Lumen: Las Vegas 3

Latest Podcast 3944 Silvestri Ln
Operational
Fully operational facility
Operated by:

Lumen: Las Vegas 3

░░░░░░ Login to view SqFt
Total Building Size
░░░ Request Dataset MW
Total Power

Map and Nearby Locations

3944 Silvestri Ln
Lumen Technologies Sites
Nearby Facilities

Sites within 15 miles of Lumen: Las Vegas 3

Distance Site About
2.52 miles EdgeConneX Las Vegas
EdgeConnex has rights to adjacent space to accommodate expansion
2.91 miles Fiberhub - Las Vegas
3.22 miles ColoXchange Las Vegas
3.37 miles Verizon: 2240 Corporate Cir
3.44 miles DataBank Las Vegas LAS1
The site was a former zColo (Zayo) facility before being acquired in 2020.
4.56 miles North PointInterested in this information?Contact us
4.58 miles Switch Las Vegas 5
4.67 miles Lumen: Las Vegas 2
4.72 miles Switch Las Vegas 2
5.74 miles ISP.Net DC1
6.00 miles Switch: Apex Industrial Park
Switch has acquired a combined 316 acres at Apex Industrial Park in North Las Vegas, Nevada, through two land purchases totaling $180.5 million—including 176 acres acquired in January 2026 for $85.5 million and an additional 140 acres acquired in March 2026 for $95 million. The combined site represents a large-scale landholding for future data center campus development.
6.54 miles ISP.Net DC2
6.92 miles CoreWeave: US West LAS1
6.92 miles Contegix Las Vegas
6.92 miles Switch Las Vegas 7
6.96 miles Switch Las Vegas 12
6.98 miles Switch Las Vegas CORE Campus
The Core Campus in Las Vegas, Nevada currently encompasses nine separate data centers with up to approximately 2.0 million GSF of space and up to 275 MW of 100% renewable power available to these facilities.
7.04 miles Flexential Carson I & II
7.08 miles Switch Edge 1
7.12 miles Edged Energy: Las Vegas LAS01
Edged Energy intends to construct a data center campus in Las Vegas, with operations expected to begin in Q1 2028.
7.17 miles Switch Las Vegas 8
7.18 miles Switch Las Vegas 11
7.32 miles Switch Las Vegas 10
7.33 miles Switch Las Vegas 9
7.56 miles Switch: Las Vegas 15
7.70 miles Switch: Armory Building 2
The central data center building in Switch’s approved three-building Armory Campus development.
7.78 miles Switch: Armory Building 1
The northernmost of three identical data center buildings approved for Switch’s Armory Campus in Enterprise.
7.78 miles Switch: Armory Building 3
The southernmost data center building approved for Switch’s Armory Campus near Las Vegas.
9.96 miles Switch: Jones 2
The company is developing two buildings, one measuring 199,000 sq ft (18,485 sqm) and the other 228,000 sq ft (21,180 sqm) in the southwest Las Vegas Valley to host specialized AI hardware.
9.96 miles Switch: Jones Boulevard Campus
The company is developing two buildings, one measuring 199,000 sq ft (18,485 sqm) and the other 228,000 sq ft (21,180 sqm) in the southwest Las Vegas Valley to host specialized AI hardware.
11.14 miles Lumen: Las Vegas (1 Aerojet)
11.84 miles Flexential Las Vegas (Lone Mountain)
The Lone Mountain Data Center in North Las Vegas opened in 2013. Flexential's Lone Mountain site is former ViaWest. AwardedTier IV Design Certification by the Uptime Institute for the design documents 3,000 tons redundant, fault-tolerant cooling capacity
13.31 miles Townsite Solar 2: Boulder City
Townsite Solar 2 LLC has proposed a high-density AI data center campus on 88.5 acres of city-owned land in Boulder City, Nevada.
13.55 miles Novva Las Vegas
Novva’s newest purpose-built data center is located at 6115 Nicco Way, Las Vegas.
19.72 miles Novva: Apex Industrial Park
Novva Data Centers, a US operator, has purchased nearly 205 acres within the North Las Vegas Apex Industrial Park from VanTrust Real Estate.

Lumen: Las Vegas 3 Data Center Photos See all

Operating Company

Operated by:

The combined company of CenturyLink and Level(3) has one of the largest networks in the world.

The combined company of CenturyLink and Level 3 is a patchwork of data centers that span over Europe, North America, and Latin America. The data centers came through acquisitions that include Global Crossing (2011) and TW Telecom (2014).

A Timeline of Level 3 Acquisitions

  • 2020: CenturyLink rebrands as Lumen Technologies
  • 2017: CenturyLink acquired Level 3's data centers and network for $34 billion
  • 2015: Black Lotus (for Level3's DDoS mitigation product)
  • 2014 Level 3 acquired TW Telecom for $5.7 billion
  • 2012 Level 3 acquired Voxility
  • 2011 Level 3 acquired Global Crossing (GX) for $2.0 Billion
  • 2007: Level(3) acquired Broadwing for $1.4 billion
  • 2006: Level(3) acquired Progress Telecom for $137 million
  • 2006: Level3 acquired Looking Glass Networks for $96 million
  • 2006: Level3 acquired Telcove (Adelphia Business Solutions) for $1.2 billion
  • 2006: Level3 acquired ICG Communications for $163 million
  • 2005: Level 3 acquired WilTel for $680 million
  • 2002: Level3 acquired Genuity for $242 million
261
Facilities
115
Markets
279MW
Megawatts

News See all

Read Lumen Appoints Jim Fowler as CTO
Lumen Appoints Jim Fowler as CTO

Lumen Appoints Jim Fowler as CTO

December 11, 2025 Lumen Technologies

Lumen Technologies has appointed Jim Fowler as its executive vice president and chief technology and product officer. The new CTO is to succeed Dave Ward, who is leaving Lumen to become president and chief architect at Salesforce. Starting from January 6, Fowler will manage global technology and...

Read more
Read Vegas Sphere powered by 150 Nvidia RTX A6000 GPUs
Vegas Sphere powered by 150 Nvidia RTX A6000 GPUs

Vegas Sphere powered by 150 Nvidia RTX A6000 GPUs

July 15, 2024 Las Vegas

The Sphere in Las Vegas, popularly known for its globe shape and LED displays that cover 750,000 sq ft (69,677 sqm) inside and out is reportedly powered by 150 of Nvidia's RTX A6000 GPUs with each having a 48GB memory and maximum power consumption of 300W. “Sphere is captivating audiences not...

Read more
Read Lumen secures new contract from GAO
Lumen secures new contract from GAO

Lumen secures new contract from GAO

April 15, 2024 Lumen Technologies

Lumen Technologies has secured a contract worth about $73.6 million from the US Government Accountability Office (GAO) under the General Services Administration's Enterprise Infrastructure Solutions (EIS) program. This multi-million dollar contract will see Lumen modernize network, data, voice,...

Read more
Read US Defense Information Systems Agency awards $110 million contract to Lumen
US Defense Information Systems Agency awards $110 million contract to Lumen

US Defense Information Systems Agency awards $110 million contract to Lumen

November 10, 2023 Lumen Technologies

The US Defense Information Systems Agency has awarded Lumen Technologies a $110 million contract to provide mission-critical network services to the US Department of Defense (DoD). This contract has a timeline of five years, from November 30, 2023, through September 30, 2028. This contract is an...

Read more
Read Lumen sells CND customers to Akamai as it shuts down the business
Lumen sells CND customers to Akamai as it shuts down the business

Lumen sells CND customers to Akamai as it shuts down the business

October 16, 2023 Lumen Technologies

Lumen announced that it’s Content Delivery Network (CDN) business will be shut down and it has sold its customer contracts to Akamai. Both companies will undergo a transition services agreement for 90 days before Lumen completes its shut down. "We are deep into our transformation of Lumen and...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?