|
2.11 miles
|
Digital Edge: Tokyo TY01
|
The center is located in the Musashino plateau (Musashino gravel), built on an extremely Solid ground, resistant to natural and human disasters. Public-sector studies also affirm The location's disaster-resistance.
|
|
2.69 miles
|
Equinix Tokyo TY9
|
|
|
2.73 miles
|
NTT TK6
|
|
|
2.75 miles
|
Equinix Tokyo TY10
|
|
|
3.10 miles
|
Digital Edge: Comspace II (TY03)
|
TYO3 is conveniently located in the vibrant business district of Shinjuku with easy access to major transport
links.
|
|
3.26 miles
|
Digital Edge: TY07
|
The facility is located less than 300m from the company’s existing TYO2 facility (formerly known as ComSpace I).
|
|
3.81 miles
|
NTT Tokyo 5
|
The facility is a 1-hour drive from Narita International Airport, and a 2-minute walk from the nearest train station
|
|
4.17 miles
|
NTT TK12
|
|
|
4.50 miles
|
Marunouchi: Otemachi I
|
|
|
4.54 miles
|
NTT Tokyo Otemachi Building
|
|
|
4.54 miles
|
KDDI Tokyo Otemachi
|
|
|
4.55 miles
|
Equinix Tokyo TY4
|
|
|
4.58 miles
|
Colt Ōtemachi
|
Colt Tokyo Otemachi Data Centre is located in Tokyo’s central business district
|
|
4.64 miles
|
NTT TK1
|
|
|
4.72 miles
|
Marunouchi: Otemachi II
|
|
|
4.74 miles
|
NTT DATA Otemachi
|
|
|
5.08 miles
|
Digital Edge: Comspace I (TY02)
|
Located next to Otemachi – the telecommunications hub of Tokyo – TYO2 is one of the most network dense carrier neutral data centers in the downtown area with access to significant dark fiber capacity.
|
|
5.10 miles
|
NTT: Tokyo TKY12
|
NTT Global Data Centers is developing the TKY12 hyperscale data center campus in the Inzai–Shiroi area of Chiba Prefecture outside Tokyo, Japan.
|
|
5.18 miles
|
Marunouchi
|
|
|
5.18 miles
|
Digital Edge: Otemachi TYO2
|
The facility was acquired in 2021 as part of Digital Edge's US$230 million (JPY26 billion) purchase of five data center assets from Itochu Techno-Solutions (CTC).
|
|
5.27 miles
|
SoftBank: Tokyo Nihombashi
|
SoftBank interconnection data center near Tokyo's Otemachi and Marunouchi business districts.
|
|
5.55 miles
|
Digital Edge: Shibuya (SDC)
|
The facility was acquired in 2021 as part of Digital Edge's US$230 million (JPY26 billion) purchase of five data center assets from Itochu Techno-Solutions (CTC).
|
|
5.87 miles
|
NEXTDC: TK1 Tokyo
|
NEXTDC are poised to expand their leading design, construction and operations of data facilities into Tokyo, Japan.
|
|
5.88 miles
|
NTT TK3
|
|
|
5.90 miles
|
Keppel DC: Tokyo 1
|
Keppel expanded its data center portfolio in July 2024 by purchasing an existing facility in Tokyo for JPY 23.4 billion (approximately $144.8 million).
|
|
5.90 miles
|
NTT Tokyo No 11
|
|
|
5.90 miles
|
AT TOKYO Central Tokyo
|
AT TOKYO’s 25 megawatts (MW) data center is located at the heart of Tokyo.
|
|
6.03 miles
|
NTT TK4
|
|
|
6.22 miles
|
Telehouse: Tokyo Shibuya
|
The data center in Shibuya is inside a 15-story high-rise tower and a four-story low-rise tower with a massive 15,000 m2 of dedicated floor space.
|
|
6.85 miles
|
Colt KVH Tokyo
|
|
|
7.28 miles
|
Empyrion: Tokyo JP1
|
The facility will be AI-ready, span 21,000 sqm across five floors, and will be Tier III carrier-neutral with secured power.
|
|
7.32 miles
|
INAP Koto-ku
|
|
|
7.53 miles
|
Colt Shiohama
|
|
|
7.57 miles
|
Equinix Tokyo TY3
|
|
|
7.58 miles
|
TISI: Tokyo 1st DC
|
TISI data center space in Toyosu, Koto Ward, Tokyo, marketed as Tokyo 1st DC.
|
|
7.66 miles
|
@Tokyo Chuo Center (CC1 & CC2)
|
|
|
7.67 miles
|
Equinix Tokyo TY5
|
|
|
7.73 miles
|
Flow Digital: Tokyo TK7
|
APAC data center firm Flow Digital Infrastructure has started work on a new campus in Tokyo that will comprise two buildings—TK7 and TK8.
|
|
7.73 miles
|
NTT TK9
|
|
|
7.77 miles
|
Flow Digital: TK8
|
This facility will be part of Flow Digital's Tokyo Data Center Campus.
|
|
7.92 miles
|
SKYY: Koto City
|
In 2020, AXA IM's data center division acquired a data center in Tokyo's Kota Ward for ¥22bn ($211m). The facility, built by SKYY Developments, spans 20,000 sq m (215,000 sq ft) and houses 2,560 data racks, making it one of Tokyo's largest facilities.
|
|
7.95 miles
|
NTT TK2
|
|
|
8.07 miles
|
Equinix TY15
|
TY15 is located about 1km from Equinix TY6/TY7/TY8 data centers. A direct fiber connection to TY2 just 1.5km away makes this new IBX data center a premier connectivity site in Tokyo. The facility has an initial capacity of 1,200 cabinets.
|
|
8.16 miles
|
SoftBank: Tokyo No. 5
|
SoftBank data center on leased floors of the Gotenyama SH Building in Kita-Shinagawa, Tokyo, in service since 2013.
|
|
8.16 miles
|
TISI: Tokyo 4th DC (GDC Gotenyama)
|
TISI's dedicated data center building in Kita-Shinagawa, Tokyo, opened in 2011 as GDC Gotenyama and now marketed as Tokyo 4th DC under the EINS WAVE brand.
|
|
8.17 miles
|
Equinix Tokyo TY11
|
|
|
8.20 miles
|
AT&T Tokyo NRT4
|
|
|
8.35 miles
|
Equinix Tokyo TY6
|
|
|
8.43 miles
|
Equinix Tokyo TY7
|
|
|
8.47 miles
|
Equinix Tokyo TY8
|
|
|
8.47 miles
|
Park BetaInterested in this information?Contact us
|
|
|
8.49 miles
|
SoftBank: Tokyo 4
|
SoftBank Tokyo No. 4 provides a range of colocation services to businesses.
|
|
8.53 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
Vantage plans another data center on 2.8 acres of land in Tokyo, Japan.
|
|
8.59 miles
|
ESR Group: Ariake
|
This will be the company's fourth data center in Japan and second in Tokyo. Construction is scheduled to begin in Q2 2026, with operations expected to start by the end of 2028.
|
|
8.62 miles
|
SoftBank: Tokyo Ariake
|
SoftBank data center in the Ariake Park Building in Tokyo Waterfront City, a district built for disaster resilience.
|
|
8.74 miles
|
Equinix Tokyo TY2
|
|
|
8.76 miles
|
INAP Edogawa-ku
|
|
|
9.01 miles
|
NTT DATA Mitaka East (TK10)
|
|
|
9.13 miles
|
NTT Mitaka West
|
|
|
9.26 miles
|
Telecom Center Building
|
|
|
9.34 miles
|
TISI: Tokyo 2nd DC (Mitaka)
|
TISI data center space inside MC Digital Realty's Mitaka campus in western Tokyo, opened in 2015.
|
|
9.42 miles
|
MCC Mitaka: South Block
|
|
|
9.44 miles
|
MCC Mitaka: North Block
|
|
|
9.94 miles
|
Canon Nishi-Tokyo
|
|
|
10.40 miles
|
North PlazaInterested in this information?Contact us
|
|
|
10.69 miles
|
ESR Group: Higashikurume
|
The company acquired a site in Higashikurume, Tokyo, which previously housed three office buildings across 20,900 square meters (225,000 square feet).
|
|
11.36 miles
|
Deft: Tokyo TY1
|
|
|
11.54 miles
|
INAP Heiwajima Ota-ku
|
|
|
11.54 miles
|
Equinix Tokyo TY1
|
|
|
11.86 miles
|
Colt: Yoshikawa B2
|
Colt Data Centre Services plans to develop Yoshikawa B2 data center, which is the second building of a 9.5-acre campus in Yoshikawa.
|
|
11.91 miles
|
Colt: Yoshikawa B1
|
Colt Data Centre Services is developing Yoshikawa B1 data center, which is the first building of a 9.5-acre campus in Yoshikawa.
|
|
13.87 miles
|
NTT TK8
|
|
|
14.60 miles
|
Telehouse: Tokyo Fuchu
|
The Telehouse Fuchu data center features earthquake-resistant construction on solid ground.
|
|
14.62 miles
|
DayOne: Fuchu Intelligent Park
|
The plots cover a total area of 10,970 square meters (118,080 square feet), and the first phase is scheduled to begin operations in late 2026.
|
|
14.64 miles
|
SoftBank: Tokyo Fuchu
|
Seismically isolated SoftBank data center in Fuchu, western Tokyo, with about 4,000 racks across 25 server rooms.
|
|
14.69 miles
|
NTT Yokohama 1
|
|
|
14.76 miles
|
Princeton PDG TY1 DC2
|
TY1 DC2 is Phase 2 of Princeton Digital Group's TY1 campus in Greater Tokyo (Saitama), Japan, with ready-for-service now expected in Q4 2026.
|
|
14.79 miles
|
Princeton PDG TY1 DC1
|
TY1 is the first project in the Lendlease Data Centre Partners fund and also PDG's first data center in Japan. Lendlease plans to invest US$490 million, and PDG will contribute US$1 to fully fit out the data center.
|
|
16.91 miles
|
Digital Edge: Yokohama TY06
|
The TY06 (YCC North) facility is one of three buildings that make up Digital Edge's Yokohama Computer Center (YCC). The campus is located in Tsuzuki-ku, Yokohama, positioned 5.5 miles (9 kilometers) inland from Tokyo Bay.
|
|
16.96 miles
|
Digital Edge: Yokohama TY04
|
Digital Edge's Yokohama Computer Center (YCC) is situated in Tsuzuki-ku, Yokohama, approximately 5.5 miles (9 kilometers) inland from Tokyo Bay. The campus comprises three buildings.
|
|
17.00 miles
|
Digital Edge: Yokohama TY05
|
The TY05 (YCC East) facility is one of three buildings that make up Digital Edge's Yokohama Computer Center (YCC). The campus is located in Tsuzuki-ku, Yokohama, positioned 5.5 miles (9 kilometers) inland from Tokyo Bay.
|
|
17.12 miles
|
Mapletree: Tama-shi
|
Mapletree Industrial Trust has acquired a 98.47 percent stake in a Tokyo mixed-use property through a JPY14.5 billion ($99.5 million) deal with Nagayama Tokutei Mokuteki Kaisha.
|
|
18.73 miles
|
Telehouse: Tokyo Tama 5
|
KDDI's Tama 5 data center, which opened in July 2020, spans 14 stories and can accommodate 1,500 racks.
|
|
18.80 miles
|
Mitsui: Kanagawa
|
Mitsui & Co., a Japanese conglomerate, invested ¥18 billion (approximately $121 million) to acquire a hyperscale data center.
|
|
19.27 miles
|
ADA: Tokyo East 2
|
GLP's data center subsidiary, Ada Infrastructure, plans to build a data center campus in East Tokyo, consisting of six four-story data center buildings. The campus will feature an N+1 UPS distributed redundant and N+1 closed loop air-cooled chiller plant.
|
|
19.39 miles
|
NTT: Shiroi SHR1
|
The first data center on the campus, the Shiroi Data Center (SHR1) is expected to be completed by April 2027. The building will support AI, cloud computing, and the next generation of digital services.
|
|
19.59 miles
|
SoftBank: Kanagawa Yokohama
|
|
|
19.62 miles
|
ADA: TKW1 DC3
|
Ada Infrastructure has broken ground on the third and final data center building at its Tokyo West 1 campus in Tama, western Tokyo.
|
|
19.62 miles
|
ADA: Tokyo West 2
|
GLP's data center subsidiary, Ada Infrastructure, plans to build a massive data center campus in West Tokyo, Japan, consisting of eight five-story buildings.
|
|
19.66 miles
|
ADA: TKW1 DC2
|
In May 2024, Ada Infrastructure started construction on a second building at its Tokyo West campus in Japan.
|
|
19.71 miles
|
ADA: TKW1 DC1
|
The campus will comprise three buildings, with Building 1 being a three-story facility spanning 8,700 square meters (93,650 square feet) on a 3,400-square-meter (36,600-square-foot) site.
|
|
19.83 miles
|
Telehouse: Tokyo Tama 2
|
KDDI opened its second building at Telehouse Tokyo Tama in 2013, expanding its suburban data center campus.
|
|
19.88 miles
|
Telehouse Tokyo Tama 3
|
|
|
19.89 miles
|
Telehouse: Tokyo Tama 1
|
KDDI's Tama Campus, which opened in 2008, consists of three data center buildings with a total capacity of 4,300 racks.
|
|
19.89 miles
|
South CampusInterested in this information?Contact us
|
|