Street Address
Interested in this information? Contact us
Operational
Fully operational facility
Operated by:

CoreWeave: US West LAS1

This site is leased from Switch in the Switch Las Vegas CORE Campus building

Map and Nearby Locations:

This Facility
CoreWeave Sites
Nearby Facilities

Sites within 15 miles of Campus Pro

Distance Site About
0.01 miles Contegix Las Vegas
0.01 miles Switch Las Vegas 7
0.06 miles Switch Las Vegas CORE Campus
The Core Campus in Las Vegas, Nevada currently encompasses nine separate data centers with up to approximately 2.0 million GSF of space and up to 275 MW of 100% renewable power available to these facilities.
0.13 miles Switch Las Vegas 12
0.16 miles Switch Edge 1
0.26 miles Switch Las Vegas 8
0.35 miles Switch Las Vegas 11
0.45 miles Switch Las Vegas 10
0.47 miles Switch Las Vegas 9
0.74 miles Switch: Las Vegas 15
3.61 miles DataBank Las Vegas LAS1
The site was a former zColo (Zayo) facility before being acquired in 2020.
3.79 miles ColoXchange Las Vegas
4.04 miles Fiberhub - Las Vegas
4.46 miles EdgeConneX Las Vegas
EdgeConnex has rights to adjacent space to accommodate expansion
6.92 miles Lumen: Las Vegas 3
7.11 miles Verizon: 2240 Corporate Cir
7.41 miles ISP.Net DC2
7.67 miles Switch: Jones 2
The company is developing two buildings, one measuring 199,000 sq ft (18,485 sqm) and the other 228,000 sq ft (21,180 sqm) in the southwest Las Vegas Valley to host specialized AI hardware.
7.67 miles Switch: Jones Boulevard Campus
The company is developing two buildings, one measuring 199,000 sq ft (18,485 sqm) and the other 228,000 sq ft (21,180 sqm) in the southwest Las Vegas Valley to host specialized AI hardware.
8.38 miles Flexential Carson I & II
8.62 miles ISP.Net DC1
8.68 miles Edged Energy: Las Vegas LAS01
Edged Energy intends to construct a data center campus in Las Vegas, with operations expected to begin in Q1 2028.
9.40 miles Switch Las Vegas 5
9.45 miles Lumen: Las Vegas 2
9.57 miles Switch Las Vegas 2
10.81 miles Switch: Apex Industrial Park
Switch has acquired a combined 316 acres at Apex Industrial Park in North Las Vegas, Nevada, through two land purchases totaling $180.5 million—including 176 acres acquired in January 2026 for $85.5 million and an additional 140 acres acquired in March 2026 for $95 million. The combined site represents a large-scale landholding for future data center campus development.
11.14 miles Hyperscale Data Center Request Dataset
13.26 miles Lumen: Las Vegas (1 Aerojet)
14.35 miles Flexential Las Vegas (Lone Mountain)
The Lone Mountain Data Center in North Las Vegas opened in 2013. Flexential's Lone Mountain site is former ViaWest. AwardedTier IV Design Certification by the Uptime Institute for the design documents 3,000 tons redundant, fault-tolerant cooling capacity
17.14 miles Novva Las Vegas
Novva’s newest purpose-built data center is located at 6115 Nicco Way, Las Vegas.
18.26 miles Townsite Solar 2: Boulder City
Townsite Solar 2 LLC has proposed a high-density AI data center campus on 88.5 acres of city-owned land in Boulder City, Nevada.

Center Beta Data Center Photos (See all)

Operating Company

Operated by:

CoreWeave is a specialized cloud provider, delivering a massive scale of GPU compute resources.

An NVIDIA Elite Cloud Solutions Provider for Compute and Visualization, CoreWeave builds cloud solutions for compute intensive use cases - VFX and Rendering, Machine Learning and AI, Batch Processing, and Pixel Streaming.

19
Facilities
0
Markets

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?