ColoXchange Las Vegas

Latest Podcast 823 Pilot Road
Operational
Fully operational facility
Operated by: ColoXchange

ColoXchange Las Vegas

░░░ Request Dataset MW
Total Power
░░░░░ Interested in this information? Contact us SqFt
Gross Colocation Size

Map and Nearby Locations

823 Pilot Road ( Suite A )
ColoXchange Sites
Nearby Facilities

Sites within 15 miles of ColoXchange Las Vegas

Distance Site About
0.24 miles DataBank Las Vegas LAS1
The site was a former zColo (Zayo) facility before being acquired in 2020.
0.39 miles Fiberhub - Las Vegas
0.70 miles EdgeConneX Las Vegas
EdgeConnex has rights to adjacent space to accommodate expansion
3.22 miles Lumen: Las Vegas 3
3.75 miles Verizon: 2240 Corporate Cir
3.79 miles Switch Las Vegas 7
3.79 miles Contegix Las Vegas
3.79 miles CoreWeave: US West LAS1
3.81 miles Switch Las Vegas 12
3.85 miles Switch Las Vegas CORE Campus
The Core Campus in Las Vegas, Nevada currently encompasses nine separate data centers with up to approximately 2.0 million GSF of space and up to 275 MW of 100% renewable power available to these facilities.
3.95 miles Switch Edge 1
4.02 miles Switch Las Vegas 11
4.02 miles Switch Las Vegas 8
4.16 miles Switch Las Vegas 10
4.16 miles Switch Las Vegas 9
4.27 miles Carrier-Neutral Data CenterInterested in this information?Contact us
4.41 miles Switch: Las Vegas 15
4.46 miles Switch: Las Vegas 14
4.59 miles Switch: Armory Bldg2
The central data center building in Switch’s approved three-building Armory Campus development.
4.66 miles Switch: Armory Bldg1
The northernmost of three identical data center buildings approved for Switch’s Armory Campus in Enterprise.
4.68 miles Switch: Armory Bldg3
The southernmost data center building approved for Switch’s Armory Campus near Las Vegas.
4.72 miles Switch: EVO AI Factory 2
The company is developing two buildings, one measuring 199,000 sq ft (18,485 sqm) and the other 228,000 sq ft (21,180 sqm) in the southwest Las Vegas Valley to host specialized AI hardware.
4.86 miles Switch: EVO AI Factory 1
The company is developing two buildings, one measuring 199,000 sq ft (18,485 sqm) and the other 228,000 sq ft (21,180 sqm) in the southwest Las Vegas Valley to host specialized AI hardware.
6.59 miles ISP.Net DC2
6.71 miles Switch Las Vegas 5
6.79 miles Lumen: Las Vegas 2
6.83 miles ISP.Net DC1
6.88 miles Switch Las Vegas 2
7.35 miles South TowerInterested in this information?Contact us
7.42 miles Flexential Carson I & II
7.62 miles Edged Energy: Las Vegas LAS01
Edged Energy intends to construct a data center campus in Las Vegas, with operations expected to begin in Q1 2028.
12.19 miles Lumen: Las Vegas (1 Aerojet)
13.11 miles Flexential Las Vegas (Lone Mountain)
The Lone Mountain Data Center in North Las Vegas opened in 2013. Flexential's Lone Mountain site is former ViaWest. AwardedTier IV Design Certification by the Uptime Institute for the design documents 3,000 tons redundant, fault-tolerant cooling capacity
15.00 miles Townsite Solar 2: Boulder City
Townsite Solar 2 (TS2), a Skylar Capital subsidiary developing in partnership with Arevon Energy and Overwatch Capital, is relocating its planned high-density AI data center campus outside Las Vegas from municipal land to federal jurisdiction.
15.34 miles Townsite DC: Boulder City
After withdrawing the first site, Townsite Solar 2 LLC is going for a new 80-acre federally owned parcel to build out the renamed Townsite Data Center.
15.38 miles Novva Las Vegas
Novva’s newest purpose-built data center is located at 6115 Nicco Way, Las Vegas.

Operating Company

Operated by: ColoXchange
0
Facilities
0
Markets
0MW
Megawatts

News See all

Read Vegas Sphere powered by 150 Nvidia RTX A6000 GPUs
Vegas Sphere powered by 150 Nvidia RTX A6000 GPUs

Vegas Sphere powered by 150 Nvidia RTX A6000 GPUs

July 15, 2024 Las Vegas

The Sphere in Las Vegas, popularly known for its globe shape and LED displays that cover 750,000 sq ft (69,677 sqm) inside and out is reportedly powered by 150 of Nvidia's RTX A6000 GPUs with each having a 48GB memory and maximum power consumption of 300W. “Sphere is captivating audiences not...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?