Colt Data Centre Services

In 2014, Colt entered the APAC region when it acquired KVH and its seven data centers in across Japan, Singapore, Hong Kong and South Korea.

Colt Data Centre Services Data Center Map

Colt Data Centre Services Power Growth Over Time

+62% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Colt Data Centre Services Locations

Colt Powergate

London

The Powergate data center is outside of the heart of the city but within zone 2, making the site easily accessible. This Colt tier III facility provides over 3,700m2 of data centre space and 15 MVA of power.

View Data Center

Colt: Minoh 1

Osaka

ESR Group and Colt Data Centre Services (Colt DCS) have formed a joint venture to develop the initial phase of a hyperscale data center in Minoh City, Osaka, Japan.

View Data Center

Colt: Villebon PAR2

Paris

Colt Paris 2, the first of three Colt data centers on the Villebon campus: a hyperscale building with hybrid air and liquid-to-chip cooling, under construction since May 2025 and fully let.

View Data Center

Colt: Les Ulis PAR5

Paris

Colt Paris 5, the larger of two planned Colt data centers on the Les Ulis 2 campus, designed for cloud and high-density AI workloads with hybrid air and liquid-to-chip cooling.

View Data Center

Colt: MUM1 DC6

Mumbai

The planned facility is part of Colt's Mumbai Campus in Digha, Navi Mumbai. Located in an industrial zone, the facility is positioned on the eastern side of the Thane Belapur road.

View Data Center

Colt: MUM1 DC1

Mumbai

In 2023, Colt DCS completed the first phase development of one of the largest data centres for Colt, a 120MW data centre offering a gross site area of 62,000m2 located in Navi Mumbai.

View Data Center

Colt Hong Kong HKDC1

Hong Kong

Colt Hong Kong Data Centre is capable of providing true 2N power redundancy with dual power feeds traversing through separate infrastructure to reach the racks. The facility is equipped with extensive security controls including biometric authentication systems, and also has emergency power supply with 24 hours of fuel storage available for cases of power outages.

View Data Center

Colt: MUM1 DC4

Mumbai

The planned facility is part of Colt's Mumbai Campus in Digha, Navi Mumbai. Located in an industrial zone, the facility is positioned on the eastern side of the Thane Belapur road.

View Data Center

Colt: MUM1 DC2

Mumbai

The facility is part of Colt's Mumbai Campus in Digha, Navi Mumbai. Located in an industrial zone, the facility is positioned on the eastern side of the Thane Belapur road.

View Data Center

Colt: MUM1 DC3

Mumbai

Third data center under construction at Colt DCS' Navi Mumbai campus, fully pre-let to an undisclosed hyperscale customer and designed for high-density deployments with hybrid air and liquid cooling.

View Data Center

Colt: MUM1 DC5

Mumbai

The planned facility is part of Colt's Mumbai Campus in Digha, Navi Mumbai. Located in an industrial zone, the facility is positioned on the eastern side of the Thane Belapur road.

View Data Center

Colt Data Centre Services Data Center Photos See all

Front Entrance
Source: Baxtel
Satellite Image of Colt's Facility in Frankfurt
Source: Baxtel
Colt Facility at 60 Rue de Wattignies
Source: Baxtel
Exterior of Colt Inzai 2
Source: Baxtel
Under Construction
Source: Baxtel
Rendering of Colt DCS Frankfurt West
Source: Baxtel
Rending of the facility
Source: Turner & Townsend
Aerial view of Colt Rotterdam Data Centre in Roosendaal, Netherlands
Source: Colt Data Centre Services

Related News See all

Read Colt DCS Breaks Ground on Berlin 1 Data Center, Due Online in 2028
> Colt Data Centre Services has started construction on Berlin 1, the first of two hyperscale data centers it plans east of Berlin. H&MV Engineering, the project's electrical contractor, announced ...

Colt DCS Breaks Ground on Berlin 1 Data Center, Due Online in 2028

November 10, 2026 Colt Data Centre Services

Colt Data Centre Services has started construction on Berlin 1, the first of two hyperscale data centers it plans east of Berlin. H&MV Engineering, the project's electrical contractor, announced the groundbreaking in a company post and is delivering a 110 kV G.I.S substation for the site....

Read more
Read Equinix Opens 8MW SG6 Data Center As Singapore's First Under Green Rules
[Equinix](https://baxtel.com/data-centers/equinix) opened SG6, its sixth data center in [Singapore](https://baxtel.com/regions/singapore), on Nov. 6 with 8MW of capacity in its first phase, the com...

Equinix Opens 8MW SG6 Data Center As Singapore's First Under Green Rules

November 09, 2026 Singapore

Equinix opened SG6, its sixth data center in Singapore, on Nov. 6 with 8MW of capacity in its first phase, the company announced. Equinix invested about $290 million in the nine-story building at Jalan Tukang in western Singapore. SG6 is the first data center in Singapore built under the...

Read more
Read L&T's Vyoma.AI Breaks Ground on 52MW Chennai Data Center
L&T's Vyoma.AI broke ground on a 52 MW data center near Chennai on October 28, expanding its Kancheepuram campus. Vyoma.AI is the integrated AI cloud and hyperscale data center business![thehindubu...

L&T's Vyoma.AI Breaks Ground on 52MW Chennai Data Center

October 31, 2026 Chennai

L&T's Vyoma.AI broke ground on a 52 MW data center near Chennai on October 28, expanding its Kancheepuram campus. Vyoma.AI is the integrated AI cloud and hyperscale data center business of Larsen & Toubro, and it marked the start of construction with a Bhoomi Pujan ceremony (L&T)....

Read more
Read NTT Data Adds AI Factories In Paris And Singapore, Bringing Total To Five
NTT Data has launched AI Factory GPU clusters in [Paris](https://baxtel.com/regions/paris) and [Singapore](https://baxtel.com/regions/singapore), expanding its network of AI evaluation environments...

NTT Data Adds AI Factories In Paris And Singapore, Bringing Total To Five

October 29, 2026 Paris

NTT Data has launched AI Factory GPU clusters in Paris and Singapore, expanding its network of AI evaluation environments to five sites. The company announced the expansion on October 27, and the new facilities join AI Factories in Plano, Texas, and Riyadh, Saudi Arabia. Data Center Dynamics...

Read more
Read STTGDC Secures JPY93 Billion Green Loan For 70.8MW Tokyo Campus
STTGDC has [secured a JPY93 billion green loan](https://www.sttgdc.com/newsroom/sttgdc-secures-jpy93-billion-green-loan-support-expansion-tokyo-data-centre-campus) to fit out the two buildings at i...

STTGDC Secures JPY93 Billion Green Loan For 70.8MW Tokyo Campus

October 27, 2026 Tokyo

STTGDC has secured a JPY93 billion green loan to fit out the two buildings at its 70.8MW data center campus in Inzai City, near Tokyo. The facility is worth about US$589.9 million, STTGDC said on Oct. 27. STTGDC develops, owns and operates both buildings. The company calls them TYO1 and TYO2, and...

Read more
Read ZTE Launches M8000 Micro-Module for AI Racks up to 250kW
ZTE launched the ZXEDC M8000 Intelligent Computing Micro-Module at Data Center World Asia in [Singapore](https://baxtel.com/regions/singapore), an integrated IT pod built for AI data centers. The [...

ZTE Launches M8000 Micro-Module for AI Racks up to 250kW

October 23, 2026 Singapore

ZTE launched the ZXEDC M8000 Intelligent Computing Micro-Module at Data Center World Asia in Singapore, an integrated IT pod built for AI data centers. The company announced the product in a release published Oct. 20 (ZTE). The module combines an enclosed cold aisle, liquid-cooled racks, network...

Read more

Documents See all

Get Quotes
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.