Tokyo Data Center Market

Latest Podcast

The Tokyo data center market is located in the country of Japan within Asia-Pacific (APAC). Tokyo has 140 facilities.

The top providers in Tokyo are AirTrunk (6 sites) and AT TOKYO Corporation with 2 facilities . The most popular facilities are @Tokyo Chuo Center (CC1 & CC2) and Equinix Tokyo TY2.

Market Facts

Tokyo Data Center Map

Tokyo Power Growth Over Time

+110% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Data Centers in Tokyo

Name Company Size Status Type
AT&T Tokyo NRT4 AT&T Operational Carrier
Equinix Tokyo TY5 Equinix Extra Small Operational Carrier-Neutral
Equinix Tokyo TY3 Equinix Small Operational Carrier-Neutral
Equinix Tokyo TY2 Equinix Extra Small Operational Carrier-Neutral
Equinix Tokyo TY8 Equinix Small Operational Carrier-Neutral
Equinix Tokyo TY10 Equinix Small Operational Carrier-Neutral
Equinix Tokyo TY9 Equinix Small Operational Carrier-Neutral
Equinix Tokyo TY4 Equinix Small Operational Carrier-Neutral
Equinix Tokyo TY7 Equinix Extra Small Operational Carrier-Neutral
Equinix Tokyo TY6 Equinix Small Operational Carrier-Neutral
Equinix Tokyo TY11 Equinix Small Operational Carrier-Neutral
Equinix Tokyo TY1 Equinix Extra Small Operational Carrier-Neutral
Equinix TY12x Equinix Small Operational, Prospective Expansion Carrier-Neutral
Equinix TY15 Equinix Medium Construction, Operational, Planned Carrier-Neutral
Equinix: TY13x Equinix Small Operational Carrier-Neutral
STACK: TKY01A STACK INFRASTRUCTURE Medium Operational HPC
STACK: TKY01B STACK INFRASTRUCTURE Medium Construction HPC
INAP Edogawa-ku HorizonIQ Operational Carrier
INAP Koto-ku HorizonIQ Small Operational Carrier
INAP Heiwajima Ota-ku HorizonIQ Operational Carrier
NTT Tokyo Otemachi Building NTT Operational Carrier-Neutral (Telco-Owned)
NTT Tokyo No 11 NTT Medium Operational Carrier-Neutral (Telco-Owned)
NTT Tokyo 5 NTT Small Operational Carrier-Neutral (Telco-Owned)
NTT TK1 NTT Operational Carrier-Neutral (Telco-Owned)
NTT TK2 NTT Operational Carrier-Neutral (Telco-Owned)
NTT TK3 NTT Operational Carrier-Neutral (Telco-Owned)
NTT TK4 NTT Operational Carrier-Neutral (Telco-Owned)
NTT TK6 NTT Small Operational Carrier-Neutral (Telco-Owned)
NTT TK8 NTT Operational Carrier-Neutral (Telco-Owned)
NTT TK9 NTT Extra Small Operational Carrier-Neutral (Telco-Owned)
NTT Mitaka West NTT Operational Carrier-Neutral (Telco-Owned)
NTT TK12 NTT Operational Carrier-Neutral (Telco-Owned)
NTT Yokohama 1 NTT Small Operational Carrier-Neutral (Telco-Owned)
NTT: Tochigi Inter Industrial Park NTT Large Planned Carrier-Neutral (Telco-Owned)
NTT: Shiroi SHR1 NTT Large Construction, Planned Carrier-Neutral (Telco-Owned)
NTT: Tokyo TKY12 NTT Large Construction, Planned Carrier-Neutral (Telco-Owned)
Telehouse Tokyo Tama 3 Telehouse Small Operational Carrier-Neutral (Telco-Owned)
Telehouse: Tokyo Tama 1 Telehouse Small Operational Carrier-Neutral (Telco-Owned)
Telehouse: Tokyo Tama 2 Telehouse Small Operational Carrier-Neutral (Telco-Owned)
Telehouse: Tokyo Shibuya Telehouse Small Operational Carrier-Neutral (Telco-Owned)
Telehouse: Oyama Telehouse Small Operational Carrier-Neutral (Telco-Owned)
Vantage Tokyo (HND1) Vantage Data Centers In Doubt Carrier-Neutral
Carrier-Neutral Data CenterInterested in this information?Contact us Vantage Data Centers Large Planned Carrier-Neutral
Deft: Tokyo TY1 Summit Extra Small Operational Carrier-Neutral
Colt KVH Tokyo Colt Data Centre Services Operational Carrier
Colt Ōtemachi Colt Data Centre Services Extra Small Operational Carrier
Colt: Inzai 1 Colt Data Centre Services Small Operational Carrier
Colt Shiohama Colt Data Centre Services Small Operational Carrier
Colt: Inzai 4 Colt Data Centre Services Medium Construction, Operational Carrier
Colt: Inzai 2 Colt Data Centre Services Small Operational Carrier
Colt: Inzai 3 Colt Data Centre Services Medium Operational Carrier
Colt: Inzai 5 Colt Data Centre Services Medium Planned Carrier
Colt: Yoshikawa B1 Colt Data Centre Services Large Planned Carrier
Colt: Yoshikawa B2 Colt Data Centre Services Medium Planned Carrier
Keppel DC: Tokyo 1 Keppel Data Center REIT Medium Operational Carrier-Neutral
Keppel DC: Tokyo 2 Keppel Data Center REIT Large Construction Carrier-Neutral
NEXTDC: TK1 Tokyo NEXTDC Medium Construction Carrier-Neutral
STT Tokyo 1 ST Telemedia Global Data Centres (STT GDC) Medium Operational Carrier-Neutral
STT Tokyo 2 ST Telemedia Global Data Centres (STT GDC) Large Construction Carrier-Neutral
@Tokyo Chuo Center (CC1 & CC2) AT TOKYO Corporation Extra Large Operational Carrier-Neutral
AT TOKYO Central Tokyo AT TOKYO Corporation Medium Operational Carrier-Neutral
KDDI Tokyo Otemachi KDDI Operational Carrier
Telehouse: Tokyo Tama 5 KDDI Small Operational Carrier
Telehouse: Tokyo Fuchu KDDI Operational Carrier
Telecom Center Building Telecom Center Building Operational Carrier-Neutral
AirTrunk Tokyo TOK1 AirTrunk Small Operational Carrier-Neutral
AirTrunk Tokyo TOK2 AirTrunk Large Operational Carrier-Neutral
AirTrunk: TOK2 DC2 AirTrunk Large Operational Carrier-Neutral
AirTrunk: TOK1 DC2 AirTrunk Large Operational Carrier-Neutral
AirTrunk: TOK1 DC3 AirTrunk Large Operational Carrier-Neutral
AirTrunk: TOK1 DC4 AirTrunk Large Construction Carrier-Neutral
AirTrunk: TOK1 DC5 AirTrunk Large Planned Carrier-Neutral
AirTrunk: TOK1 DC6 AirTrunk Large Planned Carrier-Neutral
AirTrunk: TOK1 DC7 AirTrunk Large Planned Carrier-Neutral
Prime PlazaInterested in this information?Contact us Google Large Operational Hyperscale
NTT DATA Otemachi NTT Data Operational MSP
NTT DATA Mitaka East (TK10) NTT Data Large Operational MSP
Empyrion: Tokyo JP1 Empyrion Digital Medium Planned Carrier-Neutral
MC Digital Realty-Inazi (NRT10) MC Digital Realty Large Operational Carrier-Neutral
MCC Mitaka: North Block MC Digital Realty Small Operational Carrier-Neutral
MCC Mitaka: South Block MC Digital Realty Small Operational Carrier-Neutral
MC Digital Realty (NRT12) MC Digital Realty Medium Operational Carrier-Neutral
MC Digital Realty: NRT14 MC Digital Realty Medium Operational Carrier-Neutral
Canon Nishi-Tokyo Canon IT Solutions Inc Medium Operational MSP
Princeton PDG TY1 DC1 Princeton Digital Group Large Operational Carrier-Neutral
Princeton PDG TY1 DC2 Princeton Digital Group Large Construction Carrier-Neutral
Mapletree: Tama-shi Mapletree Redwood Data Centre Trust Land Bank Real Estate
Digital Edge: Comspace I (TY02) Digital Edge DC Operational Carrier-Neutral
Digital Edge: Tokyo TY01 Digital Edge DC Small Operational Carrier-Neutral
Digital Edge: Yokohama TY04 Digital Edge DC Small Operational Carrier-Neutral
Digital Edge: Shibuya (SDC) Digital Edge DC Extra Small Operational Carrier-Neutral
Digital Edge: Otemachi TYO2 Digital Edge DC Extra Small Operational Carrier-Neutral
Digital Edge: Comspace II (TY03) Digital Edge DC Small Operational Carrier-Neutral
Digital Edge: TY07 Digital Edge DC Small Operational Carrier-Neutral
Digital Edge: Yokohama TY05 Digital Edge DC Extra Small Operational Carrier-Neutral
Digital Edge: Yokohama TY06 Digital Edge DC Extra Small Operational Carrier-Neutral
Marunouchi Marunouchi Direct Access ltd Extra Small Operational Carrier-Neutral
Marunouchi: Otemachi II Marunouchi Direct Access ltd Operational Carrier-Neutral
Marunouchi: Otemachi I Marunouchi Direct Access ltd Operational Carrier-Neutral
NEC: Sagamihara, Kanagawa NEC Corporation Medium Operational Enterprise
NEC: Kanagawa 2 NEC Corporation Medium Operational Enterprise
ADA: TKW1 DC1 Ada Infrastructure Small Operational Carrier-Neutral
ADA: TKW1 DC2 Ada Infrastructure Small Construction Carrier-Neutral
ADA: TKW1 DC3 Ada Infrastructure Small Construction Carrier-Neutral
ADA: Tokyo West 2 Ada Infrastructure Extra Large Planned Carrier-Neutral
ADA: TKE1 Bldg1 Ada Infrastructure Medium Construction Carrier-Neutral
ADA: Tokyo East 2 Ada Infrastructure Extra Large Planned Carrier-Neutral
Carrier-Neutral Data CenterInterested in this information?Contact us Ada Infrastructure Medium Planned Carrier-Neutral
Carrier-Neutral Data CenterInterested in this information?Contact us Ada Infrastructure Medium Planned Carrier-Neutral
Goodman: Shirakami Goodman Group Large Construction, Planned Real Estate
Goodman: Sagamihara Goodman Group Land Bank Real Estate
ESR Group: Higashikurume ESR Group Medium Construction Real Estate
ESR Group: Ariake ESR Group Large Planned Real Estate
SoftBank: Tokyo Fuchu Softbank Corp. Medium Operational Private Equity
SoftBank: Tokyo Ariake Softbank Corp. Extra Small Operational Private Equity
SoftBank: Tokyo Nihombashi Softbank Corp. Operational Private Equity
SoftBank: Kanagawa Yokohama Softbank Corp. Operational Private Equity
SoftBank: Tokyo 4 Softbank Corp. Small Operational Private Equity
SoftBank: Tokyo No. 2 Softbank Corp. Small Operational Private Equity
SoftBank: Tokyo No. 5 Softbank Corp. Small Operational Private Equity
DayOne: Fuchu Intelligent Park DayOne Large Construction, Planned, Prospective Expansion Carrier-Neutral
SKYY: Koto City SKYY Development Medium Operational Real Estate
Mitsui: Kanagawa Mitsui & Co., Ltd. Medium Operational Enterprise
Flow Digital: Tokyo TK7 Flow Digital Infrastructure Small Construction Real Estate
Flow Digital: TK8 Flow Digital Infrastructure Medium Planned Real Estate
Goldman Sachs: Tokyo HND1 Goldman Sachs Large Operational, Planned Fintech
I-NET: Annex, Tokyo I-NET Corp. Extra Small Construction MSP
I-NET: DC1 Maioka I-NET Corp. Small Operational MSP
I-NET: DC2 Kamiyabe I-NET Corp. Small Operational MSP
TISI: Tokyo 4th DC (GDC Gotenyama) TISI Inc. Small Operational MSP
TISI: Tokyo 1st DC TISI Inc. Extra Small Operational MSP
TISI: Tokyo 2nd DC (Mitaka) TISI Inc. Extra Small Operational MSP
Plaza BetaInterested in this information?Contact us Amazon AWS Small Operational Hyperscale
HubInterested in this information?Contact us Amazon AWS Small Operational Hyperscale
Center MaxInterested in this information?Contact us Amazon AWS Small Operational Hyperscale
East ParkInterested in this information?Contact us Amazon AWS Small Operational Hyperscale
CentralInterested in this information?Contact us Amazon AWS Small Operational Hyperscale
WestInterested in this information?Contact us Amazon AWS Small Operational Hyperscale
Tower MaxInterested in this information?Contact us Amazon AWS Medium Operational Hyperscale
Hyperscale Data CenterInterested in this information?Contact us Amazon AWS Medium Operational Hyperscale

Largest Providers in Tokyo

AirTrunk
Site
Power
Operational
5
225.0
Construction
1
Planned
3
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
6
View Provider
AT TOKYO Corporation
Site
Power
Operational
2
155.0
Construction
0
Planned
0
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
2
View Provider
MC Digital Realty
Site
Power
Operational
6
121.6
Construction
0
Planned
0
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
6
View Provider
Amazon AWS
Site
Power
Operational
8
87.0
Construction
0
Planned
0
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
8
View Provider

Largest Data Centers in Tokyo

Location About Total SqFt Power (MW)
@Tokyo Chuo Center (CC1 & CC2) NN Request Dataset NN Request Dataset
AirTrunk Tokyo TOK2
The campus spans 4.6 hectares and aims to achieve a Power Usage Effectiveness (PUE) of 1.15. The ...
NN Request Dataset
AirTrunk: TOK1 DC3
This facility is part of AirTrunk's Tokyo 1 campus in Japan.
NN Request Dataset
AirTrunk: TOK2 DC2
AirTrunk first revealed plans for the TOK2 campus in May 2022 and began construction on the initi...
NN Request Dataset
Park PlusInterested in this information?Contact us NN Request Dataset

Sites Under Construction in Tokyo

Location Building SqFt Power (MW) Estimated Launch
ADA: TKW1 DC3 SqFt 11 Megawatts
I-NET: Annex, Tokyo 4,090 SqFt 0 Megawatts
Princeton PDG TY1 DC2 SqFt 48 Megawatts Q3 2026
AirTrunk: TOK1 DC4 SqFt 40 Megawatts Q4 2026
STT Tokyo 2 SqFt 38 Megawatts Q1 2026
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030

Regions in Tokyo

Data Center Events in Tokyo See all

1 events
Event Starts in Details
25 days
View Japan Cloud & Datacenter Convention 2026
Organized by:
W.Media
Type:
Data Center Cloud
Description:

The Japan Cloud & Datacenter Convention 2026 (JPCDC) is a one-day conference and exhibition organized by W.Media, held November 13, 2026, at Hilton Tokyo. The event brings together data center operators, cloud providers, investors, hyperscalers, technology vendors, and government representatives to examine Japan's digital infrastructure landscape in the context of accelerating AI demand, power ...

Related News See all

Read Google Strategic Sourcing Executive Joins OpenAI
Allyson Fealtman, a former Google data center strategic sourcing and supplier development lead, has joined OpenAI after 16 years at Google. She led 11 commodity managers overseeing liquid and air c...

Google Strategic Sourcing Executive Joins OpenAI

October 17, 2026 Google

Allyson Fealtman, a former Google data center strategic sourcing and supplier development lead, has joined OpenAI after 16 years at Google. She led 11 commodity managers overseeing liquid and air cooling, interconnects, and mechanical equipment. She joined OpenAI in May and will focus on...

Read more
Read NTT Installs Nvidia GPU Test Cluster at Munich 2 Data Center
NTT Global Data Centres has deployed an Nvidia GPU cluster at its Munich 2 data center, allowing clients to test AI applications at scale before committing to wider deployments. Dubbed AI Factory M...

NTT Installs Nvidia GPU Test Cluster at Munich 2 Data Center

October 15, 2026 NTT

NTT Global Data Centres has deployed an Nvidia GPU cluster at its Munich 2 data center, allowing clients to test AI applications at scale before committing to wider deployments. Dubbed AI Factory Munich, the cluster lets customers assess AI workloads against real-world infrastructure, security,...

Read more
Read SoftBank Explores Potential AI Data Center Project in Borneo
SoftBank Group, Singaporean technology company Grab Holdings, and Malaysian oil and gas firm Petroleum Sarawak Berhad (Petros) have signed a framework agreement to explore an AI and digital infrast...

SoftBank Explores Potential AI Data Center Project in Borneo

October 13, 2026 Softbank Corp.

SoftBank Group, Singaporean technology company Grab Holdings, and Malaysian oil and gas firm Petroleum Sarawak Berhad (Petros) have signed a framework agreement to explore an AI and digital infrastructure platform in Sarawak, Malaysia. Details of any planned data center development have not been...

Read more
Read Finland Halts Two Google Data Center Builds Over 300-Hectare Forest Clearing
Finnish regulators have ordered a halt to work at two planned [Google](https://baxtel.com/data-centers/google) data centers after more than 300 hectares of forest were cleared before mandatory envi...

Finland Halts Two Google Data Center Builds Over 300-Hectare Forest Clearing

October 10, 2026 Google

Finnish regulators have ordered a halt to work at two planned Google data centers after more than 300 hectares of forest were cleared before mandatory environmental impact assessments were completed, the BBC reported. The order covers the company's project sites in Muhos and Kajaani, both in the...

Read more
Read Digital Realty Starts 24MW KIX15 Data Center At Osaka KIX Campus
[Digital Realty](https://baxtel.com/data-centers/digital-realty-trust) has begun construction of KIX15, a 24-megawatt data center at its KIX Campus in Ibaraki City, Osaka Prefecture, Japan, the com...

Digital Realty Starts 24MW KIX15 Data Center At Osaka KIX Campus

October 10, 2026 Digital Realty Trust

Digital Realty has begun construction of KIX15, a 24-megawatt data center at its KIX Campus in Ibaraki City, Osaka Prefecture, Japan, the company announced on Oct. 7. The facility is being developed by MC Digital Realty, the operator's 50/50 joint venture with Mitsubishi Corporation, and is...

Read more
Read AirTrunk Plans Additional $1bn Investment in Inzai, Japan Data Center Campus
AirTrunk plans to invest an additional $1 billion to expand its Inzai data center campus in Japan and deploy liquid cooling for high-density AI workloads. The expansion will be funded by a $1 billi...

AirTrunk Plans Additional $1bn Investment in Inzai, Japan Data Center Campus

October 08, 2026 AirTrunk

AirTrunk plans to invest an additional $1 billion to expand its Inzai data center campus in Japan and deploy liquid cooling for high-density AI workloads. The expansion will be funded by a $1 billion green loan led by Sumitomo Mitsui Banking Corporation, MUFG Bank, and United Overseas Bank....

Read more

Related Podcasts See all

E11: Building India’s Digital Backbone with Sharad Agarwal

Executive Summary In this episode recorded live at PTC 26, Eric Bell speaks with Sharad Agarwal, ...

E10 - AI Cooling And Data Centers With Cliff Federspiel

In this episode, we sit down with Cliff Federspiel, President and CTO of Vigilent, to explore how...

E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins

In this Baxtel Podcast episode, Eric Bell sits down with Wes Cummins, CEO of Applied Digital, to ...

E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load

In this episode, Eric Bell sits down with Russell Fletcher to unpack what it really means to oper...

E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse

Nick Kruse is a chemical engineer turned energy entrepreneur who sits at the nexus of power and c...

E5: Mark Jobson on Data Center Strategy, Marketing, and IPOs

In this episode of Baxtel’s Meet Me Room podcast, we sit down with global marketing executive Mar...

Ready to Level up Your
Data Center Strategy?