Goodman: Shirakami

Latest Podcast 4 Chome-1-1 Kagurominami
Under ConstructionPlanned
Multi-phase construction project
Operated by:

Goodman: Shirakami

Year Planned: 2026

The Shirakami Data Centre developed by Goodman Group is located in Inzai City, Chiba Prefecture, within the Goodman Business Park—a major data center cluster about 50 kilometers east of central Tokyo.

Map and Nearby Locations

4 Chome-1-1 Kagurominami
Goodman Group Sites
Nearby Facilities

Goodman: Shirakami Power Growth Over Time

Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Goodman: Shirakami

Distance Site About
0.24 miles STT Tokyo 1
STT Tokyo 1 is the first of two buildings in STT GDC's data centre campus, supporting the demand for critical digital infrastructure in Japan.
0.33 miles STT Tokyo 2
STT Tokyo 2 is the second of two buildings in STT GDC's data center campus
0.41 miles ValleyInterested in this information?Contact us
0.76 miles Equinix TY12x
0.79 miles Equinix: TY13x
Equinix opened a new hyperscale data center, TY13x, in Tokyo, Japan in 2023. The facility is located in the Inzai region, adjacent to the existing TY12x data center.
0.82 miles AlphaInterested in this information?Contact us
0.86 miles TwoInterested in this information?Contact us
0.86 miles Park UltraInterested in this information?Contact us
0.88 miles Colt Inzai 4
Known as Inzai 4 and set on a site area of 8,750 sqm (94,185 sq ft), the facility is already 100 percent pre-let.
0.89 miles MC Digital Realty-Inazi (NRT10)
1.04 miles MC Digital Realty: NRT14
Digital Realty’s NRT14 is a 31MW data center at its Inzai campus near Tokyo, marking the third building in the development and bringing the site to ~104MW as an AI-optimized facility that became operational in April 2026.
1.10 miles MC Digital Realty (NRT12)
NRT12 is designed to offer high-density power of up to 70kW per rack
1.19 miles Colt: Inzai 3
This facility is a part of Colt's Inzai campus in Tokyo.
1.19 miles Colt: Inzai 2
This facility is a part of Colt's Inzai campus in Tokyo.
1.20 miles Colt Tokyo Inzai
The Colt campus in Chiba was opened in 2011 and hosts three facilities
1.31 miles AirTrunk: TOK1 DC6
This planned facility is part of AirTrunk's Tokyo 1 campus in Japan.
1.33 miles AirTrunk Tokyo TOK1
AirTrunk’s first data centre in Japan, AirTrunk TOK1 in Inzai near Tokyo, officially opened its doors in November 2021.
1.35 miles AirTrunk: TOK1 DC7
This planned facility is part of AirTrunk's Tokyo 1 campus in Japan.
1.36 miles AirTrunk: TOK1 DC5
This planned facility is part of AirTrunk's Tokyo 1 campus in Japan.
1.37 miles MC Digital: Tokyo Connected Campus @ Inzai
1.37 miles AirTrunk: TOK1 DC2
This facility is part of AirTrunk's Tokyo 1 campus in Japan.
1.40 miles Colt: Inzai 5
Colt is building Inzai 5 Campus on a 2.5 acre site in Chiba, Tokyo.
1.40 miles AirTrunk: TOK1 DC3
This facility is part of AirTrunk's Tokyo 1 campus in Japan.
1.43 miles AirTrunk: TOK1 DC4
This planned facility is part of AirTrunk's Tokyo 1 campus in Japan.
1.58 miles STACK TKY01
Stack Infrastructure completed their first Tokyo facility in 2024. The campus, situated in the Inzai District of Greater Tokyo, was developed collaboratively with IPI Partners and Oaktree Capital Management.
1.60 miles STACK: TKY01B
This facility is part of Stack Infrastructure's first campus in Tokyo, Japan.
2.04 miles Carrier-Neutral Data CenterInterested in this information?Contact us
This facility is part of ADA Infrastructure's Tokyo East Campus in Tokyo.
2.09 miles Carrier-Neutral Data CenterInterested in this information?Contact us
This facility is part of ADA Infrastructure's Tokyo East Campus in Tokyo.
2.13 miles ADA: Tokyo East 1
GLP's data center subsidiary, Ada Infrastructure, plans to build a data center campus in East Tokyo, Japan, consisting of three four-story data center buildings.
2.31 miles IIJ: Shiroi DCC
Japanese internet and data center company IIJ is expanding its Shiroi data center campus, situated east of Tokyo in Shiroi City, Chiba Prefecture.
2.33 miles IIJ: Shiroi Bldg 4
This facility will be part of Internet Initiative Japan Inc. (IIJ)'s Shiroi Campus.
2.33 miles IIJ: Shiroi Bldg 3
Dubbed "Phase 3," this expansion will add about 1,000 racks to Internet Initiative Japan Inc. (IIJ)'s Shiroi Campus.
2.37 miles IIJ: Shiroi Bldg 2
This facility, located within Internet Initiative Japan Inc. (IIJ)'s Shiroi Campus in Chiba Prefecture, provides space for 1,100 racks across 8,000 square meters (86,110 sq ft).
4.68 miles NTT: Shiroi SHR1
The first data center on the campus, the Shiroi Data Center (SHR1) is expected to be completed by April 2027. The building will support AI, cloud computing, and the next generation of digital services.
5.00 miles ADA: Tokyo East 2
GLP's data center subsidiary, Ada Infrastructure, plans to build a data center campus in East Tokyo, consisting of six four-story data center buildings. The campus will feature an N+1 UPS distributed redundant and N+1 closed loop air-cooled chiller plant.
15.82 miles Colt: Yoshikawa B2
Colt Data Centre Services plans to develop Yoshikawa B2 data center, which is the second building of a 9.5-acre campus in Yoshikawa.
15.85 miles Colt: Yoshikawa B1
Colt Data Centre Services is developing Yoshikawa B1 data center, which is the first building of a 9.5-acre campus in Yoshikawa.
16.77 miles INAP Edogawa-ku
19.69 miles SoftBank: Tokyo 4
SoftBank Tokyo No. 4 provides a range of colocation services to businesses.
19.70 miles NTT TK9
19.79 miles NTT TK2

Goodman: Shirakami Data Center Photos See all

Operating Company

Operated by:

Goodman is a global property group who own, develop and manage quality, sustainable properties close to consumers, and we’re dedicated to working together to make the world a better place for our customers, our people and the communities we operate in.

30
Facilities
12
Markets

News See all

Read Goodman Plans New Data Center Campus Near Tokyo
Goodman Plans New Data Center Campus Near Tokyo

Goodman Plans New Data Center Campus Near Tokyo

May 29, 2026 Goodman Group

Australian property group Goodman Group is moving forward with plans to develop a new data center campus near Tokyo. The company announced this week that it has been appointed lead development partner by a consortium of local landowners and stakeholders working on a proposed data center campus in...

Read more
Read Goodman, CPP Investments Establish €8bn European Data Center Platform
Goodman, CPP Investments Establish €8bn European Data Center Platform

Goodman, CPP Investments Establish €8bn European Data Center Platform

December 25, 2025 Goodman Group

Goodman Group has teamed up with the Canada Pension Plan Investment Board (CPP Investments) to establish a €8 billion (US$9.4bn) European data center partnership.The 50/50 venture will see the companies commit an initial €2.2bn (US$2.59bn) to develop a portfolio of data center projects across...

Read more
Read Data Centers Driving AU$17.5bn Goodman Group Construction
Data Centers Driving AU$17.5bn Goodman Group Construction

Data Centers Driving AU$17.5bn Goodman Group Construction

November 08, 2025 Goodman Group

Goodman Group expects its work-in-progress pipeline to hit a record AU$17.5 billion (US$11.3bn) next year, driven by the growth of its data center business. Goodman said it currently has AU$12.4 billion (US$8bn) of work in progress, with data centers representing 68 percent of this. The figure is...

Read more
Read Goodman Plans 97MW Facility in Silicon Valley
Goodman Plans 97MW Facility in Silicon Valley

Goodman Plans 97MW Facility in Silicon Valley

November 01, 2025 Goodman Group

Logistics firm Goodman this week announced the acquisition of a 45.8-acre site in San Jose that will host a two-building data center campus totaling 414,000 square feet (38,460 sqm) with up to 97.3MW of available power by 2028. The property, at 350 & 370 West Trimble Road in Santa Clara...

Read more
Read Stack Secures Green Financing for Data Center in Tokyo
Stack Secures Green Financing for Data Center in Tokyo

Stack Secures Green Financing for Data Center in Tokyo

October 27, 2025 Tokyo

Stack Infrastructure has secured a 39.7 billion yen ($247.7m) green financing package to develop its data center campus in Japan's capital, Tokyo. The first stage of the 36MW TKY01 campus in Inzai, Greater Tokyo, is set to come online next year, offering 18MW, with the additional capacity set to...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?