dataset |
This facility is part of Amazon's 3180 Beech Road Campus in New Albany.
|
| 14.51 miles | Hyperscale Data Center Request Dataset |
This facility is part of Amazon's 3180 Beech Road Campus in New Albany.
|
| 14.52 miles | Crown Castle 101 E Town |
Crown Castle acquired Lightower in 2017
|
| 14.55 miles | Hyperscale Data Center Request Dataset | |
| 14.55 miles | CeraNet Columbus | |
| 14.60 miles | Hyperscale Data Center Request Dataset | |
| 14.62 miles | Hyperscale Data Center Request Dataset | |
| 14.66 miles | Vantage: New Albany (OH1) |
Vantage has started work on its OH1 data center campus at 3475 Horizon Ct., which is inside the Silicon Heartland Innovation Park.
|
| 14.70 miles | Hyperscale Data Center Request Dataset |
This facility is part of Google's New Albany campus in Ohio.
|
| 14.70 miles | Vantage: OH12 |
This facility is a part of Vantage's New Albany data center campus in Ohio.
|
| 14.73 miles | Vantage: OH13 |
This facility is a part of Vantage's New Albany data center campus in Ohio.
|
| 14.74 miles | Lincoln Rackhouse: Silicon Heartland Innovation Park |
|
| 14.77 miles | QTS: Miller Road, New Albany |
QTS Data Centers wants to build eight additional facilities spanning 3.2 million square feet on 240 acres on Babbitt and Miller roads. It will invest nearly $3 billion in those projects.
|
| 14.78 miles | Hyperscale Data Center Request Dataset |
This facility is part of Google's New Albany campus in Ohio.
|
| 14.85 miles | Hyperscale Data Center Request Dataset | |
| 14.87 miles | Hyperscale Data Center Request Dataset | |
| 14.91 miles | Kyndryl Columbus | |
| 14.99 miles | Hyperscale Data Center Request Dataset |
The campus is located on a 447-acre site on the west side of Beech Road, south of the state Route 161 interchange.
|
| 15.04 miles | Hyperscale Data Center Request Dataset |
This facility is part of Google's New Albany campus in Ohio.
|
| 15.06 miles | Hyperscale Data Center Request Dataset |
This facility is part of Google's New Albany campus in Ohio.
|
| 15.08 miles | Hyperscale Data Center Request Dataset |
This facility is part of Google's New Albany campus in Ohio.
|
| 15.15 miles | QTS: New Albany 1 DC1 |
QTS New Albany 1 is a two-building data center campus in New Albany, Ohio. The first building of the campus is located at 1225 Beech Rd SW, New Albany, OH.
|
| 15.18 miles | QTS: New Albany 1 DC2 |
QTS New Albany 1 is a two-building data center campus in New Albany, Ohio. The second building, New Albany 1 DC2, of the campus is located at 1275 Beech Rd SW, New Albany, OH.
|
| 15.22 miles | Hyperscale Data Center Request Dataset |
This facility is part of Google's New Albany campus in Ohio.
|
| 15.38 miles | Hyperscale Data Center Request Dataset |
Meta operates a data center campus in New Albany, Ohio, located at 1 Community Circle. The New Albany site consists of five data centers, spanning a total of 2.5 million square feet.
|
| 15.40 miles | Hyperscale Data Center Request Dataset |
Google recently expanded its footprint in Ohio, acquiring nearly 85 acres of land in New Albany, outside Columbus, for $63 million.
|
| 15.44 miles | Hyperscale Data Center Request Dataset |
This data center is a part of Meta's New Albany Campus in Ohio.
|
| 15.48 miles | Hyperscale Data Center Request Dataset |
Amazon Web Services plans to invest $400 million to build a 170,000-square-foot data center on 100 acres in the eastern portion of the New Albany International Business Park
|
| 15.52 miles | Hyperscale Data Center Request Dataset |
Meta’s $42 million acquisition of the Clover Valley Road parcel through its subsidiary Sidecat LLC marks a strategic expansion of the Prometheus AI Supercluster in New Albany, Ohio.
|
| 15.55 miles | Hyperscale Data Center Request Dataset |
This data center is a part of Meta's New Albany Campus in Ohio.
|
| 15.55 miles | QTS: New Albany 2 DC1 |
QTS New Albany 2 is a two-building data center campus in New Albany, Ohio. New Albany 2 DC1 is located at 785 Beech Rd SW, Pataskala, OH.
|
| 15.57 miles | Hyperscale Data Center Request Dataset | |
| 15.57 miles | Cologix: Johnstown COL8 | |
| 15.59 miles | Hyperscale Data Center Request Dataset | |
| 15.61 miles | Hyperscale Data Center Request Dataset | |
| 15.63 miles | Hyperscale Data Center Request Dataset |
This data center is a part of Meta's New Albany Campus in Ohio.
|
| 15.63 miles | QTS: New Albany 2 DC2 |
QTS New Albany 2 is a two-building data center campus in New Albany, Ohio. New Albany 2 DC2 is located at 675 Beech Rd SW, Etna, OH.
|
| 15.63 miles | Hyperscale Data Center Request Dataset |
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
|
| 15.65 miles | Hyperscale Data Center Request Dataset |
This data center is a part of Meta's New Albany Campus in Ohio.
|
| 15.70 miles | Hyperscale Data Center Request Dataset |
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
|
| 15.74 miles | Hyperscale Data Center Request Dataset | |
| 15.75 miles | Hyperscale Data Center Request Dataset |
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
|
| 15.78 miles | Cologix: Johnstown COL7 |
Cologix has acquired approximately 154 acres of land in Johnstown, Ohio, to develop a new, AI-ready data center campus.
|
| 15.79 miles | Hyperscale Data Center Request Dataset |
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
|
| 15.83 miles | Cologix: Johnstown Expansion | |
| 15.84 miles | Hyperscale Data Center Request Dataset |
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
|
| 15.88 miles | Hyperscale Data Center Request Dataset | |
| 15.89 miles | Hyperscale Data Center Request Dataset |
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
|
| 15.94 miles | Hyperscale Data Center Request Dataset |
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
|
| 16.08 miles | EdgeConnex: Johnstown North Campus |
EdgeConnex acquired a 170.29-acre parcel of land for roughly $62.2 million, or about $365,017 per acre.
|
| 16.10 miles | EdgeConnex: Johnstown South 2 |
Phase II of EdgeConneX's Johnstown South Campus will see the construction of a new two-story 700,000 sq ft (65,030 sqm) building.
|
| 16.10 miles | Hyperscale Data Center Request Dataset |
Meta's Prometheus data center campus, located in New Albany, Ohio, represents a major advancement in AI infrastructure.
|
| 16.21 miles | EdgeConnex: Johnstown South Campus |
EdgeConneX, a US data center operator, invested $137.2 million to acquire nearly 270 acres across multiple sites in Licking County.
|
| 16.28 miles | DBT Data: Jug & Mink Project |
Washington DC-based DBT-Data plans to develop a data center at the New Albany International Business Park, close to Intel's upcoming chip fab site.
|
| 16.28 miles | CyrusOne: New Albany COL-1 |
CyrusOne has broken ground on a $150 million data center development in New Albany, Ohio.
|
| 16.45 miles | DBT Data: 2214 Harrison Rd |
DBT Data acquired 44 acres of land in March 2022 with the intention of developing a data center project on the site.
|
| 16.87 miles | Hyperscale Data Center Request Dataset |
Amazon is constructing a two building data center campus in Marysville, Ohio, potentially spanning 500,000 square feet.
|
| 17.00 miles | Hyperscale Data Center Request Dataset |
This facility is part of Amazon's Marysville Campus in Ohio.
|
| 18.01 miles | Crypto Mining Data Center Request Dataset |
Cryptoasset technology firm Bit Mining's Ohio data center has 40,000 square meters of floor space and can host up to 30,000 Bitcoin mining machines.
|
| 19.19 miles | Aligned: Pataskala |
Aligned Data Centers, is targeting Pataskala for its second development in the Buckeye State.
|
Csquare is a preeminent colocation provider with a proven track record of providing highly reliable data center services. Prioritizing security, reliability and superior customer service, Csquare offers flexible data center solutions backed by a 100% uptime guarantee.
With 80 data center locations in 30 critical markets and a host of on-prem, hybrid and on-demand solutions, Csquare is a trusted expert for thousands of diverse organizations across all industries.
Centersquare is a colocation and interconnection provider formed in 2024 when Brookfield Infrastructure combined Evoque Data Center Solutions and the acquired assets of Cyxtera Technologies.
Evoque Data Center Solutions is a data center operator created in 2019 after Brookfield Infrastructure Partners acquired AT&T’s colocation assets.
Cyxtera Technologies was a data center operator formed in 2017 when funds advised by BC Partners and Medina Capital acquired CenturyLink’s data centers and colocation business and combined it with Medina Capital’s security and analytics portfolio.
May 13, 2022
Csquare
April 19, 2022
Csquare
July 06, 2021
Csquare
June 07, 2021
Csquare
September 28, 2020
Csquare
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas