Digital Edge: TY07

Latest Podcast 1-1 Kobunacho Chuou-ku Tokyo Japan 103-0024
Operational
Fully operational facility
Operated by:

Digital Edge: TY07

Short Code: TYO7
Year Built: 2025
PUE: 1.31
Floors: 8
░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░ Request Dataset MW
Operational Power

The facility is located less than 300m from the company’s existing TYO2 facility (formerly known as ComSpace I).

According to a Hulic release, the Digital Edge and Hulic companies have formed a joint venture known as DEH1 Co., Ltd for the development, known as the 'Kobunacho Project.' The joint venture will develop, own, and operate the new data center.

Building


  • Colocation space: 2,624 m² (28,239 ft²)
  • Data center capacity: 970 cabinets
  • Building type: Purpose-built, multi-tenant
  • Seismic/flood resistant design: Seismic isolation structure / Raised 1st floor level for counter measure of flood
  • Floor type: Non raised floor (3~6F), Raised floor (7F)
  • Floor load capacity: Total: 15 kN/m²
  • Ceiling height: 5.5m (slab to slab)

Power and Cooling


  • Power and Cooling Density: 5 kVA per cabinet
  • Utility Feeders: 3, same substations
  • UPS Configuration & Redundancy: N+1, parallel redundancy
  • Standby Power Configuration & Redundancy: N+1, 4,000kVA x 3 gas turbine generators
  • Fuel tank Back-up time: 24h
  • Designed PUE: Annual 1.31

Certifications


ISO 14001
ISO 27001
ISO 45001

Map and Nearby Locations

1-1 Kobunacho Chuou-ku Tokyo Japan 103-0024
Digital Edge DC Sites
Nearby Facilities

Digital Edge: TY07 Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Digital Edge: TY07

Distance Site
0.21 miles Digital Edge: Comspace II (TY03)
1.89 miles Digital Edge: Tokyo TY01
2.36 miles Digital Edge: Shibuya (SDC)
2.48 miles Equinix Tokyo TY9
2.51 miles Equinix Tokyo TY10
2.87 miles Digital Edge: Otemachi TYO2
2.97 miles Telehouse: Tokyo Shibuya
3.24 miles AT TOKYO Central Tokyo
3.24 miles NTT Tokyo No 11
3.25 miles Keppel DC: Tokyo 1
3.26 miles SoftBank: Tokyo No. 2
3.35 miles SoftBank: Tokyo Nihombashi
3.45 miles Marunouchi: Otemachi I
3.45 miles NEXTDC: TK1 Tokyo
3.53 miles KDDI Tokyo Otemachi
3.53 miles NTT Tokyo Otemachi Building
3.59 miles Equinix Tokyo TY4
3.59 miles Colt Ōtemachi
3.69 miles Marunouchi: Otemachi II
3.70 miles NTT TK1
3.72 miles Marunouchi
3.73 miles NTT DATA Otemachi
3.78 miles NTT Tokyo 5
3.89 miles NTT: Tokyo TKY12
3.94 miles NTT TK12
4.35 miles Colt KVH Tokyo
4.35 miles Digital Edge: Comspace I (TY02)
4.68 miles NTT TK6
4.78 miles NTT TK3
5.19 miles NTT TK4
5.26 miles SoftBank: Tokyo No. 5
5.26 miles TISI: Tokyo 4th DC (GDC Gotenyama)
5.29 miles AT&T Tokyo NRT4
5.41 miles Equinix TY15
5.65 miles Equinix Tokyo TY6
5.73 miles Equinix Tokyo TY7
5.76 miles Equinix Tokyo TY8
5.80 miles Metro PlazaInterested in this information?Contact us
5.91 miles TISI: Tokyo 1st DC
6.00 miles Equinix Tokyo TY2
6.02 miles @Tokyo Chuo Center (CC1 & CC2)
6.28 miles Equinix Tokyo TY3
6.37 miles Equinix Tokyo TY11
6.37 miles Equinix Tokyo TY5
6.42 miles BNPP AM Alts: Shinonome, Tokyo
6.54 miles Colt Shiohama
6.58 miles Empyrion: Tokyo JP1
6.58 miles Carrier-Neutral Data CenterInterested in this information?Contact us
6.64 miles INAP Koto-ku
6.68 miles ESR Group: Ariake
6.72 miles SoftBank: Tokyo Ariake
6.84 miles Flow Digital: Tokyo TK7
6.89 miles Flow Digital: TK8
6.97 miles Telecom Center Building
7.26 miles NTT TK9
7.35 miles NTT DATA Mitaka East (TK10)
7.37 miles NTT TK2
7.50 miles NTT Mitaka West
7.68 miles TISI: Tokyo 2nd DC (Mitaka)
7.76 miles MCC Mitaka: South Block
7.78 miles MCC Mitaka: North Block
7.82 miles SoftBank: Tokyo 4
8.48 miles Deft: Tokyo TY1
8.67 miles INAP Heiwajima Ota-ku
8.67 miles Equinix Tokyo TY1
9.32 miles INAP Edogawa-ku
9.32 miles Canon Nishi-Tokyo
9.52 miles CloudInterested in this information?Contact us
10.42 miles ESR Group: Higashikurume
10.84 miles SKYY: Kawasaki Shin-Ogura
10.99 miles NTT TK8
11.59 miles NTT Yokohama 1
13.12 miles DayOne: Fuchu Intelligent Park
13.12 miles SoftBank: Tokyo Fuchu
13.13 miles Telehouse: Tokyo Fuchu
13.81 miles Digital Edge: Yokohama TY06
13.86 miles Digital Edge: Yokohama TY04
13.91 miles Digital Edge: Yokohama TY05
14.83 miles Colt: Yoshikawa B2
14.89 miles Colt: Yoshikawa B1
15.10 miles Mapletree: Tama-shi
15.55 miles Mitsui: Kanagawa
16.34 miles SoftBank: Kanagawa Yokohama
16.72 miles Telehouse: Tokyo Tama 5
17.38 miles Princeton PDG TY1 DC2
17.40 miles Princeton PDG TY1 DC1
17.60 miles ADA: TKW1 DC3
17.65 miles ADA: TKW1 DC2
17.69 miles ADA: TKW1 DC1
17.71 miles I-NET: Annex, Tokyo
17.80 miles Telehouse: Tokyo Tama 2
17.84 miles Telehouse Tokyo Tama 3
17.85 miles Telehouse: Tokyo Tama 1
17.85 miles MetroInterested in this information?Contact us
18.79 miles ADA: Tokyo West 2

Digital Edge: TY07 Data Center Photos See all

Rendering of the new TY07 site
Source: Digital Edge DC

Operating Company

Operated by:
0
Facilities
0
Markets

News See all

Read STTGDC Secures JPY93 Billion Green Loan For 70.8MW Tokyo Campus
STTGDC has [secured a JPY93 billion green loan](https://www.sttgdc.com/newsroom/sttgdc-secures-jpy93-billion-green-loan-support-expansion-tokyo-data-centre-campus) to fit out the two buildings at i...

STTGDC Secures JPY93 Billion Green Loan For 70.8MW Tokyo Campus

October 27, 2026 ST Telemedia Global Data Centres (STT GDC)

STTGDC has secured a JPY93 billion green loan to fit out the two buildings at its 70.8MW data center campus in Inzai City, near Tokyo. The facility is worth about US$589.9 million, STTGDC said on Oct. 27. STTGDC develops, owns and operates both buildings. The company calls them TYO1 and TYO2, and...

Read more
Read Digital Edge Plans 270MWV Data Center Campus Near Mumbai
APAC data center provider Digital Edge is reportedly planning a 270MW data center development near Mumbai, India.According to *The Economic Times*, citing a person familiar with the project, the co...

Digital Edge Plans 270MWV Data Center Campus Near Mumbai

July 06, 2026 Digital Edge DC

APAC data center provider Digital Edge is reportedly planning a 270MW data center development near Mumbai, India.According to The Economic Times, citing a person familiar with the project, the company acquired an approximately 30-acre parcel at the proposed Green Integrated Data Centre Park in...

Read more
Read Digital Edge Secures Land in Seoul for New 60MW Data Center
Digital Edge is expanding in South Korea with the acquisition of a powered land parcel in Ansan, near Seoul. Backed by a 90MVA power agreement, the site will host SEL5, a planned 60MW data center. ...

Digital Edge Secures Land in Seoul for New 60MW Data Center

June 08, 2026 Digital Edge DC

Digital Edge is expanding in South Korea with the acquisition of a powered land parcel in Ansan, near Seoul. Backed by a 90MVA power agreement, the site will host SEL5, a planned 60MW data center. The facility will feature dual-feed power from two independent 154kV substations and support...

Read more
Read Digital Edge Reaches Topping-Out Milestone for First Data Center Near Jakarta
Digital Edge Reaches Topping-Out Milestone for First Data Center Near Jakarta

Digital Edge Reaches Topping-Out Milestone for First Data Center Near Jakarta

May 30, 2026 Digital Edge DC

Asia-Pacific data center operator Digital Edge has reached a major construction milestone with the topping out of the first facility at its new campus near Jakarta, Indonesia. The company announced the completion of the structural framework for CGK1, the inaugural building within its CGK Campus...

Read more
Read Digital Edge Raises $575 Million to Expand APAC Data Centers
Digital Edge Raises $575 Million to Expand APAC Data Centers

Digital Edge Raises $575 Million to Expand APAC Data Centers

May 26, 2026 Digital Edge DC

APAC data center firm Digital Edge has secured new debt financing. The company last week announced the successful closing of its inaugural $575 million holding company (HoldCo) financing. Proceeds from the facility will support the continued expansion of the company’s campus footprints across...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Documents See all

Get Quotes
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.