Equinix TY12x

Operational
Fully operational facility
Operated by:

Equinix TY12x

Year Built: 2021
░░░░ Request Dataset MW
Total Power
░░░░░░ Login to view SqFt
Gross Colocation Size

This facility is part of the Equinix GIC joint venture where GIC receives 80% stake for an investment amount whilst Equinix receives 20% and transfers TY12x and OS2x to the partnership.

  • Utility Feeders: 2
  • UPS Configuration: Block Redundant
  • UPS Redundancy: N+1
  • Standby Power Configuration: 9 x 3,900 kVA diesel generators
  • Standby Power Redundancy: N+1

Map and Nearby Locations

210-6
Equinix Sites
Nearby Facilities

Equinix TY12x Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Equinix TY12x

Distance Site About
0.03 miles Equinix: TY13x
Equinix opened a new hyperscale data center, TY13x, in Tokyo, Japan in 2023. The facility is located in the Inzai region, adjacent to the existing TY12x data center.
0.14 miles South PlazaInterested in this information?Contact us
0.25 miles Colt Inzai 4
Known as Inzai 4 and set on a site area of 8,750 sqm (94,185 sq ft), the facility is already 100 percent pre-let.
0.34 miles MC Digital Realty-Inazi (NRT10)
0.40 miles MC Digital Realty: NRT14
Digital Realty’s NRT14 is a 31MW data center at its Inzai campus near Tokyo, marking the third building in the development and bringing the site to ~104MW as an AI-optimized facility that became operational in April 2026.
0.43 miles MC Digital Realty (NRT12)
NRT12 is designed to offer high-density power of up to 70kW per rack
0.44 miles West CampusInterested in this information?Contact us
0.44 miles Metro CampusInterested in this information?Contact us
0.53 miles Colt Tokyo Inzai
The Colt campus in Chiba was opened in 2011 and hosts three facilities
0.54 miles Colt: Inzai 2
This facility is a part of Colt's Inzai campus in Tokyo.
0.55 miles Colt: Inzai 3
This facility is a part of Colt's Inzai campus in Tokyo.
0.65 miles Colt: Inzai 5
Colt is building Inzai 5 Campus on a 2.5 acre site in Chiba, Tokyo.
0.76 miles Goodman: Shirakami
The Shirakami Data Centre developed by Goodman Group is located in Inzai City, Chiba Prefecture, within the Goodman Business Park—a major data center cluster about 50 kilometers east of central Tokyo.
0.85 miles STT Tokyo 1
STT Tokyo 1 is the first of two buildings in STT GDC's data centre campus, supporting the demand for critical digital infrastructure in Japan.
0.91 miles RidgeInterested in this information?Contact us
0.97 miles STT Tokyo 2
STT Tokyo 2 is the second of two buildings in STT GDC's data center campus
1.29 miles Carrier-Neutral Data CenterInterested in this information?Contact us
This facility is part of ADA Infrastructure's Tokyo East Campus in Tokyo.
1.34 miles Carrier-Neutral Data CenterInterested in this information?Contact us
This facility is part of ADA Infrastructure's Tokyo East Campus in Tokyo.
1.38 miles ADA: Tokyo East 1
GLP's data center subsidiary, Ada Infrastructure, plans to build a data center campus in East Tokyo, Japan, consisting of three four-story data center buildings.
1.58 miles IIJ: Shiroi DCC
Japanese internet and data center company IIJ is expanding its Shiroi data center campus, situated east of Tokyo in Shiroi City, Chiba Prefecture.
1.61 miles IIJ: Shiroi Bldg 3
Dubbed "Phase 3," this expansion will add about 1,000 racks to Internet Initiative Japan Inc. (IIJ)'s Shiroi Campus.
1.61 miles IIJ: Shiroi Bldg 4
This facility will be part of Internet Initiative Japan Inc. (IIJ)'s Shiroi Campus.
1.65 miles IIJ: Shiroi Bldg 2
This facility, located within Internet Initiative Japan Inc. (IIJ)'s Shiroi Campus in Chiba Prefecture, provides space for 1,100 racks across 8,000 square meters (86,110 sq ft).
1.93 miles STACK TKY01
Stack Infrastructure completed their first Tokyo facility in 2024. The campus, situated in the Inzai District of Greater Tokyo, was developed collaboratively with IPI Partners and Oaktree Capital Management.
1.96 miles STACK: TKY01B
This facility is part of Stack Infrastructure's first campus in Tokyo, Japan.
1.96 miles AirTrunk: TOK1 DC6
This planned facility is part of AirTrunk's Tokyo 1 campus in Japan.
1.97 miles AirTrunk: TOK1 DC7
This planned facility is part of AirTrunk's Tokyo 1 campus in Japan.
2.00 miles AirTrunk: TOK1 DC5
This planned facility is part of AirTrunk's Tokyo 1 campus in Japan.
2.01 miles AirTrunk Tokyo TOK1
AirTrunk’s first data centre in Japan, AirTrunk TOK1 in Inzai near Tokyo, officially opened its doors in November 2021.
2.04 miles AirTrunk: TOK1 DC3
This facility is part of AirTrunk's Tokyo 1 campus in Japan.
2.05 miles AirTrunk: TOK1 DC2
This facility is part of AirTrunk's Tokyo 1 campus in Japan.
2.09 miles MC Digital: Tokyo Connected Campus @ Inzai
2.10 miles AirTrunk: TOK1 DC4
This planned facility is part of AirTrunk's Tokyo 1 campus in Japan.
3.97 miles NTT: Shiroi SHR1
The first data center on the campus, the Shiroi Data Center (SHR1) is expected to be completed by April 2027. The building will support AI, cloud computing, and the next generation of digital services.
4.26 miles ADA: Tokyo East 2
GLP's data center subsidiary, Ada Infrastructure, plans to build a data center campus in East Tokyo, consisting of six four-story data center buildings. The campus will feature an N+1 UPS distributed redundant and N+1 closed loop air-cooled chiller plant.
15.40 miles Colt: Yoshikawa B2
Colt Data Centre Services plans to develop Yoshikawa B2 data center, which is the second building of a 9.5-acre campus in Yoshikawa.
15.43 miles Colt: Yoshikawa B1
Colt Data Centre Services is developing Yoshikawa B1 data center, which is the first building of a 9.5-acre campus in Yoshikawa.
16.04 miles INAP Edogawa-ku
18.94 miles SoftBank: Tokyo 4
SoftBank Tokyo No. 4 provides a range of colocation services to businesses.
18.95 miles NTT TK9
19.05 miles NTT TK2
19.64 miles INAP Koto-ku
19.67 miles Empyrion: Tokyo JP1
The facility will be AI-ready, span 21,000 sqm across five floors, and will be Tier III carrier-neutral with secured power.
19.84 miles Flow Digital: TK8
This facility will be part of Flow Digital's Tokyo Data Center Campus.
19.89 miles Flow Digital: Tokyo TK7
APAC data center firm Flow Digital Infrastructure has started work on a new campus in Tokyo that will comprise two buildings—TK7 and TK8.

Equinix TY12x Data Center Photos See all

Rendering of TY12x "Hyperscale" facility
Source: Baxtel
Equinix cage door
Source: Baxtel

Operating Company

Operated by:

Equinix connects the world’s leading businesses to their customers, employees and partners inside the most interconnected data centers.

318
Facilities
84
Markets
2093MW
Megawatts

News See all

Read Equinix to Reuse Data Center Heat to Warm Homes in Milan
Equinix has partnered with Italian energy company A2A to recover waste heat from its data center campus in Settimo Milanese and feed it into Milan’s district heating network. Under the agreement, E...

Equinix to Reuse Data Center Heat to Warm Homes in Milan

July 10, 2026 Equinix

Equinix has partnered with Italian energy company A2A to recover waste heat from its data center campus in Settimo Milanese and feed it into Milan’s district heating network. Under the agreement, Equinix will design and operate the heat recovery system, while A2A will use four large-scale heat...

Read more
Read Equinix Trials Hydrogen Fuel Cell Technology at Data Center in Ireland
Equinix has launched its first trial of hydrogen fuel cell technology as a replacement for diesel backup generation at a data center in Ireland. Working with ESB and GeoPura, the company has deploy...

Equinix Trials Hydrogen Fuel Cell Technology at Data Center in Ireland

June 19, 2026 Equinix

Equinix has launched its first trial of hydrogen fuel cell technology as a replacement for diesel backup generation at a data center in Ireland. Working with ESB and GeoPura, the company has deployed two hydrogen-powered generators at its DB3 Data Center facility. The 12-week trial will support...

Read more
Read Equinix is Building its Fourth Data Center in Malaysia
Equinix is Building its Fourth Data Center in Malaysia

Equinix is Building its Fourth Data Center in Malaysia

May 12, 2026 Equinix

Equinix will build its fourth data center in Malaysia, KL2, in Kuala Lumpur. The US$190 million facility will house over 2,200 cabinets at full build-out, though its size and IT capacity were not disclosed. Equinix said the new data center will be located less than 1 km from its KL1 facility in...

Read more
Read Equinix Begins Construction on DB7x Data Center in Dublin
Equinix Begins Construction on DB7x Data Center in Dublin

Equinix Begins Construction on DB7x Data Center in Dublin

March 30, 2026 Equinix

Equinix has begun construction on a new $92 million data center in Dublin, Ireland. The DB7x facility will be located in Blanchardstown, near the company’s existing sites in the city. Equinix is allocating $78 million toward high-performance infrastructure for AI workloads and $14 million for its...

Read more
Read EuroCTP Selects Equinix's FR2 Data Center for Equity Trading Consildated Tape
EuroCTP Selects Equinix's FR2 Data Center for Equity Trading Consildated Tape

EuroCTP Selects Equinix's FR2 Data Center for Equity Trading Consildated Tape

January 29, 2026 Equinix

EuroCTP, a new provider of an EU real-time pre and post-trade Consolidated Tape (CT) for financial equity trades, has selected Equinix's FR2 data center to host its 'tape' in Frankfurt, Germany.“Equinix FR2 provides EuroCTP with the ideal foundation to drive growth, ensuring we can reliably meet...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?