Townsite Solar 2 LLC

Townsite Solar 2 LLC

Townsite Solar 2 LLC Data Center Map

Townsite Solar 2 LLC Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Townsite Solar 2 LLC Locations

Townsite Solar 2: Boulder City

Las Vegas

Townsite Solar 2 (TS2), a Skylar Capital subsidiary developing in partnership with Arevon Energy and Overwatch Capital, is relocating its planned high-density AI data center campus outside Las Vegas from municipal land to federal jurisdiction.

View Data Center

Related News See all

Read Vegas Sphere powered by 150 Nvidia RTX A6000 GPUs
Vegas Sphere powered by 150 Nvidia RTX A6000 GPUs

Vegas Sphere powered by 150 Nvidia RTX A6000 GPUs

July 15, 2024 Las Vegas

The Sphere in Las Vegas, popularly known for its globe shape and LED displays that cover 750,000 sq ft (69,677 sqm) inside and out is reportedly powered by 150 of Nvidia's RTX A6000 GPUs with each having a 48GB memory and maximum power consumption of 300W. “Sphere is captivating audiences not...

Read more

Ready to Level up Your
Data Center Strategy?