Ada Infrastructure

Founded in 2023 by GLP, an APAC real estate firm, Ada Infrastructure is an data center company.

Currently, Ada Infrastructure is building seven active campuses located in Japan, the UK, and Brazil, with a total power capacity of over 850 MW and an additional 1,500 MW projected in their global expansion plans.

Ada Infrastructure Data Center Map

Ada Infrastructure Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Ada Infrastructure Locations

ADA: TKE1 Bldg1

Tokyo

GLP's data center subsidiary, Ada Infrastructure, plans to build a data center campus in East Tokyo, Japan, consisting of three four-story data center buildings.

View Data Center

ADA: LCY11

London

LCY11 is the first of three buildings on Ada Infrastructure's Docklands campus in West Silvertown: a seven-storey, 64,203 m2 data center facing the Thames, with ten data halls on floors 2 to 6. McLaren Construction broke ground in February 2026.

View Data Center

ADA: LCY12

London

LCY12 is the second data center building on Ada Infrastructure's Docklands campus in West Silvertown, on the 1.32-hectare Zone 2 plot facing North Woolwich Road, Bell Lane and the West Silvertown DLR viaduct.

View Data Center

ADA: LCY13

London

LCY13 is the third data center building on Ada Infrastructure's Docklands campus in West Silvertown, on the 1.62-hectare Zone 3 plot between the North Woolwich Road loop, the DLR viaduct and Tate & Lyle.

View Data Center

ADA: TKW1 DC1

Tokyo

The campus will comprise three buildings, with Building 1 being a three-story facility spanning 8,700 square meters (93,650 square feet) on a 3,400-square-meter (36,600-square-foot) site.

View Data Center

ADA: Tokyo East 2

Tokyo

GLP's data center subsidiary, Ada Infrastructure, plans to build a data center campus in East Tokyo, consisting of six four-story data center buildings. The campus will feature an N+1 UPS distributed redundant and N+1 closed loop air-cooled chiller plant.

View Data Center

ADA: Osaka East 1

Osaka

GLP's data center subsidiary, Ada Infrastructure, plans to build a four-story data center in East Osaka, Japan. The site will feature an N+1 UPS distributed redundant and N+1 closed loop air-cooled chiller plant.

View Data Center

Ada Infrastructure Data Center Photos See all

Rendering of TKW1
Source: Baxtel
GLP Ada Infrastructure's planned campus in Silvertown, London
Source: GLP
Rendering of Ada Infrastructure's Sao Paulo Data Center
Source: Ada Infrastructure

Related News See all

Read Amazon Settles With Two Former AWS Managers Over Data Center Kickbacks
Amazon has settled its civil claims against two former AWS real estate managers it accused of taking kickbacks on Northern Virginia data center deals. The company told a federal court on October 20...

Amazon Settles With Two Former AWS Managers Over Data Center Kickbacks

October 27, 2026 Northern Virginia

Amazon has settled its civil claims against two former AWS real estate managers it accused of taking kickbacks on Northern Virginia data center deals. The company told a federal court on October 20 that it had reached the agreement with Carl Nelson and Casey Kirschner, less than two weeks before...

Read more
Read STTGDC Secures JPY93 Billion Green Loan For 70.8MW Tokyo Campus
STTGDC has [secured a JPY93 billion green loan](https://www.sttgdc.com/newsroom/sttgdc-secures-jpy93-billion-green-loan-support-expansion-tokyo-data-centre-campus) to fit out the two buildings at i...

STTGDC Secures JPY93 Billion Green Loan For 70.8MW Tokyo Campus

October 27, 2026 Tokyo

STTGDC has secured a JPY93 billion green loan to fit out the two buildings at its 70.8MW data center campus in Inzai City, near Tokyo. The facility is worth about US$589.9 million, STTGDC said on Oct. 27. STTGDC develops, owns and operates both buildings. The company calls them TYO1 and TYO2, and...

Read more
Read Virginia Senator Perry Proposes Three-Year Statewide Data Center Moratorium
State Sen. Russet Perry on Tuesday released draft legislation that would halt approvals for new data centers across Virginia for three years, escalating the political fight over the industry's grow...

Virginia Senator Perry Proposes Three-Year Statewide Data Center Moratorium

October 15, 2026 Northern Virginia

State Sen. Russet Perry on Tuesday released draft legislation that would halt approvals for new data centers across Virginia for three years, escalating the political fight over the industry's growth in the world's largest data center market. Senate Bill 843 would take effect July 1, 2027 and...

Read more
Read 2026 Is the Year Texas Passes Virginia in Data Center Capacity
[Texas](https://baxtel.com/data-center/texas) now has more data center capacity operating and under construction than [Virginia](https://baxtel.com/data-center/virginia). Baxtel tracks 28.3 GW buil...

2026 Is the Year Texas Passes Virginia in Data Center Capacity

October 13, 2026 Northern Virginia

Texas now has more data center capacity operating and under construction than Virginia. Baxtel tracks 28.3 GW built or building in Texas, against 17.8 GW in Virginia. On capacity already online, Virginia still leads, 12.3 GW to 11.1 GW. If projects scheduled for this year deliver on time, Texas...

Read more
Read NTT Data Nears $6.3B, 500MW Data Center Deal For Anthropic In Osaka
NTT Data Group is in the final stages of talks to build a data center in Osaka Prefecture for Anthropic, in what would be the U.S. AI developer's first dedicated facility in Japan. The project coul...

NTT Data Nears $6.3B, 500MW Data Center Deal For Anthropic In Osaka

October 13, 2026 Osaka

NTT Data Group is in the final stages of talks to build a data center in Osaka Prefecture for Anthropic, in what would be the U.S. AI developer's first dedicated facility in Japan. The project could draw up to 500 MW and cost as much as ¥1 trillion, about $6.3 billion, Nikkei Asia reported on...

Read more
Read NTT Data in Final Talks for 500MW, $6.3B Anthropic Data Center in Osaka
[NTT Data Group](https://baxtel.com/data-centers/ntt) is in the final stages of talks to build a data center in [Osaka](https://baxtel.com/regions/osaka) for [Anthropic](https://baxtel.com/data-cen...

NTT Data in Final Talks for 500MW, $6.3B Anthropic Data Center in Osaka

October 13, 2026 Osaka

NTT Data Group is in the final stages of talks to build a data center in Osaka for Anthropic, Nikkei reported Tuesday. Construction could cost up to 1 trillion yen ($6.3 billion), and the site would draw as much as 500 MW of power, among the largest intakes of any facility in the country. The...

Read more

Documents See all

Ready to Level up Your
Data Center Strategy?