0.09 miles
|
Switch Las Vegas 5
|
|
|
0.13 miles
|
Switch Las Vegas 2
|
|
|
2.27 miles
|
ISP.Net DC1
|
|
|
3.96 miles
|
Edged Energy: Las Vegas LAS01
|
Edged Energy intends to construct a data center campus in Las Vegas, with operations expected to begin in Q1 2028.
|
|
4.09 miles
|
Flexential Carson I & II
|
|
|
4.28 miles
|
ISP.Net DC2
|
|
|
4.67 miles
|
Lumen: Las Vegas 3
|
|
|
6.22 miles
|
EdgeConneX Las Vegas
|
EdgeConnex has rights to adjacent space to accommodate expansion
|
|
6.39 miles
|
Fiberhub - Las Vegas
|
|
|
6.78 miles
|
Lumen: Las Vegas (1 Aerojet)
|
|
|
6.79 miles
|
ColoXchange Las Vegas
|
|
|
7.01 miles
|
DataBank Las Vegas LAS1
|
The site was a former zColo (Zayo) facility before being acquired in 2020.
|
|
7.12 miles
|
Edge CampusInterested in this information?Contact us
|
|
|
7.32 miles
|
Flexential Las Vegas (Lone Mountain)
|
The Lone Mountain Data Center in North Las Vegas opened in 2013. Flexential's Lone Mountain site is former ViaWest.
AwardedTier IV Design Certification by the Uptime Institute for the design documents
3,000 tons redundant, fault-tolerant cooling capacity
|
|
8.03 miles
|
Verizon: 2240 Corporate Cir
|
|
|
8.88 miles
|
Novva Las Vegas
|
Novva’s newest purpose-built data center is located at 6115 Nicco Way, Las Vegas.
|
|
9.45 miles
|
CoreWeave: US West LAS1
|
|
|
9.45 miles
|
Switch Las Vegas 7
|
|
|
9.45 miles
|
Contegix Las Vegas
|
|
|
9.48 miles
|
Switch Las Vegas CORE Campus
|
The Core Campus in Las Vegas, Nevada currently encompasses nine separate data centers with up to approximately 2.0 million GSF of space and up to 275 MW of 100% renewable power available to these facilities.
|
|
9.54 miles
|
Switch Las Vegas 12
|
|
|
9.57 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
|
|
9.61 miles
|
Switch Edge 1
|
|
|
9.71 miles
|
Switch Las Vegas 8
|
|
|
9.77 miles
|
Switch: Las Vegas 14
|
|
|
9.77 miles
|
Switch: Las Vegas 15
|
|
|
9.79 miles
|
Switch Las Vegas 11
|
|
|
9.90 miles
|
Switch Las Vegas 10
|
|
|
9.92 miles
|
Switch Las Vegas 9
|
|
|
10.01 miles
|
Switch: EVO AI Factory 2
|
The company is developing two buildings, one measuring 199,000 sq ft (18,485 sqm) and the other 228,000 sq ft (21,180 sqm) in the southwest Las Vegas Valley to host specialized AI hardware.
|
|
10.11 miles
|
Switch: EVO AI Factory 1
|
The company is developing two buildings, one measuring 199,000 sq ft (18,485 sqm) and the other 228,000 sq ft (21,180 sqm) in the southwest Las Vegas Valley to host specialized AI hardware.
|
|
11.24 miles
|
Switch: Armory Bldg2
|
The central data center building in Switch’s approved three-building Armory Campus development.
|
|
11.30 miles
|
Switch: Armory Bldg1
|
The northernmost of three identical data center buildings approved for Switch’s Armory Campus in Enterprise.
|
|
11.34 miles
|
Switch: Armory Bldg3
|
The southernmost data center building approved for Switch’s Armory Campus near Las Vegas.
|
|
15.40 miles
|
Novva: Apex Industrial Park
|
Novva Data Centers, a US operator, has purchased nearly 205 acres within the North Las Vegas Apex Industrial Park from VanTrust Real Estate.
|
|
16.51 miles
|
Townsite Solar 2: Boulder City
|
Townsite Solar 2 (TS2), a Skylar Capital subsidiary developing in partnership with Arevon Energy and Overwatch Capital, is relocating its planned high-density AI data center campus outside Las Vegas from municipal land to federal jurisdiction.
|
|
16.71 miles
|
Townsite DC: Boulder City
|