Flexential to Build Sixth Hillsboro Facility
September 06, 2025
Flexential
The Carson sites in Las Vegas are a former ViaWest. Flexential was created after Peak10 acquired ViaWest for $1.67 billion in August 2017. The rebranding from ViaWest to Flexential was announced in January 2018.
| Distance | Site | About |
|---|---|---|
| 0.32 miles | Edged Energy: Las Vegas LAS01 |
Edged Energy intends to construct a data center campus in Las Vegas, with operations expected to begin in Q1 2028.
|
| 0.97 miles | ISP.Net DC2 | |
| 1.82 miles | ISP.Net DC1 |
|
| 4.09 miles | Lumen: Las Vegas 2 | |
| 4.14 miles | Switch Las Vegas 5 | |
| 4.19 miles | Switch Las Vegas 2 | |
| 4.50 miles | Switch: Jones Boulevard Campus |
The company is developing two buildings, one measuring 199,000 sq ft (18,485 sqm) and the other 228,000 sq ft (21,180 sqm) in the southwest Las Vegas Valley to host specialized AI hardware.
|
| 4.50 miles | Switch: Jones 2 |
The company is developing two buildings, one measuring 199,000 sq ft (18,485 sqm) and the other 228,000 sq ft (21,180 sqm) in the southwest Las Vegas Valley to host specialized AI hardware.
|
| 4.91 miles | Lumen: Las Vegas (1 Aerojet) | |
| 5.97 miles | Flexential Las Vegas (Lone Mountain) |
The Lone Mountain Data Center in North Las Vegas opened in 2013. Flexential's Lone Mountain site is former ViaWest.
AwardedTier IV Design Certification by the Uptime Institute for the design documents
3,000 tons redundant, fault-tolerant cooling capacity
|
| 7.04 miles | Lumen: Las Vegas 3 | |
| 7.10 miles | Fiberhub - Las Vegas |
|
| 7.18 miles | EdgeConneX Las Vegas |
EdgeConnex has rights to adjacent space to accommodate expansion
|
| 7.42 miles | ColoXchange Las Vegas | |
| 7.57 miles | DataBank Las Vegas LAS1 |
The site was a former zColo (Zayo) facility before being acquired in 2020.
|
| 8.38 miles | Hyperscale Data Center Request Dataset | |
| 8.39 miles | Switch Las Vegas 7 | |
| 8.39 miles | Contegix Las Vegas | |
| 8.39 miles | Switch Las Vegas CORE Campus |
The Core Campus in Las Vegas, Nevada currently encompasses nine separate data centers with up to approximately 2.0 million GSF of space and up to 275 MW of 100% renewable power available to these facilities.
|
| 8.47 miles | Switch: Las Vegas 15 | |
| 8.51 miles | Switch Edge 1 | |
| 8.51 miles | Switch Las Vegas 12 | |
| 8.61 miles | Switch Las Vegas 8 | |
| 8.73 miles | Switch Las Vegas 11 | |
| 8.79 miles | Switch Las Vegas 10 | |
| 8.82 miles | Switch Las Vegas 9 | |
| 8.83 miles | Novva Las Vegas |
Novva’s newest purpose-built data center is located at 6115 Nicco Way, Las Vegas.
|
| 10.16 miles | Verizon: 2240 Corporate Cir | |
| 10.75 miles | Hyperscale Data Center Request Dataset |
|
| 16.54 miles | Novva: Apex Industrial Park |
Novva Data Centers, a US operator, has purchased nearly 205 acres within the North Las Vegas Apex Industrial Park from VanTrust Real Estate.
|
Flexential is a U.S. data center operator formed when Peak 10 acquired ViaWest in August 2017 for $1.67 billion. The company subsequently rebranded in January 2018 as a single company.
The company provides colocation, interconnection, cloud, and managed services. The company is backed by private equity firm GI Partners, which agreed to acquire Peak 10 in 2014. ViaWest was founded in 1999 in Denver and Peak 10 in 2000 in Charlotte, with each building regional data center portfolios before combining in 2017.
September 06, 2025
Flexential
July 15, 2024
Las Vegas
November 07, 2023
Flexential
July 11, 2023
Flexential
September 12, 2022
Flexential
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas