Las Vegas Data Center Market

Latest Podcast

The Las Vegas data center market is located in the state of Nevada within Americas. Las Vegas has 37 facilities with 4,384,600 sqft and 559 megawatts.

The top providers in Las Vegas are Switch (15 sites) and Google with 1 facility . The most popular facilities are DataBank Las Vegas LAS1 and EdgeConneX Las Vegas.

Market Facts

Las Vegas Data Center Map

Las Vegas Power Growth Over Time

+75% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Data Centers in Las Vegas

Name Company Size Status Type
DataBank Las Vegas LAS1 DataBank Small Operational Carrier-Neutral
EdgeConneX Las Vegas EdgeConneX Extra Small Operational Carrier-Neutral
Lumen: Las Vegas (1 Aerojet) Lumen Technologies Small Operational Carrier
Lumen: Las Vegas 2 Lumen Technologies Extra Small Operational Carrier
Lumen: Las Vegas 3 Lumen Technologies Extra Small Operational Carrier
Flexential Las Vegas (Lone Mountain) Flexential Small Operational Carrier-Neutral
Flexential Carson I & II Flexential Small Operational Carrier-Neutral
Verizon: 2240 Corporate Cir Verizon Enterprise Extra Small Operational Carrier
Switch Las Vegas CORE Campus Switch Operational Carrier-Neutral
Switch Las Vegas 8 Switch Large Operational Carrier-Neutral
Switch Las Vegas 7 Switch Medium Operational Carrier-Neutral
Switch Las Vegas 9 Switch Large Operational Carrier-Neutral
Switch Las Vegas 10 Switch Large Operational Carrier-Neutral
Switch Las Vegas 11 Switch Large Operational Carrier-Neutral
Switch Las Vegas 12 Switch Medium Operational Carrier-Neutral
Switch Las Vegas 2 Switch Extra Small Operational Carrier-Neutral
Switch Las Vegas 5 Switch Extra Small Operational Carrier-Neutral
Switch Edge 1 Switch Extra Small Operational Carrier-Neutral
Switch: Las Vegas 15 Switch Large Operational Carrier-Neutral
Switch: EVO AI Factory 1 Switch Large Operational Carrier-Neutral
Switch: EVO AI Factory 2 Switch Large Construction Carrier-Neutral
Switch: Apex Industrial Park Switch Extra Large Land Bank, Planned, Prospective Expansion Carrier-Neutral
Switch: Las Vegas 14 Switch Large Operational Carrier-Neutral
Carrier-Neutral Data CenterInterested in this information?Contact us Switch Large Operational Carrier-Neutral
Fiberhub - Las Vegas Fiberhub Extra Small Operational Carrier-Neutral
ISP.Net DC1 ISP.Net Extra Small Operational Carrier
ISP.Net DC2 ISP.Net Extra Small Operational Carrier
ColoXchange Las Vegas ColoXchange Small Operational Carrier-Neutral
Contegix Las Vegas Contegix Operational Carrier-Neutral
Cloud ParkInterested in this information?Contact us Google Extra Large Operational, Planned Hyperscale
Novva Las Vegas Novva Data Centers Large Operational, Planned Carrier-Neutral
Novva: Apex Industrial Park Novva Data Centers Land Bank Carrier-Neutral
CoreWeave: US West LAS1 CoreWeave Operational Neocloud
Edged Energy: Las Vegas LAS01 Edged Energy Extra Large Planned Carrier-Neutral
Jet.AI: Moapa, NV Jet.AI Large Planned Carrier-Neutral
Townsite Solar 2: Boulder City Townsite Solar 2 LLC Withdrawn Energy
Townsite DC: Boulder City Townsite Solar 2 LLC Extra Large Planned Energy

Largest Providers in Las Vegas

Switch
Site
Power
Operational
14
376.7
Construction
1
Planned
1
Prospective Expansion
1
Land Bank
1
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
15
View Provider
Google
Site
Power
Operational
1
125.0
Construction
0
Planned
1
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
1
View Provider
Novva Data Centers
Site
Power
Operational
1
27.0
Construction
0
Planned
1
Prospective Expansion
0
Land Bank
1
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
1
View Provider
Flexential
Site
Power
Operational
2
11.88
Construction
0
Planned
0
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
2
View Provider

Largest Data Centers in Las Vegas

Sites Under Construction in Las Vegas

Location Building SqFt Power (MW) Estimated Launch
Switch: EVO AI Factory 2 228,000 SqFt 70 Megawatts
Switch: EVO AI Factory 1 SqFt 0 Megawatts Q3 2026

Data Center Events in Las Vegas See all

4 events
Event Starts in Details
10 days
View RE+ 2026
Organized by:
Solar Energy Industries Association
Description:

RE+ 2026 is the 21st edition of North America's largest clean energy event, held November 16 to 19, 2026 at the Las Vegas Convention Center. Organized by the Solar Energy Industries Association (SEIA) and the Smart Electric Power Alliance (SEPA) through RE+ Events, the show draws 40,000+ attendees and 1,300+ exhibitors across solar, energy storage, hydrogen, EV infrastructure, grid edge technol...

269 days
View Ai4 2027
Organized by:
Ai4
Type:
Cloud Enterprise IT
Description:

Ai4 2027 is a four-day artificial intelligence conference at The Venetian in Las Vegas, running August 2 to 5, 2027. Ai4, now part of CloserStill Media, brings together business executives, technology leaders, startups, investors, and researchers working on applied AI across industries. The Ai4 site lists 20,000+ attendees and 600+ exhibits, and says 1,300+ speakers took part in 2026. Programmi...

318 days
View Yotta 2027
Organized by:
Data Centre Dynamics Ltd
Type:
Data Center Power
Description:

Yotta 2027 is an annual three-day digital infrastructure conference taking place September 20 to 22, 2027, at The Venetian Resort in Las Vegas, Nevada. Organized by Data Centre Dynamics, the summit sits at the intersection of artificial intelligence, energy generation, and critical infrastructure. The 2027 edition relocates to The Venetian to support anticipated growth, projecting more than 8,0...

347 days
View infra/STRUCTURE 2027
Organized by:
Structure Research
Type:
Data Center Cloud
Description:

infra/STRUCTURE 2027 is the eighth annual infra/STRUCTURE Summit, a vendor-neutral digital infrastructure event organized by Structure Research. It takes place October 19 to 21, 2027, at Wynn Las Vegas. The summit brings together data center, neocloud, hyperscale, colocation, edge, and AI infrastructure executives. The format centers on private 1:1 meetings, roundtables, panel discussions, and ...

Related News See all

Read Google Identified as User Behind 1,200MW Goochland Data Center Campus
Google is considering a 1,200MW data center campus on about 1,000 acres in Goochland County, Virginia, the county confirmed on Oct. 28. The [county's announcement](https://www.goochlandva.us/) name...

Google Identified as User Behind 1,200MW Goochland Data Center Campus

October 29, 2026 Google

Google is considering a 1,200MW data center campus on about 1,000 acres in Goochland County, Virginia, the county confirmed on Oct. 28. The county's announcement named Google as the company behind a project that appeared in Virginia regulatory filings in July without an identified owner....

Read more
Read Oracle To Deploy Google TPUs On OCI In Multi-Gigawatt Deal
Oracle will sell Google's Tensor Processing Units through Oracle Cloud Infrastructure under a deal the companies [announced](https://www.oracle.com/news/announcement/ai-world-oracle-brings-google-t...

Oracle To Deploy Google TPUs On OCI In Multi-Gigawatt Deal

October 28, 2026 Oracle

Oracle will sell Google's Tensor Processing Units through Oracle Cloud Infrastructure under a deal the companies announced on Oct. 27. The agreement makes OCI the first hyperscale cloud platform outside Google to offer the chips, Google Cloud said. TPU capacity on OCI is scheduled to become...

Read more
Read Verizon Signs $2B-Plus Dark Fiber Deal With AWS
[Verizon](https://baxtel.com/data-centers/verizon-enterprise) will supply dark fiber to Amazon Web Services ([AWS](https://baxtel.com/data-centers/amazon-aws)) under an agreement worth more than $2...

Verizon Signs $2B-Plus Dark Fiber Deal With AWS

October 27, 2026 Amazon AWS

Verizon will supply dark fiber to Amazon Web Services (AWS) under an agreement worth more than $2 billion, the carrier said on Oct. 26. Verizon disclosed the deal in its third-quarter results. The carrier provides the high-capacity fiber links, and AWS is the customer that uses that connectivity...

Read more
Read CoreWeave Brings 22.5MW Online at atNorth's Copenhagen Data Center
CoreWeave has brought most of its planned 22.5MW of IT capacity online at [atNorth](https://baxtel.com/data-centers/atnorth)'s [DEN01](https://baxtel.com/data-center/atnorth-den01) data center in t...

CoreWeave Brings 22.5MW Online at atNorth's Copenhagen Data Center

October 27, 2026 CoreWeave

CoreWeave has brought most of its planned 22.5MW of IT capacity online at atNorth's DEN01 data center in the Copenhagen metro, its first deployment in Denmark. The company announced the activation from London on October 27. atNorth owns and operates DEN01, a colocation site in Ballerup,...

Read more
Read Hermantown Sets Friday Vote On Google Data Center After Protests Halt Meetings
Hermantown has moved its City Council vote on Google's proposed data center to Friday after protests shut down two meetings. The city scheduled the session for 6:30 p.m. on Oct. 30 with the same si...

Hermantown Sets Friday Vote On Google Data Center After Protests Halt Meetings

October 27, 2026 Google

Hermantown has moved its City Council vote on Google's proposed data center to Friday after protests shut down two meetings. The city scheduled the session for 6:30 p.m. on Oct. 30 with the same six resolutions from the canceled Oct. 27 agenda, according to a city press release. The...

Read more
Read Google Apologizes And Halts Work At Two Finnish Data Center Sites
Finland's Licensing and Supervision Authority has told Google subsidiary Tuike Finland to keep preparatory work at its [Muhos](https://baxtel.com/data-center/google-muhos) and [Kajaani](https://bax...

Google Apologizes And Halts Work At Two Finnish Data Center Sites

October 26, 2026 Google

Finland's Licensing and Supervision Authority has told Google subsidiary Tuike Finland to keep preparatory work at its Muhos and Kajaani data center sites suspended. The agency set an Oct. 23 deadline for felling, excavation, blasting and road building to stop at both sites, according to its...

Read more

Related Podcasts See all

E11: Building India’s Digital Backbone with Sharad Agarwal

Executive Summary In this episode recorded live at PTC 26, Eric Bell speaks with Sharad Agarwal, ...

E10 - AI Cooling And Data Centers With Cliff Federspiel

In this episode, we sit down with Cliff Federspiel, President and CTO of Vigilent, to explore how...

E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins

In this Baxtel Podcast episode, Eric Bell sits down with Wes Cummins, CEO of Applied Digital, to ...

E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load

In this episode, Eric Bell sits down with Russell Fletcher to unpack what it really means to oper...

E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse

Nick Kruse is a chemical engineer turned energy entrepreneur who sits at the nexus of power and c...

E5: Mark Jobson on Data Center Strategy, Marketing, and IPOs

In this episode of Baxtel’s Meet Me Room podcast, we sit down with global marketing executive Mar...

Documents

Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.