Las Vegas Data Center Market

Latest Podcast

The Las Vegas data center market is located in the state of Nevada within Americas. Las Vegas has 37 facilities with 4,384,600 sqft and 559 megawatts.

The top providers in Las Vegas are Switch (15 sites) and Google with 1 facility . The most popular facilities are DataBank Las Vegas LAS1 and EdgeConneX Las Vegas.

Market Facts

Las Vegas Data Center Map

Las Vegas Power Growth Over Time

+75% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Data Centers in Las Vegas

Name Company Size Status Type
DataBank Las Vegas LAS1 DataBank Small Operational Carrier-Neutral
EdgeConneX Las Vegas EdgeConneX Extra Small Operational Carrier-Neutral
Lumen: Las Vegas (1 Aerojet) Lumen Technologies Small Operational Carrier
Lumen: Las Vegas 2 Lumen Technologies Extra Small Operational Carrier
Lumen: Las Vegas 3 Lumen Technologies Extra Small Operational Carrier
Flexential Las Vegas (Lone Mountain) Flexential Small Operational Carrier-Neutral
Flexential Carson I & II Flexential Small Operational Carrier-Neutral
Verizon: 2240 Corporate Cir Verizon Enterprise Extra Small Operational Carrier
Switch Las Vegas CORE Campus Switch Operational Carrier-Neutral
Switch Las Vegas 8 Switch Large Operational Carrier-Neutral
Switch Las Vegas 7 Switch Medium Operational Carrier-Neutral
Switch Las Vegas 9 Switch Large Operational Carrier-Neutral
Switch Las Vegas 10 Switch Large Operational Carrier-Neutral
Switch Las Vegas 11 Switch Large Operational Carrier-Neutral
Switch Las Vegas 12 Switch Medium Operational Carrier-Neutral
Switch Las Vegas 2 Switch Extra Small Operational Carrier-Neutral
Switch Las Vegas 5 Switch Extra Small Operational Carrier-Neutral
Switch Edge 1 Switch Extra Small Operational Carrier-Neutral
Switch: Las Vegas 15 Switch Large Operational Carrier-Neutral
Switch: EVO AI Factory 1 Switch Large Operational Carrier-Neutral
Switch: EVO AI Factory 2 Switch Large Construction Carrier-Neutral
Switch: Apex Industrial Park Switch Extra Large Land Bank, Planned, Prospective Expansion Carrier-Neutral
Switch: Las Vegas 14 Switch Large Operational Carrier-Neutral
Carrier-Neutral Data CenterInterested in this information?Contact us Switch Large Operational Carrier-Neutral
Fiberhub - Las Vegas Fiberhub Extra Small Operational Carrier-Neutral
ISP.Net DC1 ISP.Net Extra Small Operational Carrier
ISP.Net DC2 ISP.Net Extra Small Operational Carrier
ColoXchange Las Vegas ColoXchange Small Operational Carrier-Neutral
Contegix Las Vegas Contegix Operational Carrier-Neutral
StationInterested in this information?Contact us Google Extra Large Operational, Planned Hyperscale
Novva Las Vegas Novva Data Centers Large Operational, Planned Carrier-Neutral
Novva: Apex Industrial Park Novva Data Centers Land Bank Carrier-Neutral
CoreWeave: US West LAS1 CoreWeave Operational Neocloud
Edged Energy: Las Vegas LAS01 Edged Energy Extra Large Planned Carrier-Neutral
Jet.AI: Moapa, NV Jet.AI Large Planned Carrier-Neutral
Townsite Solar 2: Boulder City Townsite Solar 2 LLC Withdrawn Energy
Townsite DC: Boulder City Townsite Solar 2 LLC Large Planned Energy

Largest Providers in Las Vegas

Switch
Site
Power
Operational
14
376.7
Construction
1
Planned
1
Prospective Expansion
1
Land Bank
1
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
15
View Provider
Google
Site
Power
Operational
1
125.0
Construction
0
Planned
1
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
1
View Provider
Novva Data Centers
Site
Power
Operational
1
27.0
Construction
0
Planned
1
Prospective Expansion
0
Land Bank
1
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
1
View Provider
Flexential
Site
Power
Operational
2
11.88
Construction
0
Planned
0
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
2
View Provider

Largest Data Centers in Las Vegas

Sites Under Construction in Las Vegas

Location Building SqFt Power (MW) Estimated Launch
Switch: EVO AI Factory 2 228,000 SqFt 70 Megawatts
Switch: EVO AI Factory 1 SqFt 0 Megawatts Q3 2026

Data Center Events in Las Vegas See all

2 events
Event Starts in Details
30 days
View RE+ 2026
Organized by:
Solar Energy Industries Association
Description:

RE+ 2026 is the 21st edition of North America's largest clean energy event, held November 16 to 19, 2026 at the Las Vegas Convention Center. Organized by the Solar Energy Industries Association (SEIA) and the Smart Electric Power Alliance (SEPA) through RE+ Events, the show draws 40,000+ attendees and 1,300+ exhibitors across solar, energy storage, hydrogen, EV infrastructure, grid edge technol...

338 days
View Yotta 2027
Organized by:
Data Centre Dynamics Ltd
Type:
Data Center Power
Description:

Yotta 2027 is an annual three-day digital infrastructure conference taking place September 20 to 22, 2027, at The Venetian Resort in Las Vegas, Nevada. Organized by Data Centre Dynamics, the summit sits at the intersection of artificial intelligence, energy generation, and critical infrastructure. The 2027 edition relocates to The Venetian to support anticipated growth, projecting more than 8,0...

Related News See all

Read Finland Halts Two Google Data Center Builds Over 300-Hectare Forest Clearing
Finnish regulators have ordered a halt to work at two planned [Google](https://baxtel.com/data-centers/google) data centers after more than 300 hectares of forest were cleared before mandatory envi...

Finland Halts Two Google Data Center Builds Over 300-Hectare Forest Clearing

October 10, 2026 Google

Finnish regulators have ordered a halt to work at two planned Google data centers after more than 300 hectares of forest were cleared before mandatory environmental impact assessments were completed, the BBC reported. The order covers the company's project sites in Muhos and Kajaani, both in the...

Read more
Read Google’s €13bn Finland Data Center Expansion Investigated Over Forest Clearance
Google’s planned data centers in Finland are under investigation after around 300 hectares of forest were reportedly cleared before environmental assessments were completed. Finland’s Licensing and...

Google’s €13bn Finland Data Center Expansion Investigated Over Forest Clearance

October 08, 2026 Google

Google’s planned data centers in Finland are under investigation after around 300 hectares of forest were reportedly cleared before environmental assessments were completed. Finland’s Licensing and Supervision Agency has requested reports from local authorities and project manager Tuike Finland...

Read more
Read Google Signs 20-Year Nuclear PPA With Constellation For 890MW In PJM
[Google](https://baxtel.com/data-centers/google) will buy 890 MW of new nuclear output from Constellation Energy under a 20-year power purchase agreement covering 11 reactors across the PJM Interco...

Google Signs 20-Year Nuclear PPA With Constellation For 890MW In PJM

October 07, 2026 Google

Google will buy 890 MW of new nuclear output from Constellation Energy under a 20-year power purchase agreement covering 11 reactors across the PJM Interconnection, the companies announced on Oct. 6. Constellation will spend more than $4.3 billion upgrading reactors in Illinois, Pennsylvania and...

Read more
Read Google’s Global Data Center Design and Construction Head Joins Anthropic
Google’s former head of global data center design and construction, John M. Wilson, has joined Anthropic as a member of technical staff, leading EMEA capacity delivery after six years at Google.

...

Google’s Global Data Center Design and Construction Head Joins Anthropic

October 05, 2026 Google

Google’s former head of global data center design and construction, John M. Wilson, has joined Anthropic as a member of technical staff, leading EMEA capacity delivery after six years at Google. "Leading global infrastructure delivery across data centers and subsea programs taught me two enduring...

Read more
Read Crusoe Confirms Google AI Campus In Texas With 531MW Wind Link
Crusoe is the developer behind Google's data center campus under construction in Armstrong County, Texas, the company [said on Sept. 28](https://www.crusoe.ai/resources/newsroom/crusoe-developing-d...

Crusoe Confirms Google AI Campus In Texas With 531MW Wind Link

October 01, 2026 Crusoe

Crusoe is the developer behind Google's data center campus under construction in Armstrong County, Texas, the company said on Sept. 28. The site sits outside Amarillo, and it pairs with 531 megawatts of adjacent West Texas wind, a design that puts generation rather than land at the center of the...

Read more
Read Google Secures Approval to Expand Dublin Data Center
Google has received planning approval from An Coimisiún Pleanála to expand its data center campus at Grange Castle Business Park in Dublin, following a lengthy dispute with South Dublin County Coun...

Google Secures Approval to Expand Dublin Data Center

September 29, 2026 Google

Google has received planning approval from An Coimisiún Pleanála to expand its data center campus at Grange Castle Business Park in Dublin, following a lengthy dispute with South Dublin County Council. The company first proposed a 72,400 sqm (779,310 sq ft) third data center building at the...

Read more

Related Podcasts See all

E11: Building India’s Digital Backbone with Sharad Agarwal

Executive Summary In this episode recorded live at PTC 26, Eric Bell speaks with Sharad Agarwal, ...

E10 - AI Cooling And Data Centers With Cliff Federspiel

In this episode, we sit down with Cliff Federspiel, President and CTO of Vigilent, to explore how...

E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins

In this Baxtel Podcast episode, Eric Bell sits down with Wes Cummins, CEO of Applied Digital, to ...

E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load

In this episode, Eric Bell sits down with Russell Fletcher to unpack what it really means to oper...

E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse

Nick Kruse is a chemical engineer turned energy entrepreneur who sits at the nexus of power and c...

E5: Mark Jobson on Data Center Strategy, Marketing, and IPOs

In this episode of Baxtel’s Meet Me Room podcast, we sit down with global marketing executive Mar...

Documents

Ready to Level up Your
Data Center Strategy?