Equinix Begins Construction on DB7x Data Center in Dublin
March 30, 2026
Equinix
| Distance | Site | About |
|---|---|---|
| 0.47 miles | IDC Frontier: Tokyo Ariake |
Tokyo Ariake Data Center is located in Tokyo Waterfront City, which has been developed as "a disaster-resilient city".
|
| 0.47 miles | ESR Group: Ariake |
This will be the company's fourth data center in Japan and second in Tokyo. Construction is scheduled to begin in Q2 2026, with operations expected to start by the end of 2028.
|
| 0.47 miles | Carrier-Neutral Data Center Request Dataset |
Vantage plans another data center on 2.8 acres of land in Tokyo, Japan.
|
| 0.61 miles | @Tokyo Chuo Center (CC1 & CC2) |
|
| 0.78 miles | SKYY: Koto City |
In 2020, AXA IM's data center division acquired a data center in Tokyo's Kota Ward for ¥22bn ($211m). The facility, built by SKYY Developments, spans 20,000 sq m (215,000 sq ft) and houses 2,560 data racks, making it one of Tokyo's largest facilities.
|
| 1.27 miles | Equinix Tokyo TY5 | |
| 1.33 miles | Equinix Tokyo TY3 | |
| 1.69 miles | Telecom Center Building | |
| 2.00 miles | Colt Shiohama |
|
| 2.24 miles | Flow Digital: Tokyo TK7 |
APAC data center firm Flow Digital Infrastructure has started work on a new campus in Tokyo that will comprise two buildings—TK7 and TK8.
|
| 2.28 miles | Flow Digital: TK8 |
This facility will be part of Flow Digital's Tokyo Data Center Campus.
|
| 2.49 miles | Colt KVH Tokyo | |
| 2.50 miles | NTT TK3 | |
| 2.60 miles | Equinix TY15 |
TY15 is located about 1km from Equinix TY6/TY7/TY8 data centers. A direct fiber connection to TY2 just 1.5km away makes this new IBX data center a premier connectivity site in Tokyo. The facility has an initial capacity of 1,200 cabinets.
|
| 2.64 miles | Hyperscale Data Center Request Dataset | |
| 2.67 miles | Empyrion: Tokyo JP1 |
The facility will be AI-ready, span 21,000 sqm across five floors, and will be Tier III carrier-neutral with secured power.
|
| 2.68 miles | INAP Koto-ku | |
| 2.70 miles | NTT TK4 | |
| 2.74 miles | Equinix Tokyo TY6 | |
| 2.75 miles | Equinix Tokyo TY7 | |
| 2.80 miles | Equinix Tokyo TY8 | |
| 2.93 miles | Equinix Tokyo TY2 | |
| 3.00 miles | Marunouchi | |
| 3.06 miles | IDC Frontier: Tokyo Nihombashi |
|
| 3.06 miles | NTT TK2 | |
| 3.07 miles | SoftBank: Tokyo 4 |
SoftBank Tokyo No. 4 provides a range of colocation services to businesses.
|
| 3.24 miles | NTT TK9 | |
| 3.38 miles | Digital Edge: Comspace I (TY02) |
Located next to Otemachi – the telecommunications hub of Tokyo – TYO2 is one of the most network dense carrier neutral data centers in the downtown area with access to significant dark fiber capacity.
|
| 3.48 miles | NTT DATA Otemachi | |
| 3.49 miles | Marunouchi: Otemachi II | |
| 3.50 miles | Digital Edge: Otemachi TYO2 |
The facility was acquired in 2021 as part of Digital Edge's US$230 million (JPY26 billion) purchase of five data center assets from Itochu Techno-Solutions (CTC).
|
| 3.56 miles | AT&T Tokyo NRT4 | |
| 3.60 miles | NTT TK1 | |
| 3.63 miles | Colt Ōtemachi |
Colt Tokyo Otemachi Data Centre is located in Tokyo’s central business district
|
| 3.66 miles | NTT Tokyo Otemachi Building | |
| 3.66 miles | KDDI Tokyo Otemachi |
|
| 3.67 miles | Equinix Tokyo TY4 | |
| 3.70 miles | Marunouchi: Otemachi I | |
| 4.34 miles | NTT TK12 | |
| 4.70 miles | NTT Tokyo 5 |
The facility is a 1-hour drive from Narita International Airport, and a 2-minute walk from the nearest train station
|
| 4.90 miles | Deft: Tokyo TY1 | |
| 5.01 miles | INAP Heiwajima Ota-ku | |
| 5.01 miles | Equinix Tokyo TY1 | |
| 5.20 miles | Digital Edge: Shibuya (SDC) |
The facility was acquired in 2021 as part of Digital Edge's US$230 million (JPY26 billion) purchase of five data center assets from Itochu Techno-Solutions (CTC).
|
| 5.43 miles | Equinix Tokyo TY10 | |
| 5.49 miles | Equinix Tokyo TY9 | |
| 5.70 miles | Telehouse: Tokyo Shibuya |
The data center in Shibuya is inside a 15-story high-rise tower and a four-story low-rise tower with a massive 15,000 m2 of dedicated floor space.
|
| 6.14 miles | Digital Edge: Tokyo TY01 |
The center is located in the Musashino plateau (Musashino gravel), built on an extremely Solid ground, resistant to natural and human disasters. Public-sector studies also affirm The location's disaster-resistance.
|
| 6.29 miles | INAP Edogawa-ku | |
| 6.30 miles | Digital Edge: Comspace II (TY03) |
TYO3 is conveniently located in the vibrant business district of Shinjuku with easy access to major transport
links. |
| 6.37 miles | Digital Edge: TYO7 |
The facility is located less than 300m from the company’s existing TYO2 facility (formerly known as ComSpace I).
|
| 7.03 miles | NTT TK6 | |
| 8.36 miles | NTT Tokyo No 11 | |
| 8.36 miles | AT TOKYO Central Tokyo |
AT TOKYO’s 25 megawatts (MW) data center is located at the heart of Tokyo.
|
| 8.38 miles | Keppel DC: Tokyo 1 |
Keppel expanded its data center portfolio in July 2024 by purchasing an existing facility in Tokyo for JPY 23.4 billion (approximately $144.8 million).
|
| 12.80 miles | NTT DATA Mitaka East (TK10) | |
| 12.95 miles | NTT Mitaka West | |
| 12.97 miles | NTT Yokohama 1 |
|
| 13.16 miles | MCC Mitaka: South Block | |
| 13.17 miles | MCC Mitaka: North Block | |
| 13.60 miles | NTT TK8 | |
| 14.75 miles | Mitsui: Kanagawa |
Mitsui & Co., a Japanese conglomerate, invested ¥18 billion (approximately $121 million) to acquire a hyperscale data center.
|
| 14.95 miles | Digital Edge: Yokohama TY06 |
The TY06 (YCC North) facility is one of three buildings that make up Digital Edge's Yokohama Computer Center (YCC). The campus is located in Tsuzuki-ku, Yokohama, positioned 5.5 miles (9 kilometers) inland from Tokyo Bay.
|
| 15.00 miles | Digital Edge: Yokohama TY04 |
Digital Edge's Yokohama Computer Center (YCC) is situated in Tsuzuki-ku, Yokohama, approximately 5.5 miles (9 kilometers) inland from Tokyo Bay. The campus comprises three buildings.
|
| 15.04 miles | IDC Frontier: Kanagawa Yokohama |
|
| 15.07 miles | Digital Edge: Yokohama TY05 |
The TY05 (YCC East) facility is one of three buildings that make up Digital Edge's Yokohama Computer Center (YCC). The campus is located in Tsuzuki-ku, Yokohama, positioned 5.5 miles (9 kilometers) inland from Tokyo Bay.
|
| 15.37 miles | Canon Nishi-Tokyo | |
| 15.41 miles | Hyperscale Data Center Request Dataset | |
| 16.22 miles | Colt: Yoshikawa B2 |
Colt Data Centre Services plans to develop Yoshikawa B2 data center, which is the second building of a 9.5-acre campus in Yoshikawa.
|
| 16.29 miles | Colt: Yoshikawa B1 |
Colt Data Centre Services is developing Yoshikawa B1 data center, which is the first building of a 9.5-acre campus in Yoshikawa.
|
| 16.59 miles | ESR Group: Higashikurume |
The company acquired a site in Higashikurume, Tokyo, which previously housed three office buildings across 20,900 square meters (225,000 square feet).
|
| 17.76 miles | ADA: Tokyo East 2 |
GLP's data center subsidiary, Ada Infrastructure, plans to build a data center campus in East Tokyo, consisting of six four-story data center buildings. The campus will feature an N+1 UPS distributed redundant and N+1 closed loop air-cooled chiller plant.
|
| 18.16 miles | NTT: Shiroi SHR1 |
The first data center on the campus, the Shiroi Data Center (SHR1) is expected to be completed by April 2027. The building will support AI, cloud computing, and the next generation of digital services.
|
| 18.24 miles | IDC Frontier: Tokyo Fuchu |
The facility has a gross floor area of 45,419 square meters and contains approximately 4,000 racks.
|
| 18.26 miles | DayOne: Fuchu Intelligent Park |
The plots cover a total area of 10,970 square meters (118,080 square feet), and the first phase is scheduled to begin operations in late 2026.
|
| 18.31 miles | Telehouse: Tokyo Fuchu |
The Telehouse Fuchu data center features earthquake-resistant construction on solid ground.
|
| 19.42 miles | Mapletree: Tama-shi |
Mapletree Industrial Trust has acquired a 98.47 percent stake in a Tokyo mixed-use property through a JPY14.5 billion ($99.5 million) deal with Nagayama Tokutei Mokuteki Kaisha.
|
| 19.93 miles | Hyperscale Data Center Request Dataset |
March 30, 2026
Equinix
January 29, 2026
Equinix
January 26, 2026
Equinix
December 19, 2025
Equinix
December 06, 2025
Equinix
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas