Nevada Data Center Market

Latest Podcast
Aerial View of Hoover Dam

The Nevada data center market is located in the region of Mountain West and within United States. Nevada has 83 facilities.

The top providers in Nevada are Switch (22 sites) and Tract with 2 facilities . The most popular facilities are Switch: Armory Bldg1 and Switch: Armory Bldg1.

Market Facts

Nevada Data Center Map

Nevada Power Growth Over Time

+69% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Largest Providers in Nevada

Switch
Site
Power
Operational
18
663.7
Construction
4
Planned
5
Prospective Expansion
1
Land Bank
1
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
22
View Provider
Tract
Site
Power
Operational
0
0.0
Construction
2
Planned
4
Prospective Expansion
1
Land Bank
2
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
2
View Provider
Google
Site
Power
Operational
2
225.0
Construction
0
Planned
1
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
2
View Provider
Apple
Site
Power
Operational
3
150.0
Construction
0
Planned
0
Prospective Expansion
0
Land Bank
3
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
3
View Provider

Largest Data Centers in Nevada

Regions in Nevada

Data Center Events in Nevada See all

2 events
Event Starts in Details
29 days
View RE+ 2026
Organized by:
Solar Energy Industries Association
Description:

RE+ 2026 is the 21st edition of North America's largest clean energy event, held November 16 to 19, 2026 at the Las Vegas Convention Center. Organized by the Solar Energy Industries Association (SEIA) and the Smart Electric Power Alliance (SEPA) through RE+ Events, the show draws 40,000+ attendees and 1,300+ exhibitors across solar, energy storage, hydrogen, EV infrastructure, grid edge technol...

337 days
View Yotta 2027
Organized by:
Data Centre Dynamics Ltd
Type:
Data Center Power
Description:

Yotta 2027 is an annual three-day digital infrastructure conference taking place September 20 to 22, 2027, at The Venetian Resort in Las Vegas, Nevada. Organized by Data Centre Dynamics, the summit sits at the intersection of artificial intelligence, energy generation, and critical infrastructure. The 2027 edition relocates to The Venetian to support anticipated growth, projecting more than 8,0...

Related News See all

Read Switch Files Plans for 176-Acre Apex Data Center Campus in North Las Vegas
Switch has submitted a letter of intent to North Las Vegas officials for a roughly 175-acre data center campus at Apex Industrial Park, the first formal development proposal for a land position the...

Switch Files Plans for 176-Acre Apex Data Center Campus in North Las Vegas

September 26, 2026 Switch

Switch has submitted a letter of intent to North Las Vegas officials for a roughly 175-acre data center campus at Apex Industrial Park, the first formal development proposal for a land position the company has quietly assembled along the US-93 corridor since the start of the year. KTNV Las Vegas...

Read more
Read Switch Files Plans For Data Center Campus At Former Pittsburgh Race Track
Switch has filed plans for a new three-building data center campus in Big Beaver Borough, near Pittsburgh, Pennsylvania. The proposed Big Beaver Data Center/Switch Pit 01-03 will feature three faci...

Switch Files Plans For Data Center Campus At Former Pittsburgh Race Track

August 24, 2026 Switch

Switch has filed plans for a new three-building data center campus in Big Beaver Borough, near Pittsburgh, Pennsylvania. The proposed Big Beaver Data Center/Switch Pit 01-03 will feature three facilities, each covering 201,690 sq ft (18,737 sqm). Planning documents indicate a combined backup...

Read more
Read Iron County, Utah Data Center Proposal Gets Green Light
Plans for a 640-acre data center in Iron County, Utah, have been approved by local authorities. The Iron County Planning Commission voted in favor of the proposal during a meeting on June 4.

The...

Iron County, Utah Data Center Proposal Gets Green Light

June 13, 2026 Switch

Plans for a 640-acre data center in Iron County, Utah, have been approved by local authorities. The Iron County Planning Commission voted in favor of the proposal during a meeting on June 4. The Antelope Data Center campus will include five buildings totaling around 1.35 million sq ft (125,000...

Read more
Read Switch Expands Debt Facility to $9.5B to Fund AI Data Center Expansion
Data center firm Switch has increased its available debt capacity to $9.5 billion. The company now has access to a more than $6 billion corporate revolving credit facility, alongside an expanded $3...

Switch Expands Debt Facility to $9.5B to Fund AI Data Center Expansion

June 10, 2026 Switch

Data center firm Switch has increased its available debt capacity to $9.5 billion. The company now has access to a more than $6 billion corporate revolving credit facility, alongside an expanded $3.5 billion syndicated uncommitted performance letter of credit facility (LCF). In April, Switch...

Read more
Read Fleet Breaks Ground on a New Data Center Project Outside Reno, Nevada
Fleet Breaks Ground on a New Data Center Project Outside Reno, Nevada

Fleet Breaks Ground on a New Data Center Project Outside Reno, Nevada

May 21, 2026 Nevada

Fleet has begun construction on its first data center facility near Reno, Nevada. Local reports say the company broke ground this week at an event attended by Nevada Governor Joe Lombardo. The project will deliver a 230MW data center on a 256-acre site in Storey County owned by Tract.The Fleet...

Read more
Read Centra Completes Structural Topping out of Reno Data Center
Centra Completes Structural Topping out of Reno Data Center

Centra Completes Structural Topping out of Reno Data Center

May 04, 2026 Reno

US data center firm Centra has topped out a new facility in Reno, Nevada. "We've officially topped out RNO2, our second Reno facility and the region's first carrier-neutral interconnection data center,” the company said on LinkedIn. “This moment represents our significant progress toward...

Read more

Related Podcasts See all

E11: Building India’s Digital Backbone with Sharad Agarwal

Executive Summary In this episode recorded live at PTC 26, Eric Bell speaks with Sharad Agarwal, ...

E10 - AI Cooling And Data Centers With Cliff Federspiel

In this episode, we sit down with Cliff Federspiel, President and CTO of Vigilent, to explore how...

E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins

In this Baxtel Podcast episode, Eric Bell sits down with Wes Cummins, CEO of Applied Digital, to ...

E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load

In this episode, Eric Bell sits down with Russell Fletcher to unpack what it really means to oper...

E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse

Nick Kruse is a chemical engineer turned energy entrepreneur who sits at the nexus of power and c...

E5: Mark Jobson on Data Center Strategy, Marketing, and IPOs

In this episode of Baxtel’s Meet Me Room podcast, we sit down with global marketing executive Mar...