Lumen Appoints Jim Fowler as CTO
December 11, 2025
Lumen Technologies
| Distance | Site | About |
|---|---|---|
| 2.52 miles | EdgeConneX Las Vegas |
EdgeConnex has rights to adjacent space to accommodate expansion
|
| 2.91 miles | Fiberhub - Las Vegas |
|
| 3.22 miles | ColoXchange Las Vegas | |
| 3.37 miles | Verizon: 2240 Corporate Cir | |
| 3.44 miles | DataBank Las Vegas LAS1 |
The site was a former zColo (Zayo) facility before being acquired in 2020.
|
| 4.56 miles | Hyperscale Data Center Request Dataset |
|
| 4.58 miles | Switch Las Vegas 5 | |
| 4.67 miles | Lumen: Las Vegas 2 | |
| 4.72 miles | Switch Las Vegas 2 | |
| 5.74 miles | ISP.Net DC1 |
|
| 6.54 miles | ISP.Net DC2 | |
| 6.92 miles | Hyperscale Data Center Request Dataset | |
| 6.92 miles | Contegix Las Vegas | |
| 6.92 miles | Switch Las Vegas 7 | |
| 6.96 miles | Switch Las Vegas 12 | |
| 6.98 miles | Switch Las Vegas CORE Campus |
The Core Campus in Las Vegas, Nevada currently encompasses nine separate data centers with up to approximately 2.0 million GSF of space and up to 275 MW of 100% renewable power available to these facilities.
|
| 7.04 miles | Flexential Carson I & II |
|
| 7.08 miles | Switch Edge 1 | |
| 7.12 miles | Edged Energy: Las Vegas LAS01 |
Edged Energy intends to construct a data center campus in Las Vegas, with operations expected to begin in Q1 2028.
|
| 7.17 miles | Switch Las Vegas 8 | |
| 7.18 miles | Switch Las Vegas 11 | |
| 7.32 miles | Switch Las Vegas 10 | |
| 7.33 miles | Switch Las Vegas 9 | |
| 7.56 miles | Switch: Las Vegas 15 | |
| 9.96 miles | Switch: Jones 2 |
The company is developing two buildings, one measuring 199,000 sq ft (18,485 sqm) and the other 228,000 sq ft (21,180 sqm) in the southwest Las Vegas Valley to host specialized AI hardware.
|
| 9.96 miles | Switch: Jones Boulevard Campus |
The company is developing two buildings, one measuring 199,000 sq ft (18,485 sqm) and the other 228,000 sq ft (21,180 sqm) in the southwest Las Vegas Valley to host specialized AI hardware.
|
| 11.14 miles | Lumen: Las Vegas (1 Aerojet) | |
| 11.84 miles | Flexential Las Vegas (Lone Mountain) |
The Lone Mountain Data Center in North Las Vegas opened in 2013. Flexential's Lone Mountain site is former ViaWest.
AwardedTier IV Design Certification by the Uptime Institute for the design documents
3,000 tons redundant, fault-tolerant cooling capacity
|
| 13.31 miles | Townsite Solar 2: Boulder City |
Townsite Solar 2 LLC has proposed a high-density AI data center campus on 88.5 acres of city-owned land in Boulder City, Nevada.
|
| 13.55 miles | Novva Las Vegas |
Novva’s newest purpose-built data center is located at 6115 Nicco Way, Las Vegas.
|
| 19.72 miles | Novva: Apex Industrial Park |
Novva Data Centers, a US operator, has purchased nearly 205 acres within the North Las Vegas Apex Industrial Park from VanTrust Real Estate.
|
The combined company of CenturyLink and Level(3) has one of the largest networks in the world.
The combined company of CenturyLink and Level 3 is a patchwork of data centers that span over Europe, North America, and Latin America. The data centers came through acquisitions that include Global Crossing (2011) and TW Telecom (2014).
December 11, 2025
Lumen Technologies
July 15, 2024
Las Vegas
April 15, 2024
Lumen Technologies
November 10, 2023
Lumen Technologies
October 16, 2023
Lumen Technologies
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas