Telehouse: Tokyo Tama 5

Operational
Fully operational facility
Operated by:

Telehouse: Tokyo Tama 5

Year Built: 2020
Floors: 14
░░░░ Request Dataset MW
Operational Power
░░░░░░ Interested in this information? Contact us SqFt
Gross Colocation Size

KDDI's Tama 5 data center, which opened in July 2020, spans 14 stories and can accommodate 1,500 racks. The building includes a dedicated floor housing KDDI's network monitoring center, relocated from Shinjuku.

Map and Nearby Locations

Japan ( 〒206-0034 Tokyo, Tsurumaki, 3 Chome−5 )
KDDI Sites
Nearby Facilities

Telehouse: Tokyo Tama 5 Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Telehouse: Tokyo Tama 5

Distance Site About
0.89 miles ADA: TKW1 DC3
Ada Infrastructure has broken ground on the third and final data center building at its Tokyo West 1 campus in Tama, western Tokyo.
0.94 miles ADA: TKW1 DC2
In May 2024, Ada Infrastructure started construction on a second building at its Tokyo West campus in Japan.
0.98 miles ADA: TKW1 DC1
The campus will comprise three buildings, with Building 1 being a three-story facility spanning 8,700 square meters (93,650 square feet) on a 3,400-square-meter (36,600-square-foot) site.
1.12 miles Telehouse: Tokyo Tama 2
KDDI opened its second building at Telehouse Tokyo Tama in 2013, expanding its suburban data center campus.
1.16 miles Telehouse Tokyo Tama 3
1.18 miles Telehouse: Tokyo Tama 1
KDDI's Tama Campus, which opened in 2008, consists of three data center buildings with a total capacity of 4,300 racks.
1.18 miles Edge PlazaInterested in this information?Contact us
1.62 miles Mapletree: Tama-shi
Mapletree Industrial Trust has acquired a 98.47 percent stake in a Tokyo mixed-use property through a JPY14.5 billion ($99.5 million) deal with Nagayama Tokutei Mokuteki Kaisha.
3.95 miles Goldman Sachs: Tokyo HND1
4.26 miles Vantage Tokyo (HND1)
Located in Sagamihara, the Tokyo campus will be comprised of 300,000 square feet (28,000 square meters) and will feature three multi-story, earthquake resistant facilities.
4.73 miles SoftBank: Tokyo Fuchu
Seismically isolated SoftBank data center in Fuchu, western Tokyo, with about 4,000 racks across 25 server rooms.
4.79 miles DayOne: Fuchu Intelligent Park
The plots cover a total area of 10,970 square meters (118,080 square feet), and the first phase is scheduled to begin operations in late 2026.
4.90 miles Telehouse: Tokyo Fuchu
The Telehouse Fuchu data center features earthquake-resistant construction on solid ground.
5.04 miles NEC: Kanagawa 2
This facility is a part of NEC's Kanagawa Data Center Campus in Japan. The facility can handle densities of more than 20kW per rack.
5.11 miles NEC: Sagamihara, Kanagawa
The first building of NEC's Kanagawa Data Center Campus was opened in January 2014 and hosts 3,000 racks.
7.56 miles ADA: Tokyo West 2
GLP's data center subsidiary, Ada Infrastructure, plans to build a massive data center campus in West Tokyo, Japan, consisting of eight five-story buildings.
8.12 miles NTT TK8
9.30 miles MCC Mitaka: North Block
9.32 miles MCC Mitaka: South Block
9.32 miles North ValleyInterested in this information?Contact us
9.39 miles TISI: Tokyo 2nd DC (Mitaka)
TISI data center space inside MC Digital Realty's Mitaka campus in western Tokyo, opened in 2015.
9.61 miles NTT Mitaka West
9.73 miles NTT DATA Mitaka East (TK10)
9.92 miles Digital Edge: Yokohama TY05
The TY05 (YCC East) facility is one of three buildings that make up Digital Edge's Yokohama Computer Center (YCC). The campus is located in Tsuzuki-ku, Yokohama, positioned 5.5 miles (9 kilometers) inland from Tokyo Bay.
9.97 miles Digital Edge: Yokohama TY04
Digital Edge's Yokohama Computer Center (YCC) is situated in Tsuzuki-ku, Yokohama, approximately 5.5 miles (9 kilometers) inland from Tokyo Bay. The campus comprises three buildings.
9.99 miles Digital Edge: Yokohama TY06
The TY06 (YCC North) facility is one of three buildings that make up Digital Edge's Yokohama Computer Center (YCC). The campus is located in Tsuzuki-ku, Yokohama, positioned 5.5 miles (9 kilometers) inland from Tokyo Bay.
10.14 miles NTT Yokohama 1
10.17 miles Canon Nishi-Tokyo
10.62 miles ESR Group: Higashikurume
The company acquired a site in Higashikurume, Tokyo, which previously housed three office buildings across 20,900 square meters (225,000 square feet).
10.80 miles Goodman: Sagamihara
Australian real estate firm Goodman Group is planning a new data center campus in Sagamihara City, Kanagawa Prefecture, just outside Tokyo.
12.21 miles Hyperscale Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.11 miles AirTrunk Tokyo TOK2
The campus spans 4.6 hectares and aims to achieve a Power Usage Effectiveness (PUE) of 1.15. The project's development is supported through green financing.
13.11 miles AirTrunk: TOK2 DC2
AirTrunk first revealed plans for the TOK2 campus in May 2022 and began construction on the initial building in November 2022. The company topped out the second phase in 2024.
13.50 miles Keppel DC: Tokyo 1
Keppel expanded its data center portfolio in July 2024 by purchasing an existing facility in Tokyo for JPY 23.4 billion (approximately $144.8 million).
13.51 miles AT TOKYO Central Tokyo
AT TOKYO’s 25 megawatts (MW) data center is located at the heart of Tokyo.
13.51 miles NTT Tokyo No 11
14.49 miles Mitsui: Kanagawa
Mitsui & Co., a Japanese conglomerate, invested ¥18 billion (approximately $121 million) to acquire a hyperscale data center.
15.25 miles I-NET: DC2 Kamiyabe
The second and larger of I-NET Corp.'s two inet primary buildings in Totsuka Ward, Yokohama, commissioned in 2013 to expand the company's flagship campus in response to growing managed cloud and colocation demand.
15.49 miles Telehouse: Tokyo Shibuya
The data center in Shibuya is inside a 15-story high-rise tower and a four-story low-rise tower with a massive 15,000 m2 of dedicated floor space.
15.79 miles SoftBank: Kanagawa Yokohama
16.21 miles Digital Edge: Shibuya (SDC)
The facility was acquired in 2021 as part of Digital Edge's US$230 million (JPY26 billion) purchase of five data center assets from Itochu Techno-Solutions (CTC).
16.55 miles I-NET: DC1 Maioka
I-NET Corp.'s flagship data center campus in Totsuka Ward, Yokohama, comprising two purpose-built buildings operated since 2009 and 2013 as the core hub of the company's nationwide managed cloud and colocation network.
16.72 miles Digital Edge: TY07
The facility is located less than 300m from the company’s existing TYO2 facility (formerly known as ComSpace I).
16.93 miles Digital Edge: Comspace II (TY03)
TYO3 is conveniently located in the vibrant business district of Shinjuku with easy access to major transport
links.
17.47 miles I-NET: Annex, Tokyo
The I-NET Annex is a high-density, carrier-neutral facility in Yokohama designed to support AI processing and hybrid cloud environments.
17.55 miles AT&T Tokyo NRT4
17.58 miles TISI: Tokyo 4th DC (GDC Gotenyama)
TISI's dedicated data center building in Kita-Shinagawa, Tokyo, opened in 2011 as GDC Gotenyama and now marketed as Tokyo 4th DC under the EINS WAVE brand.
17.58 miles SoftBank: Tokyo No. 5
SoftBank data center on leased floors of the Gotenyama SH Building in Kita-Shinagawa, Tokyo, in service since 2013.
18.37 miles Digital Edge: Otemachi TYO2
The facility was acquired in 2021 as part of Digital Edge's US$230 million (JPY26 billion) purchase of five data center assets from Itochu Techno-Solutions (CTC).
18.41 miles NEXTDC: TK1 Tokyo
NEXTDC are poised to expand their leading design, construction and operations of data facilities into Tokyo, Japan.
18.44 miles Equinix Tokyo TY8
18.44 miles Equinix Tokyo TY6
18.44 miles Equinix Tokyo TY2
18.46 miles Equinix Tokyo TY7
18.47 miles Equinix TY15
TY15 is located about 1km from Equinix TY6/TY7/TY8 data centers. A direct fiber connection to TY2 just 1.5km away makes this new IBX data center a premier connectivity site in Tokyo. The facility has an initial capacity of 1,200 cabinets.
18.52 miles Digital Edge: Tokyo TY01
The center is located in the Musashino plateau (Musashino gravel), built on an extremely Solid ground, resistant to natural and human disasters. Public-sector studies also affirm The location's disaster-resistance.
18.54 miles Colt KVH Tokyo
18.60 miles Global PlazaInterested in this information?Contact us
18.64 miles Deft: Tokyo TY1
18.73 miles SoftBank: Tokyo No. 2
SoftBank data center in Toshima Ward, Tokyo, in service since 2001.
18.75 miles INAP Heiwajima Ota-ku
18.75 miles Equinix Tokyo TY1
19.07 miles SoftBank: Tokyo Nihombashi
SoftBank interconnection data center near Tokyo's Otemachi and Marunouchi business districts.
19.18 miles Plaza BetaInterested in this information?Contact us
19.20 miles Equinix Tokyo TY9
19.23 miles Equinix Tokyo TY10
19.75 miles Marunouchi
19.84 miles Marunouchi: Otemachi I
19.91 miles KDDI Tokyo Otemachi
19.91 miles NTT Tokyo Otemachi Building
19.98 miles Colt Ōtemachi
Colt Tokyo Otemachi Data Centre is located in Tokyo’s central business district
20.00 miles Equinix Tokyo TY4

Operating Company

Operated by:

KDDI Corporation is a Japanese telecommunications operator formed in October 1, 2000 through the merger of DDI Corp., KDD Corp., and IDO Corp.

0
Facilities
0
Markets

News See all

Read Telehouse And KDDI Close £220M Purchase Of East India Dock Campus
Telehouse and its parent KDDI have completed the purchase of the Inventory Estate in East India Dock, London, for more than £220 million. The sellers are LaSalle Investment Management and Trilogy R...

Telehouse And KDDI Close £220M Purchase Of East India Dock Campus

October 29, 2026 Telehouse

Telehouse and its parent KDDI have completed the purchase of the Inventory Estate in East India Dock, London, for more than £220 million. The sellers are LaSalle Investment Management and Trilogy Real Estate, and the deal values the campus at US$294 million, Telehouse said. Telehouse says 65 MVA...

Read more
Read STTGDC Secures JPY93 Billion Green Loan For 70.8MW Tokyo Campus
STTGDC has [secured a JPY93 billion green loan](https://www.sttgdc.com/newsroom/sttgdc-secures-jpy93-billion-green-loan-support-expansion-tokyo-data-centre-campus) to fit out the two buildings at i...

STTGDC Secures JPY93 Billion Green Loan For 70.8MW Tokyo Campus

October 27, 2026 ST Telemedia Global Data Centres (STT GDC)

STTGDC has secured a JPY93 billion green loan to fit out the two buildings at its 70.8MW data center campus in Inzai City, near Tokyo. The facility is worth about US$589.9 million, STTGDC said on Oct. 27. STTGDC develops, owns and operates both buildings. The company calls them TYO1 and TYO2, and...

Read more
Read KDDI Launches Data Center in Osaka, Japan
KDDI Launches Data Center in Osaka, Japan

KDDI Launches Data Center in Osaka, Japan

January 24, 2026 KDDI

Japanese telecoms firm KKDI has launched the first phase of a new data center in Osaka. The company this week announced that operations at the Osaka Sakai Data Center, located near the Osaka metropolitan area, started on January 22.The four-story facility, totaling 57,000 sqm (613,542 sq ft), is...

Read more
Read Stack Secures Green Financing for Data Center in Tokyo
Stack Secures Green Financing for Data Center in Tokyo

Stack Secures Green Financing for Data Center in Tokyo

October 27, 2025 Tokyo

Stack Infrastructure has secured a 39.7 billion yen ($247.7m) green financing package to develop its data center campus in Japan's capital, Tokyo. The first stage of the 36MW TKY01 campus in Inzai, Greater Tokyo, is set to come online next year, offering 18MW, with the additional capacity set...

Read more
Read Toyota looks to sell KDDI shares worth $1.8 billion
Toyota looks to sell KDDI shares worth $1.8 billion

Toyota looks to sell KDDI shares worth $1.8 billion

August 01, 2023 KDDI

Toyota Motor Corporation intends to sell a roughly $1.80 billion stake in KDDI Corporation as part of a share buy-back deal. Reuters reports that the Japanese automaker wants to raise funds to accelerate vehicle electrification. Toyota's stake in the Japanese telco would decrease from 14.68...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.