MC Digital Realty: NRT14

Latest Podcast 2-Chome Otsuka
Operational
Fully operational facility
Operated by:

MC Digital Realty: NRT14

Year Built: 2026
Floors: 6
░░░░ Request Dataset MW
Total Power
░░░░░░░ Login to view SqFt
Gross Colocation Size

The NRT14 data center, located in Inzai, Chiba Prefecture near Tokyo, is a 31MW facility and the third building at Digital Realty’s NRT campus, developed through its MC Digital Realty joint venture with Mitsubishi Corporation. The facility became operational in April 2026 and is designed for high-density AI and HPC workloads, supporting rack densities of up to 70kW and incorporating air-assisted liquid cooling. As part of a multi-building campus totaling approximately 104MW, NRT14 expands Digital Realty’s presence in Japan’s key hyperscale market, providing scalable, interconnected infrastructure within the Greater Tokyo region.

Map and Nearby Locations

2-Chome Otsuka
MC Digital Realty Sites
Nearby Facilities

MC Digital Realty: NRT14 Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of MC Digital Realty: NRT14

Distance Site About
0.07 miles MC Digital Realty (NRT12)
NRT12 is designed to offer high-density power of up to 70kW per rack
0.15 miles Colt: Inzai 2
This facility is a part of Colt's Inzai campus in Tokyo.
0.15 miles Colt: Inzai 3
This facility is a part of Colt's Inzai campus in Tokyo.
0.16 miles Colt Tokyo Inzai
The Colt campus in Chiba was opened in 2011 and hosts three facilities
0.16 miles MC Digital Realty-Inazi (NRT10)
0.17 miles Colt Inzai 4
Known as Inzai 4 and set on a site area of 8,750 sqm (94,185 sq ft), the facility is already 100 percent pre-let.
0.27 miles Hyperscale Data Center Request Dataset
0.27 miles Hyperscale Data Center Request Dataset
0.40 miles Equinix TY12x
0.41 miles Equinix: TY13x
Equinix opened a new hyperscale data center, TY13x, in Tokyo, Japan in 2023. The facility is located in the Inzai region, adjacent to the existing TY12x data center.
0.42 miles Colt: Inzai 5
Colt is building Inzai 5 Campus on a 2.5 acre site in Chiba, Tokyo.
0.50 miles Hyperscale Data Center Request Dataset
1.03 miles Carrier-Neutral Data Center Request Dataset
This facility is part of ADA Infrastructure's Tokyo East Campus in Tokyo.
1.04 miles Goodman: Shirakami
The Shirakami Data Centre developed by Goodman Group is located in Inzai City, Chiba Prefecture, within the Goodman Business Park—a major data center cluster about 50 kilometers east of central Tokyo.
1.04 miles Hyperscale Data Center Request Dataset
1.05 miles STT Tokyo 1
STT Tokyo 1 is the first of two buildings in STT GDC's data centre campus, supporting the demand for critical digital infrastructure in Japan.
1.08 miles Carrier-Neutral Data Center Request Dataset
This facility is part of ADA Infrastructure's Tokyo East Campus in Tokyo.
1.12 miles ADA: Tokyo East 1
GLP's data center subsidiary, Ada Infrastructure, plans to build a data center campus in East Tokyo, Japan, consisting of three four-story data center buildings.
1.15 miles STT Tokyo 2
STT Tokyo 2 is the second of two buildings in STT GDC's data center campus
1.28 miles IIJ: Shiroi DCC
Japanese internet and data center company IIJ is expanding its Shiroi data center campus, situated east of Tokyo in Shiroi City, Chiba Prefecture.
1.28 miles IIJ: Shiroi Bldg 4
This facility will be part of Internet Initiative Japan Inc. (IIJ)'s Shiroi Campus.
1.29 miles IIJ: Shiroi Bldg 3
Dubbed "Phase 3," this expansion will add about 1,000 racks to Internet Initiative Japan Inc. (IIJ)'s Shiroi Campus.
1.33 miles IIJ: Shiroi Bldg 2
This facility, located within Internet Initiative Japan Inc. (IIJ)'s Shiroi Campus in Chiba Prefecture, provides space for 1,100 racks across 8,000 square meters (86,110 sq ft).
2.24 miles MC Digital: Tokyo Connected Campus @ Inzai
2.32 miles AirTrunk: TOK1 DC6
This planned facility is part of AirTrunk's Tokyo 1 campus in Japan.
2.33 miles AirTrunk: TOK1 DC7
This planned facility is part of AirTrunk's Tokyo 1 campus in Japan.
2.34 miles STACK TKY01
Stack Infrastructure completed their first Tokyo facility in 2024. The campus, situated in the Inzai District of Greater Tokyo, was developed collaboratively with IPI Partners and Oaktree Capital Management.
2.35 miles AirTrunk Tokyo TOK1
AirTrunk’s first data centre in Japan, AirTrunk TOK1 in Inzai near Tokyo, officially opened its doors in November 2021.
2.36 miles AirTrunk: TOK1 DC5
This planned facility is part of AirTrunk's Tokyo 1 campus in Japan.
2.36 miles STACK: TKY01B
This facility is part of Stack Infrastructure's first campus in Tokyo, Japan.
2.39 miles AirTrunk: TOK1 DC2
This facility is part of AirTrunk's Tokyo 1 campus in Japan.
2.40 miles AirTrunk: TOK1 DC3
This facility is part of AirTrunk's Tokyo 1 campus in Japan.
2.45 miles AirTrunk: TOK1 DC4
This planned facility is part of AirTrunk's Tokyo 1 campus in Japan.
3.64 miles NTT: Shiroi SHR1
The first data center on the campus, the Shiroi Data Center (SHR1) is expected to be completed by April 2027. The building will support AI, cloud computing, and the next generation of digital services.
3.97 miles ADA: Tokyo East 2
GLP's data center subsidiary, Ada Infrastructure, plans to build a data center campus in East Tokyo, consisting of six four-story data center buildings. The campus will feature an N+1 UPS distributed redundant and N+1 closed loop air-cooled chiller plant.
15.00 miles Colt: Yoshikawa B2
Colt Data Centre Services plans to develop Yoshikawa B2 data center, which is the second building of a 9.5-acre campus in Yoshikawa.
15.03 miles Colt: Yoshikawa B1
Colt Data Centre Services is developing Yoshikawa B1 data center, which is the first building of a 9.5-acre campus in Yoshikawa.
15.73 miles INAP Edogawa-ku
18.66 miles NTT TK9
18.66 miles SoftBank: Tokyo 4
SoftBank Tokyo No. 4 provides a range of colocation services to businesses.
18.76 miles NTT TK2
19.35 miles INAP Koto-ku
19.38 miles Empyrion: Tokyo JP1
The facility will be AI-ready, span 21,000 sqm across five floors, and will be Tier III carrier-neutral with secured power.
19.55 miles Flow Digital: TK8
This facility will be part of Flow Digital's Tokyo Data Center Campus.
19.60 miles Flow Digital: Tokyo TK7
APAC data center firm Flow Digital Infrastructure has started work on a new campus in Tokyo that will comprise two buildings—TK7 and TK8.
19.91 miles Colt Shiohama

MC Digital Realty: NRT14 Data Center Photos See all

Operating Company

Operated by:

MC Digital Realty, Inc. is a joint venture between Mitsubishi Corporation and Digital Realty. In addition to offering high levels of robustness and security, stable power supply, air conditioning and other functionality, MC Digital Realty combines Mitsubishi Corporation's realty and IT-related knowledge with Digital Realty's network of overseas customers and expertise in large-scale data center operations and delivery. MC Digital Realty provides data center operation services to satisfy the global-standard requirements of end users in Japan

11
Facilities
2
Markets
195MW
Megawatts

News See all

Read Digital Realty Launches New Data Center in Barcelona
Digital Realty Launches New Data Center in Barcelona

Digital Realty Launches New Data Center in Barcelona

May 18, 2026 MC Digital Realty

Digital Realty has opened a new data center in Barcelona, marking its first facility in the city. The BCN1 site is located at Av. del Maresme, 43 in the Sant Adrià de Besòs innovation district. Digital Realty, through its subsidiary Interxion, announced plans in 2022 for a 15MW data center in...

Read more
Read Stack Secures Green Financing for Data Center in Tokyo
Stack Secures Green Financing for Data Center in Tokyo

Stack Secures Green Financing for Data Center in Tokyo

October 27, 2025 Tokyo

Stack Infrastructure has secured a 39.7 billion yen ($247.7m) green financing package to develop its data center campus in Japan's capital, Tokyo. The first stage of the 36MW TKY01 campus in Inzai, Greater Tokyo, is set to come online next year, offering 18MW, with the additional capacity set to...

Read more
Read Airtrunk data center development at Tokyo data center
Airtrunk data center development at Tokyo data center

Airtrunk data center development at Tokyo data center

February 22, 2023 AirTrunk Tokyo TOK2

AirTrunk has announced that it has broken ground on the second phase of its TOK2 data center located in Tokyo, Japan. This follows the groundbreaking of the first phase only three months ago. The company has outlined that the new phase is scalable to approximately 50MW of capacity and...

Read more
Read MC Digital Realty expands Osaka footprint
MC Digital Realty expands Osaka footprint

MC Digital Realty expands Osaka footprint

February 17, 2023 MC Digital Realty

MC Digital Realty, the 50/50 joint venture (JV) between Mitsubishi Corporation and Digital Realty, launched to provide a full suite of data center solutions in Japan and this week announced the opening of the three-story KIX13. This is the fourth building on the 23,000sqm Osaka data center...

Read more
Read Alibaba Opens New Data Center in Tokyo
Alibaba Opens New Data Center in Tokyo

Alibaba Opens New Data Center in Tokyo

December 23, 2022 Tokyo

Alibaba has established a data center in Tokyo, Japan. The company stated in December 2022 that its Alibaba Cloud/Aliyun division had opened a third data center in Japan to "meet the transformation expectations" of clients. Unique Song, General Manager of Japan for Alibaba Cloud Intelligence,...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?