Colt Data Centre Services plans to develop Yoshikawa B2 data center, which is the second building of a 9.5-acre campus in Yoshikawa. The carrier-neutral facility features ten halls of 1,000 square meters each. The campus has the potential to accommodate up to two buildings in total for future expansion.
| Distance | Site | About |
|---|---|---|
| 0.08 miles | Colt: Yoshikawa B1 |
Colt Data Centre Services is developing Yoshikawa B1 data center, which is the first building of a 9.5-acre campus in Yoshikawa.
|
| 10.34 miles | NTT TK6 | |
| 11.13 miles | INAP Edogawa-ku | |
| 12.32 miles | NTT: Shiroi SHR1 |
The first data center on the campus, the Shiroi Data Center (SHR1) is expected to be completed by April 2027. The building will support AI, cloud computing, and the next generation of digital services.
|
| 12.38 miles | NTT Tokyo 5 |
The facility is a 1-hour drive from Narita International Airport, and a 2-minute walk from the nearest train station
|
| 12.58 miles | NTT TK12 | |
| 12.65 miles | ADA: Tokyo East 2 |
GLP's data center subsidiary, Ada Infrastructure, plans to build a data center campus in East Tokyo, consisting of six four-story data center buildings. The campus will feature an N+1 UPS distributed redundant and N+1 closed loop air-cooled chiller plant.
|
| 12.81 miles | Equinix Tokyo TY9 | |
| 12.82 miles | Equinix Tokyo TY10 | |
| 13.03 miles | Digital Edge: Tokyo TY01 |
The center is located in the Musashino plateau (Musashino gravel), built on an extremely Solid ground, resistant to natural and human disasters. Public-sector studies also affirm The location's disaster-resistance.
|
| 13.28 miles | Digital Edge: Comspace I (TY02) |
Located next to Otemachi – the telecommunications hub of Tokyo – TYO2 is one of the most network dense carrier neutral data centers in the downtown area with access to significant dark fiber capacity.
|
| 13.39 miles | NTT TK9 | |
| 13.50 miles | NTT TK1 | |
| 13.51 miles | Equinix Tokyo TY4 | |
| 13.55 miles | Colt Ōtemachi |
Colt Tokyo Otemachi Data Centre is located in Tokyo’s central business district
|
| 13.57 miles | NTT Tokyo Otemachi Building | |
| 13.57 miles | KDDI Tokyo Otemachi |
|
| 13.60 miles | Marunouchi: Otemachi I | |
| 13.60 miles | NTT DATA Otemachi | |
| 13.61 miles | NTT TK4 | |
| 13.63 miles | Marunouchi: Otemachi II | |
| 13.67 miles | NTT TK2 | |
| 13.69 miles | Empyrion: Tokyo JP1 |
The facility will be AI-ready, span 21,000 sqm across five floors, and will be Tier III carrier-neutral with secured power.
|
| 13.69 miles | INAP Koto-ku | |
| 13.99 miles | NTT TK3 | |
| 14.04 miles | SoftBank: Tokyo 4 |
SoftBank Tokyo No. 4 provides a range of colocation services to businesses.
|
| 14.08 miles | IIJ: Shiroi Bldg 4 |
This facility will be part of Internet Initiative Japan Inc. (IIJ)'s Shiroi Campus.
|
| 14.10 miles | IIJ: Shiroi Bldg 2 |
This facility, located within Internet Initiative Japan Inc. (IIJ)'s Shiroi Campus in Chiba Prefecture, provides space for 1,100 racks across 8,000 square meters (86,110 sq ft).
|
| 14.12 miles | IIJ: Shiroi Bldg 3 |
Dubbed "Phase 3," this expansion will add about 1,000 racks to Internet Initiative Japan Inc. (IIJ)'s Shiroi Campus.
|
| 14.17 miles | IIJ: Shiroi DCC |
Japanese internet and data center company IIJ is expanding its Shiroi data center campus, situated east of Tokyo in Shiroi City, Chiba Prefecture.
|
| 14.24 miles | Flow Digital: TK8 |
This facility will be part of Flow Digital's Tokyo Data Center Campus.
|
| 14.25 miles | Flow Digital: Tokyo TK7 |
APAC data center firm Flow Digital Infrastructure has started work on a new campus in Tokyo that will comprise two buildings—TK7 and TK8.
|
| 14.27 miles | Marunouchi | |
| 14.36 miles | Colt Shiohama |
|
| 14.45 miles | ADA: Tokyo East 1 |
GLP's data center subsidiary, Ada Infrastructure, plans to build a data center campus in East Tokyo, Japan, consisting of three four-story data center buildings.
|
| 14.48 miles | Carrier-Neutral Data Center Request Dataset |
This facility is part of ADA Infrastructure's Tokyo East Campus in Tokyo.
|
| 14.51 miles | Carrier-Neutral Data Center Request Dataset |
This facility is part of ADA Infrastructure's Tokyo East Campus in Tokyo.
|
| 14.63 miles | Digital Edge: Comspace II (TY03) |
TYO3 is conveniently located in the vibrant business district of Shinjuku with easy access to major transport
links. |
| 14.83 miles | Digital Edge: TYO7 |
The facility is located less than 300m from the company’s existing TYO2 facility (formerly known as ComSpace I).
|
| 14.86 miles | Colt: Inzai 3 |
This facility is a part of Colt's Inzai campus in Tokyo.
|
| 14.87 miles | Colt: Inzai 2 |
This facility is a part of Colt's Inzai campus in Tokyo.
|
| 14.88 miles | Colt Tokyo Inzai |
The Colt campus in Chiba was opened in 2011 and hosts three facilities
|
| 14.89 miles | Princeton PDG TY1 DC2 |
This facility is a part of Princeton Digital’s Tokyo data center campus in Japan. Phase 2 of the campus will be ready for service by Q2 2026.
|
| 14.89 miles | IDC Frontier: Tokyo Nihombashi |
|
| 14.92 miles | Colt: Inzai 5 |
Colt is building Inzai 5 Campus on a 2.5 acre site in Chiba, Tokyo.
|
| 14.94 miles | Equinix Tokyo TY3 | |
| 14.98 miles | Princeton PDG TY1 |
TY1 is the first project in the Lendlease Data Centre Partners fund and also PDG's first data center in Japan. Lendlease plans to invest US$490 million, and PDG will contribute US$1 to fully fit out the data center.
|
| 14.98 miles | MC Digital Realty (NRT12) |
NRT12 is designed to offer high-density power of up to 70kW per rack
|
| 15.00 miles | MC Digital Realty: NRT14 |
Digital Realty’s NRT14 is a 31MW data center at its Inzai campus near Tokyo, marking the third building in the development and bringing the site to ~104MW as an AI-optimized facility that became operational in April 2026.
|
| 15.02 miles | Equinix Tokyo TY5 | |
| 15.05 miles | Hyperscale Data Center Request Dataset | |
| 15.05 miles | Hyperscale Data Center Request Dataset | |
| 15.09 miles | MC Digital Realty-Inazi (NRT10) |
|
| 15.16 miles | Colt Inzai 4 |
Known as Inzai 4 and set on a site area of 8,750 sqm (94,185 sq ft), the facility is already 100 percent pre-let.
|
| 15.30 miles | Digital Edge: Otemachi TYO2 |
The facility was acquired in 2021 as part of Digital Edge's US$230 million (JPY26 billion) purchase of five data center assets from Itochu Techno-Solutions (CTC).
|
| 15.40 miles | Equinix TY12x |
|
| 15.40 miles | Equinix: TY13x |
Equinix opened a new hyperscale data center, TY13x, in Tokyo, Japan in 2023. The facility is located in the Inzai region, adjacent to the existing TY12x data center.
|
| 15.49 miles | Hyperscale Data Center Request Dataset | |
| 15.52 miles | SKYY: Koto City |
In 2020, AXA IM's data center division acquired a data center in Tokyo's Kota Ward for ¥22bn ($211m). The facility, built by SKYY Developments, spans 20,000 sq m (215,000 sq ft) and houses 2,560 data racks, making it one of Tokyo's largest facilities.
|
| 15.52 miles | Hyperscale Data Center Request Dataset | |
| 15.63 miles | @Tokyo Chuo Center (CC1 & CC2) |
|
| 15.66 miles | STT Tokyo 1 |
STT Tokyo 1 is the first of two buildings in STT GDC's data centre campus, supporting the demand for critical digital infrastructure in Japan.
|
| 15.68 miles | STT Tokyo 2 |
STT Tokyo 2 is the second of two buildings in STT GDC's data center campus
|
| 15.82 miles | Goodman: Shirakami |
The Shirakami Data Centre developed by Goodman Group is located in Inzai City, Chiba Prefecture, within the Goodman Business Park—a major data center cluster about 50 kilometers east of central Tokyo.
|
| 16.09 miles | MC Digital: Tokyo Connected Campus @ Inzai | |
| 16.22 miles | Equinix Tokyo TY11 | |
| 16.62 miles | Colt KVH Tokyo | |
| 16.65 miles | IDC Frontier: Tokyo Ariake |
Tokyo Ariake Data Center is located in Tokyo Waterfront City, which has been developed as "a disaster-resilient city".
|
| 16.68 miles | ESR Group: Ariake |
This will be the company's fourth data center in Japan and second in Tokyo. Construction is scheduled to begin in Q2 2026, with operations expected to start by the end of 2028.
|
| 16.69 miles | Carrier-Neutral Data Center Request Dataset |
Vantage plans another data center on 2.8 acres of land in Tokyo, Japan.
|
| 16.74 miles | Digital Edge: Shibuya (SDC) |
The facility was acquired in 2021 as part of Digital Edge's US$230 million (JPY26 billion) purchase of five data center assets from Itochu Techno-Solutions (CTC).
|
| 17.08 miles | AirTrunk Tokyo TOK1 |
AirTrunk’s first data centre in Japan, AirTrunk TOK1 in Inzai near Tokyo, officially opened its doors in November 2021.
|
| 17.10 miles | AirTrunk: TOK1 DC6 |
This planned facility is part of AirTrunk's Tokyo 1 campus in Japan.
|
| 17.12 miles | AirTrunk: TOK1 DC2 |
This facility is part of AirTrunk's Tokyo 1 campus in Japan.
|
| 17.14 miles | AirTrunk: TOK1 DC5 |
This planned facility is part of AirTrunk's Tokyo 1 campus in Japan.
|
| 17.15 miles | AirTrunk: TOK1 DC7 |
This planned facility is part of AirTrunk's Tokyo 1 campus in Japan.
|
| 17.18 miles | AirTrunk: TOK1 DC4 |
This planned facility is part of AirTrunk's Tokyo 1 campus in Japan.
|
| 17.18 miles | AirTrunk: TOK1 DC3 |
This facility is part of AirTrunk's Tokyo 1 campus in Japan.
|
| 17.33 miles | STACK TKY01 |
Stack Infrastructure completed their first Tokyo facility in 2024. The campus, situated in the Inzai District of Greater Tokyo, was developed collaboratively with IPI Partners and Oaktree Capital Management.
|
| 17.35 miles | STACK: TKY01B |
This facility is part of Stack Infrastructure's first campus in Tokyo, Japan.
|
| 17.55 miles | Telehouse: Tokyo Shibuya |
The data center in Shibuya is inside a 15-story high-rise tower and a four-story low-rise tower with a massive 15,000 m2 of dedicated floor space.
|
| 17.76 miles | Keppel DC: Tokyo 1 |
Keppel expanded its data center portfolio in July 2024 by purchasing an existing facility in Tokyo for JPY 23.4 billion (approximately $144.8 million).
|
| 17.76 miles | AT TOKYO Central Tokyo |
AT TOKYO’s 25 megawatts (MW) data center is located at the heart of Tokyo.
|
| 17.76 miles | NTT Tokyo No 11 | |
| 17.78 miles | Equinix TY15 |
TY15 is located about 1km from Equinix TY6/TY7/TY8 data centers. A direct fiber connection to TY2 just 1.5km away makes this new IBX data center a premier connectivity site in Tokyo. The facility has an initial capacity of 1,200 cabinets.
|
| 17.89 miles | Telecom Center Building | |
| 18.06 miles | Equinix Tokyo TY6 | |
| 18.09 miles | Hyperscale Data Center Request Dataset | |
| 18.12 miles | Equinix Tokyo TY7 | |
| 18.18 miles | Equinix Tokyo TY8 | |
| 18.38 miles | AT&T Tokyo NRT4 | |
| 18.43 miles | Equinix Tokyo TY2 |
October 27, 2025
Tokyo
October 18, 2025
Colt Data Centre Services
November 19, 2024
Colt Data Centre Services
April 17, 2024
Colt Data Centre Services
March 21, 2024
Colt Data Centre Services
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas